The Elsmar Cove Wiki More Free Files The Elsmar Cove Forums Discussion Thread Index Post Attachments Listing Failure Modes Services and Solutions to Problems Elsmar cove Forums Main Page Elsmar Cove Home Page

View Full Version : QS-9000 - American Automotive Manufacturers Standard


Pages : [1] 2 3

  1. Chrysler's Annual Layout Requirements
  2. Measuring benefit of QS9000
  3. Complying with the requirement for Contingency Plans - 4.9.b.2
  4. Answer to Mr. Shailesh Patel 7 Jully 1998
  5. QS9000 3RD EDITION IMPLEMENTATION
  6. Process Flow Diagrams - How detailed the PFD has to be
  7. PPAP applicability - Supply molds to a Tier 1 supplier to GM
  8. Customer Satisfaction and Dissatisfaction Measurement
  9. Can my company be certified to QS TE Suppliment
  10. Human resource Management - QS9000 or ISO9000 have not addressed
  11. Monitoring Uptime
  12. Info on when Columbian Chemicals got QS9000
  13. Does QS-9000 reference a specific drawing standard?
  14. Verification of Purchased Product - At the subcontractor's premises - 4.6.4
  15. QOS for Tooling and Equipment - Having difficulty selecting a measurable
  16. Purchasing 4.6 - Statement on purchase orders: QS-9000 compliance preferred
  17. Customer advocacy should be contained in the company business plan
  18. Supplier Laboratory Requirements 4.10.6
  19. What defines a "change in process"
  20. 4.9.2 Maintaining Process Control - Maintaining ongoing process capability
  21. QS-9000 - R.I.P. (aka QS-9000 is Dead Meat and a 'Failure')
  22. Inventory Control and Production Planning and QA
  23. PPAP and the need to re-submit - Engineering change to a single component part
  24. 4.9.1 Process Monitoring & Operator Instructions
  25. QS-9000 Accreditation Body Interpretation
  26. 4.16 Quality Document
  27. ISO:9001:2000 Affect QS?
  28. TR16949 - Thread 2 - 1 More Spec - More Costs?
  29. Requirements for Registration
  30. 4.10.6 Supplier laboratory requirements - applicability
  31. QSR 3rd Edition, section II Run at Rate (run@rate) - What do they want?
  32. Classifying Characteristics
  33. QS9000 Adequacy Audit Matrix
  34. What exactly is needed on the subcontractor list for evaluating subcontractors
  35. Preventive and Predictive Maintenance - Information on procedures relating to 4.9.g.1
  36. QS-9000 TE Supplement & Service Providers
  37. Toyota & QS9000
  38. Lot integrity - We have many paperwork problems - Wht can I do?
  39. Where can I buy 10 CFR Part 21 in either PDF or Text format?
  40. QS9000 Software - Y2K
  41. QS-9000 seminars in Europe
  42. Job Descriptions - Employees complaining that job descriptions are not available
  43. QS9000's New Dock Audit Requirement
  44. QS 9000 Issues
  45. Third Edition Upgrade Surveillance
  46. Theodolite Calibration - Does anyone know what to do about the ingar bars?
  47. ed 3 4.9 qs 9000
  48. Ford Motor Company's Black/Gray/White Box Systems
  49. QS-9000 Compliant
  50. Approved Product Authorization
  51. Tooling and Equipment Manufacturer (TE Supplement) Registration Audit
  52. Facilities and Tooling Mgt. 4.2.6
  53. ISO Guide 25 - QS9000 Interpretations
  54. 4.11.2 Accredited Labs
  55. How many firms are third-party registered to TE (Tooling and Equipment) Supplement?
  56. TE REGISTRATION
  57. Laboratory Scope - Research and Development Labs - Do we need 2 Scopes?
  58. Interpreting 4.4.2.1
  59. New IASG 3rd Edition Interpretations
  60. Calibration Laboratory Requirements - 4.11.2.b.1 IASG Interpretations
  61. 4.1.4 Business Plan preparation
  62. QS9000 third edition - Do APQP, FMEA and PPAP have any significant changes
  63. 4.10.6.6 Lab Statistical Methods
  64. Advise on applicability
  65. Help on Analysis and Use of Data: Element 4.1.5
  66. Third day of our ISO 9001/QS9000/TE audit - What do we put on the letterhead?
  67. Audit Success
  68. Clause 4.19 Servicing - Mold Makers and do produce some parts off customers molds
  69. Final Product Audit (QS-9000 Paragraph 4.10.4.2)
  70. Facilities and Tooling Management
  71. TE9000
  72. Delivery Performance
  73. T. & E. Supplement
  74. TE REGISTERED
  75. QS 9000 Documentation
  76. Purchasing Review and Approval Process
  77. Skills qualification for design activity - What consistitues "qualification"?
  78. Ford's FMEA Handbook Supplement
  79. Is there any news about acceptance of TR 16949 by the Big Three?
  80. Maintenance Objectives
  81. QS9000 3rd edition, 4.17
  82. QS9000 Rev 3 Printing 3 Changes
  83. TE-Registration Audit
  84. Training - Strategic Issue
  85. Compliance Software Packages
  86. Laboratory Requirements - Company Partnering with a University
  87. Mold Making Area Mangement Dis-agreement
  88. TR16949 or QS-9000?
  89. 4.1.6.1 Notify certif. body
  90. QS9000 in the steel industry
  91. QS 9000 3rd Edition: Safety & Laboratory Scope
  92. In 4.11 under Calibration Services states three ways of doing calibration
  93. On-Time delivery
  94. Marketing Issues in QS9000
  95. Calibration Requirements
  96. Supplier Lab Requirements/Calibration Services
  97. QS9000 or TR 16949? Which should we register to? Management wants one or the other
  98. FORD's QOS (Quality Operating System) and Ford's Q1
  99. Hierarchy of Quality Systems and Lab Accreditation
  100. TES & QSA-TE
  101. TES & QSA-TE
  102. FRACAS - Failure Reporting And Corrective Action System
  103. Split Site Registrations
  104. 4.9.3 Modified Process Control Requirements
  105. Need Easy Performance Measures
  106. Calibration, should we.... Go-No-Go, thread, pin, and ring gauges
  107. ISO9001-2000 vs. QS9000 - What are the differences?
  108. Inventory Control - only manufacture parts AFTER receipt of a purchase order
  109. CI Prioritized Action Plan
  110. Costs To Register
  111. Semi-annual surveillance audit to Edition 3 - New Certificate is issued
  112. ISO / TS 16949 vs. QS9000
  113. Product Safety - 4.2.3.4 - Safety considerations relative to the supplier's product?
  114. Risk Management
  115. Operator Instructions
  116. Preventive Maintenance & Machine Manual Control
  117. Customer Service Agreements
  118. TE-QS9000
  119. 4.10.6.3 Laboratory Product Identification and testing
  120. Should our company be ISO 9001 certified or QS-9000 certified?
  121. Corrective & Preventive Database
  122. Corporate/Multi-site Registrations
  123. 4.5.2.1- Engineering Specifications
  124. Non-Conforming Area Requirements
  125. Verification of Rev Level of Customer-Supplied Standards
  126. 4.8 Product ID and Traceability
  127. Work Instructions - How detailed do work instructions need to be?
  128. 4.10.7 Interpretation - Extends the ISO Guide 25 requirement of calibration labs
  129. TE Supplement and QS9000 - The Link
  130. Predictive Maintenance
  131. Laboratory Environment Monitoring - Are there any "universally accepted" conditions?
  132. Internal Customer Satisfaction
  133. Environmental compliance
  134. Retention List - Documents and Records with mandated retention periods
  135. QSA-TE - Electronic version of the QSA_TE (2nd edition)
  136. Gage Calibration non QS-9000 Section
  137. As Appropriate -and- Shall - The importance of verbiage
  138. Gage Calibration non QS Area 2nd Topic
  139. Calibration - What do we need to calibrate and what don't we need to calibrate?
  140. Internal Laboratory Scope - Methods & Standards
  141. QS9000 vs ISO/TS16949
  142. Retro fitting QS9k requirements
  143. Para 4.6.3c - What is meant by the last part; ...number and issue of...?
  144. TE Web Sites
  145. Production Trial Runs Idiots Guide
  146. Text or Flow Charts? Mixing flow charts and text in procedures
  147. QS-9000 Clause 4.9.g.1 - Preventive Maintenance - Tool Wear Predictive Maintenance
  148. Need to submit level 3 PPAP - New or Multiple Presses - Injection Molding
  149. Older Interpretations
  150. Re-certification to QS9000/TE9001
  151. Mechanical Drawing Aprovals
  152. PPAP can we say waiver? A bureaucratic, non value-added mess
  153. Laboratory Capabality Verification based upon QS-9000 Third Edition
  154. Registration Logo, Cert, and Accred Mark
  155. Re-certification update
  156. Ford D145A - A contract document
  157. 4.2.3.4 Product Safety - What does this element want? I find it very ambiguous
  158. RE: 4.6.2.1 Subcontractor Development - T/E
  159. Calibration Requirements - SNC (National Systems of Calibration) accreditation?
  160. AIAG approved for sanctioned training delivery
  161. Should Tooling Documentation (such as tooling setup instructions) be Controlled?
  162. ISO9000:2000 and QS9000
  163. Is QS-9000 T/E Supplement appropriate terminology?
  164. QS-9000 Implementation: APQP / PPAP Documentation
  165. Checking and approval of drawings
  166. Due Date for QS9000 Audit Response
  167. Implimentation of Engineering changes
  168. Ford's FM&SP Procedures Manual PNP05-007
  169. TE Subcontractor Development
  170. Change the way we need to document our work - Copies of requirements?
  171. What is the difference between ISO9000 & QS9000?
  172. FM&SP Procedures Manual PNP05-007
  173. Effect of ISO900:2000 to QS9000
  174. Scope of Registration
  175. Who is OEM and OEM customers?
  176. Is there new revision of TE (Tooling and Equipment Suppliers Requirements)?
  177. TE Supplement and FMEA's
  178. Machinery Qualification Runoff test
  179. Preventive Maintenance Interpretation - Clause 4.9.g.1
  180. Is the 8D process a part of QS-9000? SEC:U 8D
  181. Can anyone recommend a consultant and/or registrar? T&E Supplement
  182. SPANISH TOPIC - QS9K y el Tech Standar 16949
  183. QS9000
  184. QS-9000 Sanctioned Interpretations
  185. Barcodes & Scanners
  186. QS 9000 TE Cert
  187. Calibration
  188. Control of External Documents
  189. R & M Guideline - Applicability and Training
  190. QS9000 vs. E-commerce
  191. Who offers QS9000 training (in Spanish) on topics like PPAP, FMEA, etc
  192. QS-9000, Appendix I, #6, Confidentiality - DaimlerChyrsler - Hank Gryn?
  193. QS Training - Am trying to tie training in with job descriptions
  194. English or German language of QS9000 books?
  195. Purchasing Procedure - Where to put Material Request in the Procedure
  196. Wrestling The Bull By The Horns
  197. 'Controlled' Documents
  198. Organizational Interfaces
  199. FMEAs, APQPs and Control Plans everytime?
  200. Starting QS9000
  201. Facilities and Tooling Management
  202. Dock Audits - 4.10.4.2 Final Product Audit
  203. Supplier Laboratory Requirements - 4.10.6 - Requirements for an In-House Laboratory
  204. Seeking registration - with a twist
  205. Documents
  206. Laboratory Scope - Need some advice regarding our Laboratory Scope
  207. No Participation
  208. Getting Mgmt support after registration
  209. Ford QOS - 3rd Party Auditing body able to assess the QOS Assessment?
  210. AMT TE Implementation Course
  211. TE 9000 - FMEA
  212. ISO/QS9000 REVIEW ASSESMENT
  213. QS9000 Specifications
  214. accounting dept. role in QS
  215. Maintaining Process Control
  216. Who charges for PPAP's? Is it common to charge customers for PPAP's?
  217. QS-9000 Approval
  218. ISO9001 to QS9000 Compliance Problems
  219. Certifying A Seltered Company
  220. QS 9000 System Awareness
  221. Need QS9000 cousulting and training services
  222. QS9000 Section 4.10.6.5
  223. QS9000 AND FORD
  224. Are we qualified for QS 9000 certification?
  225. Test Equipment at Work Station
  226. QS9-SC/QSA-SC
  227. Training Presentation for ISO9001 /QS 9000
  228. Registration upgrade ISO9001 to QS9000
  229. One World - One Quality System LOGO
  230. Tool & building Administration
  231. Control Plan content and fields - Format and Reaction Plan - 4.9.1 & 4.9.2
  232. What will auditors review when going over statistical techniques?
  233. Specification Standardization
  234. Short Run Mfg Seeking QS9000 Certification
  235. WE DID IT! Passed the muster of a QS9000 Certification Audit
  236. Stability of steel material features for small bended mechanical parts
  237. Personnal Employee Gages in Tool Room
  238. Are Polyurethane Foam Rolls Bulk Material?
  239. Ford QOS (Quality Operating System)
  240. Amend
  241. Requirement for "ESD" circuit boards - Clause 4.9.g1
  242. Monitoring Premium Freight Charges including any charges our supplier incurrs
  243. Business Plan - More than one to form the whole
  244. ISO/QS9000 Procedures/Flowcharts
  245. International Standards
  246. Incoming product is released for urgent production purposes prior to verification
  247. AIAG Labelling Requirements
  248. QS9000 Clause 4.10.7 requires Accreditation for External Laboratories
  249. QS9000 3rd edition - Is there a site where I can view/print the Third edition
  250. Traceability - Semiconductor supplement