- Integrating a Distributive Control System (DCS) into an existing 9001:2000
- Design & Development Clause 7.3, Applicable or not, What is rule?
- Customer Audit Finding against “where appropriate” of ISO 9001, Clause 7.4.2
- How do I add in the company we purchased and their products?
- Documenting an outsourced process - Distribution company with some manufacturing
- ISO certification guidelines for Software Company
- Validation of processes for production & service provision - Service industry
- Clause 7.5.4 - Can I exclude Customer Property?
- Does plant personnel need to be re-trained to the new ISO 9001:2008 revision??
- Canned ISO system for implementation and certification
- ISO 9001 & Quality Management training materials
- Which processes should be monitored to meet ISO 9001 Clause 8.2.3?
- Quality policy? A matter of interpretation?
- ISO 9001/TS 16949 - Standards to review - Booked to take a Lead Auditor course
- Which 'customer' in 8.2.4 Monitoring and Measurement of Product?
- ISO 9001:2008 Clause Interpretations and Clarifications
- Frequency of Management Review Meetings pre- and post- Internal & Surveillance Audits
- Management Review "planned interval" define please
- How long can my ISO 9001:2008 Quality Manual be?
- Lead Auditor Course - Case Study
- ISO9001 applicable statutory requirements
- Implement an ISO 9001 QMS in 3 months - Construction Company - Suggestions welcome
- Strategic Planning and Quality Management System Integration
- How to monitor customer satisfaction without surveys?
- Impacts on the Quality Manual due to changes in Top Management
- Can you explain about "QUALITY FOUNDATION"
- Cl 6.3, Infrastructure - How detailed I should get with this clause?
- Is ISO 9001 Transition (from 2000 to 2008 version) Training Required?
- 8.2.1 Monitoring & Measuring customer satisfaction
- 7.5.4 Customer Property - ISO 9001:2008 Intellectual Property
- Acquisition (Merger) of an ISO certified to ISO 9001:2000 company
- ISO9001 - A business case (selling the idea) to influence a management committee
- Re-approving documents when the responsible person leaves or changes responsibilities
- Checklist vs. Working Instruction - Differences
- Clause 7.2.1 Determination of requirements related to the product
- Why the general Valid period of QMS certificate is 3 years?
- Relationship between ISO 9001:2000 and EFQM
- 'Brainstorming' for the next edition of 9001
- What is External Documentation? Equipment Operation Manuals and Handbooks
- First draft of our QMS Process (Services Industry) - NewB to ISO - QMS Process Help
- What to include in the "Health and Safety" process
- Cl 7.5.1 & 7.5.5 for a Management Systems (Design+Training) Consultancy Company
- Help/Advice for Implementation - very small engineering company
- Cl 7.3 (Design and Development) for a consultancy company
- New Part Traceability - Lot number and finished product traceability
- New edition of ISO brochure on getting the best out of ISO 9000 family
- Corrective Action for lost project quality records
- Differences Between KPIs and Objectives/Targets
- ISO Registrar Using Quality Authors to perform periodical or recertification audits
- Recertification for ISO 9001:2000 - framework
- Examples of Quality Records Master List
- Legal Requirements - How to address this in ISO 9001:2008?
- Supplier Questionaire Content and which suppliers to appraise?
- Quality Manual sample for a RESELLER of networking equipment
- Where to Start to Implement ISO 9001?
- Manufacturing Aide - Putting a "Manufacturing Aide or note" on a customer print?
- ISO 9001 Certification at Satellite Locations - Service Company
- ISO 9001:2000 to ISO 9001:2008 Transition - Changing documentation
- Plastic printing packaging company - ISO 9001:2008 Clause 7.6
- Quality Policy - should a brief description of the company & its product be included?
- ISO 9001:2000 vs. ISO 9001:2008 differences and concerns
- ISO 9001 Clause 6.3 Infrastructure - Preventive Maintenance Requirements
- ISO 9001 vs. TL9000 - Which standard is more applicable?
- ISO 9001 Certifications Analysis by Industrial Sectors
- To write or not to write. That is the question. How many procedures should I write?
- Identifying measurable processes: How not to lose the forest behind the trees?
- Training needs identified - Audit Finding - Training calender not followed
- ISO 9001 Scope of R&D/IT sites
- Product pricing: Should it be in the scope of QMS
- ISO 9001 or ISO 9004? What are the main differences?
- Configuration Management - ISO 9001 - 7.6 Monitoring and Measuring Equipment
- Do Engineering Standards require periodic review? ISO 9001 4.2.4 (b)
- The Quality "Policy" - How does it differ from other company policies?
- My site is closing When should I inform my Registrar
- Do records like travelers fall under Cl 4.2.3 and Cl 4.2.4
- Moving from physical signatures to a paperless QMS - Process and approval sign offs
- Corrective Action for NCs (nonconformances)
- Quality Objectives for a Business Consulting Company
- Can a Process have two owners? Companies merged
- Improvement in ISO 9001 Clauses 5.5.2 b) and 5.6.2 g) - Are they the same or related?
- Seeking advice on Display norms of Quality Policy
- Should The Management Representative be a Manager?
- Infrastructure - How do you address it in your manual? ISO 9001 Clause 6.3
- Document Control for External and Internal Projects (overseas projects)
- Quality Manual Internal Audit at least once prior to certification audit
- ISO 9001 Clause 7.3.2 (a) Functional & performance requirement - what does it mean?
- Training Records for Contractor's Personnel.
- What do you think about ISO 9001:2008? - Interested in various points of view.
- Is the Accounting Department involved in ISO 9001?
- Certification Audit Help - General questions about some requirements
- Inspection Reports Required? Records are kept in a different country
- Questions asked in the main audit
- Why CB (Certification Body) Increase Audit Man days for ISO 9001:2008 upgrade?
- Quality Policy Content - Employee vs. All the persons working in the organisation
- ISO 9001 Certification for a single employee company
- Quality Objectives for my Sales Department
- Thermometer Calibration and calibration interval
- QMS General Formula - Satisfying the Requirements
- Tendering Policy and Standard of a Construction Company
- ISO 9001 Clause 7.4 Purchasing, Evaluation and Re-Evaluation - Consulting Company
- Quality Metrics (Step Down or Step Up Goals)
- PAS 99: 2006 (Publicly Available Specification)
- Vendor Rating System - IS:12040-1987 (India Standard) - Where to buy
- Self-controlled production process - OK according to ISO 9001 requirements?
- Level of Documentation and Records required for ISO 9001 in a Small Business
- Minimum training and experience required for an Internal Auditor
- What to do if Design Validation not possible?
- Auditing stable organisation with long certification history, minimal documentation.
- What to expect during Stage 1 and Stage 2 audits - Certification Audit ISO 9001:2008
- Where to Purchase an MS Word version of ISO 9001
- Master List of Records Required? ISO9001:2008 Clause 4.2.4 Control of Records
- Corrective and Preventative Action in Practice
- Question about clause 7.5.2 and special process
- Effectiveness of ISO 9001:2000 Implementation in small industrial organizations?
- Regular testing and monitoring of Food Quality in a Restaurant
- Where and What Template to Purchase for implementing ISO 9001
- Two companies with one Quality Policy
- Can I apply for AS9100 Straight Away? (We don't have any ISO certificates)
- Multiple Sites on a single certificate - Sampling of Multiple Sites / Plants
- ISO 9001 Clause 7.3 Design and Development for Service Firm
- Implementing ISO9001: 2008 in an unstable organisation
- ISO training Courses for one moving to IT Security and Audit
- ISO Standards for Government Agencies?
- Changing ISO 9001 registrars (second triennial)?
- Process Equipment and Supporting Service
- "Controlled" stamp for Controlled Documents - Any alternatives?
- How can measuring equipment deteriorate? (Re: 7.6)
- Operational QMS (Dubai) vs. compliant QMS (UK)
- Validation of processes 7.5.2 - We are a label printer
- Calibration vs. Verification - Can we calibrate dial indicators in-house?
- ISO 9001:2008 Gap Analysis checklist wanted
- Control of Documents in several languages and Document Linking
- ISO 9001 Certification - Statement of Work (SOW)
- No New Requirements in ISO 9001:2008?
- "Post-Delivery" & "Warranty" - ISO 9001:2008 Clause 7.2.1 & 7.5.1
- ISO registered company list _ those certified by non-accredited auditing firms
- Why the majority prefer to call each passage of ISO 9001 a ‘clause’?
- ISO 9001 Registration to get new customers - What other benefits would ISO bring?
- How to measure ECO (Engineering Change Order)
- Computer Software - ISO 9001 Clause 7.6 Control of Monitoring and Measuring equipment
- ISO 9001 Recertification vs. Certification
- Obtaining Customer Perception Information - Customer Satisfaction - Clause 8.2.1
- Is there any use of implementing ISO9001:2008 without going for certification?
- Steel Identification Colour Coding System
- Competency and Training Verification - Review of employee resume/application
- Positive Performance Indicator (PPI) for Energy/Utilities organization
- Design authority for a plastic product for the HGV industry - Possible Exclusions
- Outsourcing production processes - Employee overlap at different companies
- From where can I purchase OHSAS 18002:2008?
- Adequacy of specified purchase requirements - Clause 7.4.2 - Should be reviewed?
- Specific requirement for Internal Auditor training in ISO 9001?
- No Formal Design Process - Audit Finding - Help with Section 7.3 of ISO 9001:2008
- Merging multiple systems into one
- Separating "Shall" requirements from "Should" detail
- Understanding "Framework for setting objectives" in Cl. 5.3c
- Which version of ISO 9004 would you recommend to read today?
- Small Company Supplier Management Process
- Control of monitoring and measuring equipment - infrared thermometer for cross-check
- Format for Clause 7.5.2 (Validation of Processes)
- How many SOPs (Standard Operating Procedures) do I need?
- Classification of skill requirements such as VED - What is VED?
- Another surveillance done, another year of ISO9001 and PED registration
- Format of a Quality Manual with Multiple Standards
- Engineering Orders & Document Control Processes
- Management Review - Move to yearly from twice yearly
- Mandatory documented procedures - What processes do mandatory procedures belong to?
- ISO 9001 Certification with other standards
- Internal Audit NC ISO 9001 clause mapping - Quality objective achievement plan
- Service or Production? Water treatment, monitoring, and testing
- The Effect of implementation of an Integrated Management System & EFQM
- Nonconformances - Recently Audited on Recertification of ISO 9001:2008
- How long does it take to certify a scope extension?
- Minor nonconformance seems more opinion
- 6.4 Work environment of people? Or Work environment of equipment?
- Documentation requirements to the new 2008 revision
- What ever happened to the "Process is not systemic" finding
- Records management procedure
- One procedure or several? For "Developing Engineering"
- Inconsistent requirements (date) in two documents
- IT solutions Auditing - How to strategize the audit
- High order value suppliers - Analysis of Supplier Data 8.4d
- MR Service Contract - What should be included
- ISO 9001:2008 - New Requirements
- Determine vs. identify (as in clause 4.1 a), any differences?
- Approved Supplier List - Required to evaluate every supplier?
- ISO 9001:1994 to ISO 9001:2008 transition
- ISO 9001 and Balanced Scorecard?
- ISO 9000 video clip- download
- Distributors for class II medical devices in US - Do we need ISO 9001 or ISO 13485
- Which organization gives authority to accreditation bodies & certification bodies?
- Management Representative - Communicate with customers and other interested parties
- Anyone Italian out there, that can help?
- How to ke a training certificate with logo of IAF
- Activity process sub-process/procedures?
- Is QMS similar to quality plan if there is only one product?
- Realization process vs. Support process - Clause 7.1.1 in ISO 9004:2000
- QMS Details for an e-services company
- Control of nonconforming services
- QMS Documentation Language
- Design Review OR Design Change - Software development company
- Same Quality Manual - Different Exclusions (multisite) - 7.3 Design and Development
- ISO 9001:2000 version to ISO 9001:2008 - Necessary Document Revisions
- ISO 9001 requirement for SPC (Statistical Process Control)
- New to ISO 9001 - Where to start implementation
- Delivery Transportation - Asking about outsourced process clause 4.1
- How to implement Clause 7.3 - Design and Development
- Identification & Traceability procedure example
- ISO 9001 Implementation - Advice appreciated
- Traveler Map, Control Map, Request Map - Clause 7.3.3 Design and Development
- Can CBs audit according to OHSAS 18001 criteria when they audit your QMS?
- Purchase – Guidelines - Technical and Commercial Evaluation Guidelines for Products
- GAP Analysis for an ISO 9001, ISO 14001 and OHSAS 18001 system
- How-To's, Guides outside the QMS ?
- Is it possible to get ISO 9001 certification in 90 days?
- ISO 9001 vs. ISO 13485 - Which standard for pharmaceutical medicinal product
- Is a self-review of documents allowed in ISO 9000?
- CQC (China Quality Certification) did not issue an Audit Report
- Some question for update of ISO 9001:2008
- 3 types of Outsourcing - Software Company
- How to show that policies are properly communicated & Training Effectiveness
- Rental Warehouse Audit required?
- Exclusive Supplier Contract vs ISO 9001:2008
- How to understand NOTE 2 in the ISO 9000 definition of defect?
- File tracking and revision maintenance
- Warehouse Audit - Nonconformance or not - That is the question
- Deletion of whole or part of document vs. ISO 9001 Clause 4.2.3c
- Quality Manual with ISO 9001: 2008 Update
- ISO 9001:2008/CD Cor1 - What is the corrigendum?
- Any Government Contractors out there??
- Life after ISO 9001:2008
- Validity of ISO 9001 Certification
- Measurable Targets and Objectives - Envelope Printing Company
- Evidence of Supplier Corrective Action - Poor Responses by Suppliers
- ISO 9001:2008 Permissible Exclusions
- Update Certification to ISO 9001:2008
- Implement Clause 7.3 Design and Development procedure template example
- ISO/DIS 9004 Managing for the sustained success of an organization
- Complete change of the ISO 9001 Quality Management System
- Is it mandatory to monitor customer satisfaction for a non-regular product?
- ISO Team Organizational chart & functions for a small company
- Help a newbie to develop a QMS (Quality Management System)
- Exclusions for IT services - ISO 9001 Clause 7.3
- An alternative title (term) for Quality Policy?
- Complete ISO idiot on a steep learning curve - Quality Manual Review appreciated
- Type and Control of Outsourced Processes - ISO 9001 Clause 4.1
- Meeting behavior and lack of cooperation of attendees to manager
- What local standards are needed for ISO 9001 - Automatic doors
- Can we neglect (exclude) the ISO 9001 Calibration clause?
- Structure for Implementing ISO 9001 - Detailed action plan of the significant steps
- Tooling Design & Manufacture





