- Meeting requirements of Cl 5.4.1, ISO9001: 2008 (Quality Objectives)
- Notification of lost/damaged Customer Property - Customer Requirement
- Product Realization Procedure - How to comply with ISO 9001 Clause 7.1
- Abbreviated Quality System for Corporate Sales Office?
- Is there a need to notify your customers if your ISO 9001 certificate expires?
- What level of ISO are you certified to?
- Work instructions inaccurate - Need to update and improve documentation system
- Training Requirements Documentation and Records - Machine Shop
- ISO 9001:2008 Clause 6.3 Information Systems
- What is the difference between training needs and training requirements
- Is it a requirement to control all documents?
- Control of Documents - Is a unique format required?
- Calibration Statement - The requirements of 7.6
- Multi location certification
- Analysis and Improvement - ISO 9001:2008 Clause 4.1 Note 1 question
- Should all bottles and tubes in a laboratory be labeled?
- Calibration Procedures for Inspection Equipment?
- Keeping old ISO certificates of registration
- Calibration procedure wording
- Outsourcing "passivation" - Clause 7.5.2 Validation of Processes
- How to control external documents like drawings and standards
- Difference between Calibration & Verification and How to calibrate Go/No Go gauge?
- Iso in a box - Considering becoming a franchise for them
- Corrective/Preventative Action External - Corporate Supplier Quality Responsibility
- Defining our Scope of Certification - Manufacture & Sales of Butterfly Valve
- Manufacturing of Molding and Spare Parts - Is design clause 7.3 applied
- Is the Project Consultant allowed to see our internal quality procedures??
- Quality Objective not being met - Nonconformance or Observation?
- How long is ISO 9001:2000 good for (valid)
- Design & Development in Food and Beverage Services - Permissible exclusion or not?
- Updating Lead Auditor Certifications to ISO 9001:2008
- ISO 9001:2008 7.6 (traceable to international or national measurement standards)?
- Is a work instruction mandatory - CNC machine
- Small company where the Quality Manager and HR manager is the same person ?
- Benefits and needs of a non mandatory document where it is just a paper.
- Clarification of ISO 9001: 2008 Section 7.6 - Monitoring and measuring equipment
- ISO 9001: 2008 Implementation - Quality Manual First -> Questionable approach
- Where can I buy a PDF version of ISO 9001-2008 that I can print?
- Issuance of Corrective Action - Too many related to safety
- Is Accounting a Core process?
- What is Customer Owned Property for moulds and spare parts factory
- Strengthening Internal Audits
- Validation of Processes - Is Cl 7.5.2 applicable to bricktile firing in an oven?
- Purchasing mapped if not always participate? Is Purchasing a Support System?
- How is this for extremes in updating to the ISO9001:2008 rev
- Intial ISO 9001:2008 system COUPLE OF QUESTIONS
- Document Control (Stamping) - Is it necessary and why is it popular?
- ISO 9001 QMS (quality management system) for MBA College
- ISO 9001:2008 Certification of Single Program
- The 'user-friendly' Quality Manual
- Who regulates the price of ISO 9001 certification?
- If the inspection and analysis of raw material is very expensive?
- What happens if we evaluate supplier as not approved and there are no anothers?
- Awareness Training Presentation for 9001:2008
- S30100 steel bar spec - related specs, ASTM or AMS?
- New Quality Manual & Evidence of Implementation
- Outsourced Processes - Delivery of our products
- ISO 9001 for a Design & Engineering Consultancy
- Interpretation of the differences between ISO 9001: 2000 & 2008?
- Does ISO 9001 have nothing to do with profitability?
- How do you address clause 4.1 General requirements - Identify the processes
- How to go for ISO for packing industry - Is it needed?
- Most records are not signed by the person who used it
- Guidelines and Advice on how to develop a Company Newsletter
- Initial Supplier Evaluation Method - 7.4.1 Purchasing Process
- Processes Map matching procedures?
- Management Review Meetings - Different Sales Regions
- What is a Quality Engineering Department? What are the functions it handled?
- Should dimensions be recorded on an inspection record?
- Validity of ISO 9001:2000 Certificates - How to handle supplier ISO 9001 certificates
- Unsupported ISO areas in Process map? Finance and Accounting
- Help needed to link accounting and ISO procedures
- ISO 9001 certified by second party
- Input Request on Contract Review Procedure
- Is Heat Treatment for Metal a Special Process?
- How to document Reverse Engineering - We do Reverse Engineering
- Design and Development exclusion? We repair and refurbish electric motors
- Employee Medical Records - HR (Human Resources) Audit Question
- Enterprise company sharing corporate procedures?
- Who is responsible for Control of Outsourcing?
- Top Management (Exempt Staff) vs. Training and Competency
- Department KPIs - Plant, Machineries and vehicles (PMV)
- How to address Clause 7.6 for a software development organization?
- Product Development - Quality Manual - Subdivision of a global company
- Is it ok or risky for an auditor to recommend corrective action?
- How many hours a week do you devote to maintaining your QMS?
- Without Surveillance Audit, Is ISO certification still valid?
- Random Sampling vs. Thorough Review - Records to be Reviewed - Audit Finding
- Plan-Do-Check-Act-Anticipate cycle
- Records of the Results of Action Taken (8.5.2e) - Software Corrective Actions
- Training Effectiveness across Participants
- The ISO/TC176 ISO 9001 Handbook for Small Business
- Preventing, corrective for valves in field?
- Quality Policy - Need to have the revision number on the copy of policy displayed?
- ISO 9001:2008 & ISO 17020 - Differences
- Supplier's Property - Does 7.5.4 Customer property apply to supplier's property
- API Q1 - Definition 3.1.4 - Control Features
- Quality Balanced Scorecard? Example wanted
- ISO 9001 Certification & Sale of Manufacturing Plant - Transfer
- Management Review - Not all items covered during quarterly review.
- All Internally Generated Documents – Required to be Controlled or Not All?
- Quality policy - Need to include "Customer Satisfaction & Continual Improvement?
- Management Review Meetings - Auditor issued an Area of Concern regarding our method
- Cost of Processing a Corrective Action
- Evidence of Preventive Actions - Clause 8.5.3
- Record Legibility and Initials - Signing Records with sometimes Illegible Initials
- Review of Quality Control Plan requested
- Product Identification issue - Good/NG/NC/Pending or others
- ISO 9001:2000 to ISO 9001:2008 - Identification in meeting notes.
- Can a non-conformance be closed with "correction"?
- CAPA (Corrective Preventive Action) Form for critique
- Do you consider 'unintended' process output(s) while mapping a process?
- Advice for Upcoming Audit
- Process Flows/Turtles and ISO9001 - How and when they should be used
- CAR (Corrective Action Request) vs. PAR (Preventive Action Request)
- CAR´s Responsibilities? How the responsibility will be shared in CARs
- Sinking certificate
- ISO 9001:2008 - Quality Management vs. Quality Assurance
- Implementing Paperless for small IT Staffing Firm <10 Employees
- Has anyone been audited to the new 2008 standard? Any surprises?
- ISO 9001 vs Marketing/Branding
- Responsibilities for Record and Document Management, Development and Control
- "Actual" Audit Results Required?
- Time Frame for Responding to a Major Nonconformance - Registrar Audit
- NCR, Containment Action, CAR - Some Basic Questions
- Non Quality Engineer tasked with ISO certification.... Help needed..
- Traveler or Route Card in ISO 9001:2008 - Tool Shop
- Procedure Clause “Level” Numbering System explanation
- Control of Product Drawings - Engineers don't follow the same protocol
- What actions should I take to cover a change in premises
- A confusing Non-conformity - No defined QMS processes intended for 'Management'
- Maintenance Process Audit Check List to Assess Maintenance Process
- Non-Conformance Reports require Corrective Action?
- Fulfilling Training Requirements - We have NO Training Records on anything
- ISO 9001 Company Quality Objectives and Targets - Communication to Employees
- Changes in Revised Document are not Highlighted and Communicated
- ISO 9001 Implementation - Quality Manual is Dreary! Documentation Requirements
- How to Evaluate Competence of an Internal Translator
- Polite way to state Continuous Improvement is not a form?
- Procedure is not Implemented - Audit Finding - ISO 9001 Clause 7.5.1?
- Procedure for Customer Interaction?
- Customer Property ISO 9001:2008 Clause 7.5.4 - Does this include E-mails?
- What does the average employee need to know about the QMS
- ISO 9001 Consultant + Welding Inspector for Same Client - Conflict of interest?
- New ERP system - Need Doc. Numbers for ERP generated PO's, Packing Slips, etc?
- Guide in Writing a Quality Plan
- Peer Review prior to Stage 2 Audit - Acceptable or Not?
- How to Conduct a Review of Customer Order (Contract Review)?
- External Audit - Nonconformance Root causes
- ISO 9001:2008 - Can any one help me to understand this paragraph?
- ISO 9001 Standard: Useful to Certify a Soccer Club? Examples...
- Comparison Table for ISO 9001 & ISO/IEC 17020 Clauses
- Declining Standard of QMS Certification process
- Monitoring and Measurement of Product in a Shop Selling Frozen Meat
- Sources for Tips, Quotes with Graphics to be used for Creating Awareness?
- ISO 9001:2008 Information or Data Requirements for Domiciliary Care
- ISO 9001-14001 Internal Audit Matrix
- Internal Audit Checklist or a Protocol Guide wanted
- QMS Introduction - I have been asked to give a brief introduction of our QMS
- Case Study - Implementation of ISO 9001:2008 in Small Companies
- Certification process for small consultancy practice far away from main cities
- Feasibility of having one Quality Manual that documents 2 businesses?
- What is the difference between Process Objectives & Criteria for Effectiveness?
- Use of Old Forms and Documents in a New System
- How do we determine our Staff Competecy Levels - 6.2.2 Training
- Verbal Instructions - How does it hold up against the standard?
- Objective Evidence of Internal Auditors having Audit Clause 4.1.
- Can anybody provide a copy of ISO 9001:2008 standard
- The Process of the Identification of Key Equipments
- Transition from ISO 9001:2000 to ISO 9001:2008 and TS 16949:2002 to TS 16949:2009
- Change Management - From basic level to implement it succesfully
- Document Tree Examples Wanted
- Does Management Review need to be a Formal Meeting?
- ISO 9001:2008 vs. ISO 10012:2003 - Can anyone expain the need for 10012:2003
- Plastic Dip for Low Use Gages - Does it work?
- Daily Rate to bill for a Site Quality Manager - Construction
- Tips on How to Relax during Audit
- ISO 9001 Implementation Roadblocks - Small Manufacturing Company
- Where to buy an electronic copy of ISO 9001
- Motivation for IQA (Internal Quality Audit) Auditors
- Flow Chart showing Interaction of Core and Support Processes
- Post format for Design and Development Records
- Two Questions about Nonconformity - Number of Minor Nonconformities
- Validation - The process or product? ISO 9001 Clause 7.3.6
- This Is It - Tomorrow is the final decision - Finished the certification audit
- Is SPC & MSA is mandatory for ISO 9001:2008 - Automotive Parts Manufacturer
- Identification and Traceability 7.5.3 by Location
- Puzzle related to Quality for Internal Newsletter
- Suggestions on what to put on an Employee ISO 9001 Intranet page





