- Have you ever heard about TOSI (polymer)?
- Internal Audit Plan - Seperate audit plans for system, process, and for products
- What are the Differences between Customer Perception and Customer Satisfaction?
- TS 16949 Registrar's Ranking & Market Share
- TS 16949 - 8.1.2 - Over adjustment should be understood throughout the organization
- Customer Satisfaction Supplemental - How to meet the requirements of Cl. 8.2.1.1
- TS16949 External Calibration Laboratory Requirements - Thermocouples
- Do Supplier's Laboratories Need to be Accredited to ISO/IEC 17025
- 3 Year Strategy Sourcing Plan - Supplier Quality Manual
- Deming PDCA Cycle Automotive Mfg Sector Example
- SMMT gives Timetable for 3rd edition of rules
- Bending test for Plastics - ABS Blend with PC (polycarbonate)
- Identification of Special Characteristics - Cl 7.3.2.3 Interpretation
- DaimlerChrysler PSO Manual - Is April 2005 the most current?
- Suggestions on conducting an Internal Audit on 7.5.1.6 Production Scheduling
- ISO TS 16949 Registration for a Satellite Site
- Rough TS 16949 Implementation & Certification Time-line?
- Core Tools Forms Disk
- SPC Manual 2nd edition
- How do you justify that not all Suppliers need to be Audited?
- Online Internal Audit Refresher Training - TS 16949
- Does anyone know if there is much difference between TS 16949 and Nadcap.
- Change Control Required? Changes during the product gamma phase
- Implementing TS 16949 in a new stamping plant - Help please
- The 5 Core Tools Training for Internal Auditors
- Does a Lead Auditor need to be present at an audit?
- Chrysler requirements for First Piece Approval
- Company and Department Key Performance Index (KPI)
- Does TS 16949 standard update by next year?
- TS 16949 Audit Software - Documents and Templates
- Does all gauges mean every gage? Manufacturing Engineering (Paragraph 7.6.2)
- Including a toll MFG site under your TS 16949 Certification
- Example Letter of Acceptance to Supply w/o TS 16949 Registration
- TS 16949 Auditor Training Materials or Check List
- What is the full name of QKZ in product audit?
- Remote site which has two locations - Internal Communcations Failures - 5.5.3
- Extra registrar audit days due to Nonconformances?
- Implied tolerance - Nominal of the angle between 2 surfaces
- ISO TS 16949 Technical Specification available from the SMMT
- Substitute Process Owner - A Process Owner was unavailable during audit
- Do Gauges used for Maintenance of the Facilities Require Calibration
- Customer Complaint Process Flow Chart example needed
- Requirements in TS for PPAP - Full PPAP or as per Customer Requirement?
- Monitoring the monitoring process - Customer complaint process isn't being monitored
- Does a years worth of prototype manufacturing "count" for TS 16949?
- VDA Band 17
- Is ISO 9001 registration a prerequisite for TS 16949 certification?
- Cost Reduction Calculation Formula - KPI (Key Performance Indicators)
- Production start after stop
- General Motors requirements
- Quality System Software with TS 16949, Does it good?
- Are TS 16949 rules on Auditor Rotation Frequency About to Change?
- Chrysler Customer Specific Requirements - When to notify the registrar
- Company Scope stating Automotive has been deemed redundant and asked to remove...?
- Are 'Management Activities' a required Process Per Clause 4.1?
- Continuous Improvement Form - Really needed?
- New Project Application Form
- Problems with Internal Process Audit integration due to different CSR
- Corporate TS 16949 system or not? Several production locations world wide
- Basic TS16949 Awareness Presentation
- How to interpret TS Clause 7.5.1.4 Preventive and Predictive Maintenance?
- Meeting Requirements of TS 16949 Cl 6.2.2.4 - Employee motivation and empowerment.
- Until where goes ISO TS 16949 for Suppliers ?
- New IATF rules for auditor change
- Flow chart, FMEA, Control Plan for cable assembly for Automative industry
- ISO TS 16949 Corporate QMS
- Information Technology Process Audit - Suggestions for auditing IT
- Life Test vs. Durability Test - Differences
- "Opportunities for Improvement" definition in IATF Certification Rules?
- Deming Prize (TQM Implementation award) vs. TS 16949 Compliance
- Additional site to be included in TS Cert. (Common owners & some functions)
- TS 16949 certificate status after component production is stopped
- Layout inspection - product family approach?
- Any AIAG CQI-11 Experts - Hot dip galvanizing process not applicable?
- How often should the contract review be done? TS 16949
- How to Demonstrate Manufacturing Process Design Conformity - Capability
- Audit of the Manufacturing Process Effectiveness - 8.2.2.2
- Scope of Certification for one of three processes only?
- How to monitor the quality system every day
- Specified stages of design and development shall be defined - TS 16949 clause 7.3.4.1
- FIFO Inventory Managment System - TS 16949 clause 7.5.5.1
- What is the difference between service parts and production parts?
- First article, pilot run and preproduction trial run - Definitions
- Service agreement with customer - Service centre - Clause 7.5.1.8
- ICT (IT - Informations systems) turtle diagram
- Calibration of Rockwell hardness tester
- Copy of TS16949:1999 for reading purpose
- Supplier Qualification - Qualifying small suppliers and trading houses
- New TS 16949 release expected in January 2009
- Would taking the 14001 Lead Auditor Class & passing, meet the requirements TS16949?
- Is positive recall acceptable under ISO/TS 16949 : 2002
- Product Audit Summary Form needed
- Internal Calibration or Verification - Personnel Requirements
- Looking for Input on our Quality manual from TS 16949 Guru's
- Standard Methods - Internal Calibration Laboratory - What if there is no standard?
- Does a completed PPAP have to exist for TS 16949 registration
- TS 16949 Audit Minor non conformance - Outside Calibration Laboratory
- What is EMPB (Erstmusterprüfbericht = First Sample Test Report) yellow?
- How is everyone else handling Machine Condition Standards?
- In-House (Internal) Laboratory Scope Requirement
- Some information about TS 16949 Auditor Requalification
- AIAG Automotive Documents in Spanish
- Extremely fast TS 16949 implementation
- TS Certification for Manufacturer of Aftermarket Automotive Parts?
- Monitoring Tool Wear for Predictive Maintenance - Data evaluation methodogy
- A problem with our TS 16949 certificate number.
- Problem - Is company GM supplier or not?
- PPK, CPK of >= 1.67 Automotive Requirement and Auditing
- TS 16949 - Design Exemption - Seeking a procedure/exclusion verbiage
- Selling parts as TS16949 compliant, but not holding TS16949
- Process FMEA in a testing facility
- UKAS/ISO 3rd party calibration of non product critical equipment
- Nonconformities on TS16949 recertification audit
- TS 16949 lead auditor training
- SC: Significant Characteristics vs. Special Characteristics
- TS 16949 Phase 1 Requirement Question
- Clarification on "Customer Property" - TS 16949 Clause 7.5.4
- Gap Analysis - Three months until our ISO/TS 16949 3rd party surveillance audit
- Does Subaru require TS 16949 certification?
- From a Corporate scheme change to single site certification
- AIAG released IATF Authorization Rule 3rd edition (in English) on 10/1/2008
- TS16949 certificate for business unit (one half of the company)
- Can a waivers for external calibration labs be implemented via the PPAP process?
- Process Approach Requirement for Internal Audits in TS 16949
- Mapping AS9100 to TS16949 system?
- Software validation question - TS 16949 Clause 7.6
- Quality System Requirements for 3rd Party Inspection
- TS16949 Audit in Progress - 5.6.2 (b) “Customer Feedback” not in Management Review
- Ts-16949 certification received!
- TS16949 Audit Finding to 7.5.2 - Required Signatures
- Why are John Deere suppliers required ISO/TS
- Customer owned tooling identification requirements
- Registrars and Consulting - How far can a registrar go in consulting for a company?
- Tier II Automotive Paint Shop - questions questions questions
- Customer's Supplier Quality Manuals used by Auditor in a TS 16949 Audit
- Suppliers Monitoring their Processes - How to comply with Clause 7.4.3.2
- My summary of ISO/TS 16949 Implementation (in Indonesian)
- TS 16949 requirement - Requirements flow down to suppliers?
- 7.3.6.3 Product Approval Process - Raw materials and sub-contactors or all suppliers?
- External audit question - Number of on-site days to number of plant employees
- 7.6.3.6 PPAP from suppliers - Grandfather?
- Raw materials as bulk materials (polymer, adhesive, etc) for PPAP
- Critical Characteristics Identifier "§" ???
- IATF CB Communiqués
- Customer Required Control of Changes (Man, Machine, Method)
- Several questions about TS 16949 including associated ISO 9001 certificate
- ISO/TS 16949:2002 Certified company with new owners and name
- Attaching calibration due dates to gages - Sloppy technicians
- TS 16949 Clause 7.5.4 Customer Property, Intellectual Property requirements
- Example of a Prototype Program - Paccar request
- Aftermarket Parts manufactured on the same production lines as the OEM parts
- Job Set-up Work Instruction Requirement
- Purchasing from non ISO 9001 certified suppliers through a certified one.
- Multiple site certification vs Single site certification
- Supplier Development Process failed - Question regarding sub-suppiler audits
- The difference between a Document and a Record?
- ESD testers and providing calibration service - 7.6.3.2 External Laboratory
- Employee motivation and empowerment - Please some practical methods
- Where to purchase ISO/TS 16949 Training Handbook
- ISO/TS 16949: Requirement for Auditing the Sub-Supplier
- Reference or recommendation of items to be included in the Business Plan
- Checklist for Customer Specific Requirements (CSRs) for Delphi/Visteon/Chrysler/GM
- Seeking Production Control Plan samples
- Major vs. Minor Nonconformance - TS 16949 3rd Party Audit Question
- CAR for Re-certification audit and your opinions
- ISO/TS 16949:2009 Status - Anybody know the target publication date
- Gage R&R - Tolerance - APQP Forms Disk from the AIAG - Formulas
- Supplier Conformance - Using non-certified suppliers - TS 16949
- It is fair and legal to let a customer to make an assessment audit based on other cus
- Time frame for validity of ISO 9001:2000 Certifications
- Phase 2 Audit - OFI for Supplier Performance and Monitoring
- In car position check fixtures - Calibration frequency and How to Calibrate them
- Quotation Process example wanted
- Change Management System - Development vs. Production Changes
- Efficiency Indicator examples wanted - TS 16949 5.1.1 Process efficiency
- Contingency Plan for Field Returns
- ISO/TS 16949:2002 - Internal Laboratory Scope - Post good example please!
- Applicability of Standard Clauses on the SOP’s / Support Departments like IT
- Right title for IMS - Integrated Management Systems or System
- FAQ della 3° Edizione delle Regole per il Raggiungimento del Riconoscimento IATF
- Internal laboratory - applies only to Calibration or also to other laboratories?
- Process Status - Any TS 16949 requirements related to knowing the process status?
- New 8D format for TS16949 CSR (Customer Specific Requirements)?
- BMW Project - How does their APQP process work?
- Requirement for specific reference to documented procedures
- Calibration Frequency and training a new calibration coordinator
- Customer auditors audit w/o company quality representatives
- Company and group targets and goals not communicated
- What is ISO 16232? Road vehicles - Cleanliness
- Are 'Quality' Standard Certifications slowly losing their Credibility?
- What Constitutes a Field-Failure?
- CQI-9 #1.9 - Heat Treatment - Management shall review the furnace monitoring systems
- R&D line being used to supplement Manufacturing line
- Auditor Guide for ISO/TS 16949 available from AIAG
- Process description of "customer requirements"
- Internal Audit NC (Nonconformance) is not closed - Is it a nonconformity?
- Special characteristics symbols in work instruction - For whom?
- TS16949 vs. TPS (Toyota Production System) - Explaining the differences
- Company Director as Management Representative - TS 16949 Clause 5.5.2
- Attribute Gage Studies - What gages are required to have Measurement Systems Analysis
- GM Mega Supplier - General Motors Mega Supplier protocol regarding APQP help needed
- Does TS 16949 require inspection? Imported parts
- Remote location Internal Audit requirements - TS 16949
- Design Center Certification - Production parts in a prototype facility
- ISO 9001 Qualified Auditor and Internal TS Auditor Requirements
- Predictive Maintenance Services
- ISO TS 16949 Clause List or Manual
- How does ISO/TS 16949:2002 differ from ISO/TS 16949:2009?
- # Rules 3rd Edition Areas of Impact for Client Consideration
- MSA (Measurement System Analysis) Doubt on Analytic Method (Attribute Study)
- Customer ask for CPK 1.5 quality level
- ISO/TS 16949 - What's it worth?
- Incoming Receiving Inspection from Sister Plant
- Risk Analysis and Risk Reduction requirements in 7.2.2.2
- Is the 3rd Edition of the MSA Manual current?
- How Specific Does our TS Test/Lab Scope need to be?
- Material shelf of life expired - Notify Customer/Violate which clause?
- Difference between Regular and Auditor Edition of TS 16949?
- Customer Property Logs - Tracking customer property, specifically production tooling
- Help in meeting the requirements in 8.2.2.3 Product Audit of TS 16949
- Outsourced Maintenance Processes
- ISO/TS 16949 certified OEM vehicle plants in the US
- ISO/TS 16949 and Emergency Product Qualification
- Difference between corrective action impact and preventive actions.
- Plant Layouts - What should be in a Plant Layout?
- MSA and Control Plan - Satisfying Visual Inspection Requirements
- Introduction & Latest version of AIAG Control Plan request
- Unregistered bulk scrap metal suppliers - do they need to be ISO 9001 certified?
- Form to identify status of product on the production floor.
- Corporate Audit Scheme - 4 companies at different sites
- 7.6.3 Internal or External Laboratory? Measuring instruments used in production
- IMDS Submissions for multiple parts requested, but not Design Responsible
- 8.2.3.1 - What is the meaning of this text?
- Monitoring - Measurements at specified stages - Cl 7.3.4.1, TS 16949
- Comma between 'third party' and 'registered' in 7.4.1.2 - Why?!
- Discussion with Plant Manager (on the basis of ISO/TS 16949)
- The Future of ISO/TS 16949
- Supplier Classification - What are Automotive Class 1, 2, or 3 Suppliers?
- Do Calibration Suppliers need to be included in the list of Approved Suppliers?
- Document Disposition - Is a Control Plan a Record or Document
- John Deere Supplier - Are all the requirements of TS16949 necessary?
- Multi-Division QMS Certification - Pros & Cons
- ISO/TS 16949:2009 Required Processes and Documented Procedure Requirements
- Implementation of TS 16949 for Low Volume Production
- Updating our Laboratory Calibration / Verification Procedures
- AIAG's MMOG/LE Version 3 Rollout
- Product Design Skills - TS 16949 Clause 6.2.2.1 Requirement
- Customer Representative - Can 1 Customer Representative cover 2 different sites?
- CSR – Customer Specific Requirements
- Requirement 7.5.1.8 Service Agreement with Customer - What does it mean?





