The Elsmar Cove Wiki More Free Files The Elsmar Cove Forums Discussion Thread Index Post Attachments Listing Failure Modes Services and Solutions to Problems Elsmar cove Forums Main Page Elsmar Cove Home Page
Google
  Web Elsmar.com
*Please be aware that SOME RECENT forum threads may not yet be indexed by Google.

View Full Version : Examples of Non-conformances during ISO/TS 16949 pre/final audits


Sambasi
27th December 2004, 07:02 AM
I am working with Thai Baroda Industries Ltd. a manufacturer of Nylon tyre cord fabric used as reinforcing material in Tyres. We got ISO/TS 16949 last year.
I have compiled a list of non-conformances raised during pre-assessment and final assessment of TS-16949 audits. This has been compiled based on my discussions with MRs of other industries, auditors of certifying body and discussions in public seminars organised by our certifying body. Hope this will be useful for those who are in the process of pre-assessment/final assessment.
I request all of you to post your valuable inputs in this thread.
Wish you a Happy New Year.
-Sambasi

SilverHawk
27th December 2004, 07:13 AM
Sambasi,

I cannot understand the emaning of this NC finding :

 Many slippages in controlling system documents and technical documents


Perhaps, you can elaborate.

Thanks.

Sambasi
27th December 2004, 09:24 PM
Document control was not effective. Examples:-
-When new revision of procedures/ work instructions/formats were issued, the previous issues were not withdrawn.
-Drawings not updated after design review.
-When customer issued new spec.,old spcs. were still referred.