Hello, I have one four assembly lines doing different products from a same family. The assembly line approx cycle time is 30 sec and each line has 10 operations.
Right now each operator has the instruction to move in batches of six units max when an audible alarm sounds.
The process supplying these lines is a four welding workstations that can cycle the majority of the products below 30 sec, but some more complicated ones will take as much as twice that time, making it impossible to flow into the assembly line.
My idea is to use kanban at the end of the assembly line to send production instructions to the welding workstations, and a FIFO lane with some max quantity per line between the assembly lines and the welding workstation.
The requirement of units per day is around 1000.
Any idea on how many cards will I need and how to implement this kanban?
Thanks
Pablo.:bigwave:
Right now each operator has the instruction to move in batches of six units max when an audible alarm sounds.
The process supplying these lines is a four welding workstations that can cycle the majority of the products below 30 sec, but some more complicated ones will take as much as twice that time, making it impossible to flow into the assembly line.
My idea is to use kanban at the end of the assembly line to send production instructions to the welding workstations, and a FIFO lane with some max quantity per line between the assembly lines and the welding workstation.
The requirement of units per day is around 1000.
Any idea on how many cards will I need and how to implement this kanban?