The Elsmar Cove Wiki More Free Files The Elsmar Cove Forums Discussion Thread Index Post Attachments Listing Failure Modes Services and Solutions to Problems Elsmar cove Forums Main Page Elsmar Cove Home Page

View Full Version : Facilities and Tooling Mgt. 4.2.6


Lyndon Diong
29th December 1998, 06:09 AM
How do we evaluate the effectiveness of existing operations and processes? I am not aware of the methods that are available. Thanks

Marc
3rd January 1999, 09:28 PM
You start off by showing evidence of your planning throughout the APQP process.

To comply with "...evaluating the efectiveness of existing operations and processes..." you look to various 'control' systems. Tracking of output is one. Tracking scrap is another. Look to measureables your company or facility has established to monitor trends and problems. You are constantly (well, to some degree) evaluating what's happening. This is linked to continuous improvement where you are 'constantly' looking at measureables and operations and products and seeking ways to improve the product and processes.

So - look to your measureables and see what you have. Remember there will be different departments contributing. Manufacturing, of course, will have certain measurables. Materials will probably answer questions about "...storage and buffer inventory levels..."
and such. HR will probably have input.

Let us know what you do.

Any others have some help / ideas for compliance here?

Roger Eastin
4th January 1999, 10:21 AM
I think this evaluation also includes some "classical" IE stuff such as ergonomic considerations, optimized product flow through the process, etc.

Marc
5th January 1999, 03:52 AM
Yes, Roger, you are correct. On the other hand:
"...evaluating the efectiveness of existing operations and processes..."
But how does one evaluate ergonomic issues? For example I believe it is Honda which considers more than 4 moves per assembler as potentially problematic but I have no idea how to evaluate this. Any ideas?

Roger Eastin
5th January 1999, 09:15 AM
I am no Frederick Taylor, but I think there are standard metrics for optimizing (minimizing)the number of moves per operator. Also, there are work flow metrics which focus on product flow effectiveness. I think these are standard IE metrics, but I'm sure there are some budding IE's out there who could steer me straight!

Marc
6th January 1999, 08:54 PM
I guess the question here is how far a company has to go. I find it hard to believe, for example, that 50% of the companies out there do 'significant' ergonomic studies and I'll bet even less do monitoring for evidence of EFFECTIVENESS.

Do any of you do anything like this (tracking and evaluation for effectiveness of ergonimics)?

wanida
18th September 1999, 10:39 AM
Could it be possible to monitor through the development and plan to reduce injury, pain, and/or operator leave caused by ergonomic matter? The effectiveness might be evaluate through the success of plan.

Marc
19th September 1999, 04:04 PM
The question becomes what metrics you use - but sounds good to me.

Sam
20th September 1999, 07:40 AM
The "Toyota Production System" philosophy has helped me a lot in this element of QS9000.
Also, Arvin Industries is a great company to benchmark. They can be found on the Internet.They have implemented a system called "ATQPS".

wanida
20th September 1999, 12:02 PM
Sam
Could you please give us the web site/address of Arvin or the TOYOTA PRODUCTION SYSTEM you mentioned. This could be very helpful.

Sam
21st September 1999, 01:17 AM
For Arvin: Use search and type in Arvin Industries, then find the section for ATQPS.

The same for TPS you might also type in "Kanban" for more info. A good ref. book is "KanbanJust-in-Time at Toyota" by productivity press 503-235-0600.

I would recommend benchmarking Arvin, they have an excellent system and they are also QS-9000 registered.