The Elsmar Cove Wiki More Free Files The Elsmar Cove Forums Discussion Thread Index Post Attachments Listing Failure Modes Services and Solutions to Problems Elsmar cove Forums Main Page Elsmar Cove Home Page
Google
  Web Elsmar.com
*Please be aware that SOME RECENT forum threads may not yet be indexed by Google.

View Full Version : Failure Data of Cathode Stripping Machines - Reliability from the data attached


alokb
10th October 2006, 09:02 AM
Please find attached an Excel file having worksheets about failure data of Cathode Stripping Machines .I am interested in finding out reliability of stripping machine.
Somebody would like to help by working on these data to find out Distribution, Reliability, MTBF and MTTR , Shape etc .

Please let me know If any additional input is required.

Thanking you,

It would provide the best clarity about these terms to us.

Alok

Michael Walmsley
10th October 2006, 11:23 AM
There is quite a bit missing.
(1) What does duration stand for?
uptime or run time?
For each machine,what is the required operating time per day?

(2) What is your production throughput requirements?
Ex : Sheets strucked in the belt conveyor/chute (CSM-1 JUN)
out of 424 min duration you have 51 occurrences.
out of 424 minutes duration , how many sheets are supposed to pass through?

(3) You have a multi-modal nightmare. Try winnowing down the list to the top (5) or (10) issues and collect data daily for a week.

Once you have answered (1) and (2) above (3),resubmit.

alokb
11th October 2006, 03:28 AM
Dear Michale,

Thanks for your quick reply

Let me submit the 'Missing Bit'

1) Duration in the data sheet is down time /breakdown time in minutes.
The required operating time for each machine is 16 hours per day.
2) Production through put required is 518 tonnes cathode sheets
This implies approx. 221 sheet stripping per hours per machine i.e 3534 sheet per day.
3) we would try to work out details by combining failure types ,as suggested.

Alok

Michael Walmsley
12th October 2006, 08:16 AM
Sorry , I was out yesterday. I did get your message.
One last question-
Over what period was the data gathered?
Mike

alokb
13th October 2006, 01:30 AM
Dear Michale,


The data are for the month of June 06.,

Thanks and regards

Alok

Michael Walmsley
13th October 2006, 12:33 PM
I should have something for you by monday.

Not having the daily sheets , I can make no inference about the characterization of the reliability ( distribution type it fits).

I will assume an exponential time to failure and go from there.

Mike

Michael Walmsley
14th October 2006, 12:07 PM
Akolb,
See attached.
It is very terse.
Not having the daily sheets , I could make no inference about the characterization of the reliability ( distribution type it fits).

I had to assume an exponential time to failure and go from there.

AdrianTregoning
29th March 2007, 09:26 AM
Hi there,

Sorry I only found this thread by chance.
What type of reliability issues are you having? I happen to be in the desgin and manufacture of cathode stripping machines. ;)

Cheers
Adrian