Dear all,
Hope anyone can help me to solve my question...
Is it OK if I stated next process inspection to put in as the current process control detection on the previous process, after part left the station?
(e.g. 100% mechanical inspection to check the epoxy condition such as hardness, level of height on box, etc). TIA.
Regards,
Ceplox
Hope anyone can help me to solve my question...
Is it OK if I stated next process inspection to put in as the current process control detection on the previous process, after part left the station?
(e.g. 100% mechanical inspection to check the epoxy condition such as hardness, level of height on box, etc). TIA.
Regards,
Ceplox