A process average is equal to one of the specification limits when
Cpk = Cp
Cpk = 0
Cp > 1
Cpk = 1
Stijloor
29th July 2007, 07:01 PM
Hello kball,
Very simplistic explanation:
Cpk is negative: Mean is outside the spec limits
Cpk is Zero: Mean is equal to one of the spec limits
Cpk is 0 - .9999: Part of the 6 sigma limits outside spec limits
Cpk is 1: One end of the 6 sigma limits falls on a spec limit
Cpk is more than 1: 6 sigma limits fall within spec limits
Hope this will reduce your burnout.
Stijloor.
Bev D
29th July 2007, 08:14 PM
kball: so did you pass the test?