View Full Version : Material Handling Plan as Described in v5.5 of the PSO Document - Please critique


John B.
22nd October 2007, 08:28 PM
This is a copy of a Material Handling Plan for a shaft we are going to manufacture. This MHP is part of the Parts Handling Plan as described in v5.5of the PSO document. I am still working on the Containment on Non-Conforming Material and Routing Cards.

Included in this MHP is the Packaging Instructions of WIP containers and Maintenance Plan for WIP containers.

I am looking for constructive criticism of the MHP. Please try not to focus on the process or flow.

Thank you very much for your comments, suggestions, ideas and most of all for your time.

John B.

Scott Catron
23rd October 2007, 12:29 PM
Nice diagrams.

Just some proofreading items:

Page 4, step 5, "will be place" should be "will be placed".

Page 7, step 10, there is (6) by itself - If parenthesis are used I've usually seen this written as "six (6)". Also page 10, step 15; Page 12, step 21; Page 15, Step 30.

Page 8, step 11, numbers without parenthesis - not consistent with previous page's use of numbers.

Page 8, step 11, there is "MACH #5027" - previous step have referred to "MACHINE" spelled out. Also on Page 9, step 13, step 14; Page 10, step 16; Page 12, step 20 (MACh here); Page 12, step 22.

John B.
23rd October 2007, 01:34 PM
Scott, thank you very for input. I will make those changes. Thank you for taking the time to read our MHP.

John B.

lgm0211
23rd February 2009, 10:16 PM
Scott, thank you very for input. I will make those changes. Thank you for taking the time to read our MHP.

John B.
Thank you very much for you nice form.