The Elsmar Cove Wiki More Free Files The Elsmar Cove Forums Discussion Thread Index Post Attachments Listing Failure Modes Services and Solutions to Problems Elsmar cove Forums Main Page Elsmar Cove Home Page
Google
  Web Elsmar.com
*Please be aware that SOME RECENT forum threads may not yet be indexed by Google.

View Full Version : CMMI - overview please


Invicta
14th October 2008, 08:54 AM
It looks as if this will be introduced within the company to help improve our processes.

Can anyone please suggest a source of a simple overview.
At the moment there are so many new controls being looked at/tried that any comparison with other methods would be very useful.

Kind regards

Bernard

Marc
14th October 2008, 09:32 AM
Here is a start: Existing CMMI discussion threads (http://Elsmar.com/Forums/search.php?do=process&titleonly=1&query=cmmi).

CMMI: Capability_Maturity_Model_Integration

Summary:

CMMI is the successor of the CMM or Software CMM. The CMM was developed from 1987 until 1997. In 2002, CMMI Version 1.1 was released. Version 1.2 followed in August 2006. The goal of the CMMI project is to improve the usability of maturity models by integrating many different models into one framework. It was created by members of industry, government and the Carnegie Mellon Software Engineering Institute (SEI). The main sponsors included the Office of the Secretary of Defense (OSD) and the National Defense Industrial Association.

What product domains is CMMI now relevant to? Though its roots are in a scheme for software engineering, CMMI is highly generalised to embrace other kinds of product, such as the mass manufacture of electronic components. The word software does not appear in definitions of CMMI. This unification of hardware and software engineering makes CMMI extremely abstract. It is not as specific to software engineering as CMMM. Yet its usage outside of that domain appears limited.

Invicta
14th October 2008, 09:35 AM
Mark,

This was exactly what I was after.

Many thanks,
Bernard