GRISHAG
28th January 2009, 05:18 PM
Would you be so kind to help me in the following case.
I’ve got a proposal for tender from the potential customer.
The part of the proposal is as following:
“Acceptance of consignments delivered:
The customer shall conduct acceptance inspection on every consignment of goods in accordance to ANSI/ASQ Z1.4 Sampling Procedures and Tables for inspection by attributes to ensure a 99% confidence”.
Could you please let me know if the abovementioned requirement is clear enough or is any data missed (f.e., AQL, inspection level, single/double/multiply inspection, etc), or what is the way to find missing information using “99% confidence”?
I will be glad to receive your answer.
I’ve got a proposal for tender from the potential customer.
The part of the proposal is as following:
“Acceptance of consignments delivered:
The customer shall conduct acceptance inspection on every consignment of goods in accordance to ANSI/ASQ Z1.4 Sampling Procedures and Tables for inspection by attributes to ensure a 99% confidence”.
Could you please let me know if the abovementioned requirement is clear enough or is any data missed (f.e., AQL, inspection level, single/double/multiply inspection, etc), or what is the way to find missing information using “99% confidence”?
I will be glad to receive your answer.





