Comments Requested.
Did I missing anything major?
Do you think the "plain english" comment/description boxes attached the the ISO and VDI procedure boxes are a good idea? Comments on the "plain english" text?
NOTE: I'm still working on Manual, Procedure List, and (possible) design procedure/program, so all of our INTERNAL procedures may not be referenced yet.
Thanks in advance.
Bob M
Shaun Daly
16th July 2003, 01:09 PM
I liked it. Similiar to mine but layed out better :)
The only thing I can suggest is perhaps a bit more detail for the sub-realisation processes?
You have 1 box for "Build/Inspect Order", maybe flesh that out a bit?
Bob_M
16th July 2003, 01:15 PM
I liked it. Similiar to mine but layed out better :)
The only thing I can suggest is perhaps a bit more detail for the sub-realisation processes?
You have 1 box for "Build/Inspect Order", maybe flesh that out a bit?
Sub realisation process... Which section of our map is that?
---------
As far as Build/Inspect Order goes I tried to keep it simple on the map. The Procedure and related docs provide more info.
---------
Press room: We use part/tool specific job folders which contain stuff like control plans, drawings, setup sheet, and inspection reports. Inspections are performed during setup and throughout the work order. Operators inspect their own work. Additional "formal" final inspection is currently required for a few parts.
Weldind Department: Has an work instruction binder, and attribute-only inspection reports - Very basic - First piece and in-process (typically 100% because of manual assembly and need to check welds).
Shaun Daly
16th July 2003, 01:29 PM
Sub realisation process... Which section of our map is that?
---------
As far as Build/Inspect Order goes I tried to keep it simple on the map. The Procedure and related docs provide more info.
---------
Press room: We use part/tool specific job folders which contain stuff like control plans, drawings, setup sheet, and inspection reports. Inspections are performed during setup and throughout the work order. Operators inspect their own work. Additional "formal" final inspection is currently required for a few parts.
Weldind Department: Has an work instruction binder, and attribute-only inspection reports - Very basic - First piece and in-process (typically 100% because of manual assembly and need to check welds).
Sorry the sub real' process is the build/order bit. Maybe add 2 more boxes for your Press/Weld operations?
Michelle W.
17th July 2003, 10:38 AM
I would appreciate it if you could all e-mail me examples of your process maps. winterbottom.michelle@columbus.co.za
That would help me considerably
Many thanks
Michelle
:bigwave:
Bob_M
18th July 2003, 02:24 PM
I would appreciate it if you could all e-mail me examples of your process maps. winterbottom.michelle@columbus.co.za
That would help me considerably
Many thanks
Michelle
:bigwave:
Michelle W. I'm emailing you a copy of our DRAFT/First Try process map.
It has not passed thru our auditor yet, so just use it as a reference.