ChrisB
15th June 2000, 02:07 PM
Level 1: Warrant only(possibly with Appearance Approval Report(AAR))
Level 2: Warrant with samples, drawings, inspection results, lab and functional results, AAR
Level 3: All the above plus: process capability results, capability study, process control plan, gage study, FMEA, PFD--all submitted to customer
Level 4: per level 3, without parts
Level 5: At supplier location: same as level three
Level 2: Warrant with samples, drawings, inspection results, lab and functional results, AAR
Level 3: All the above plus: process capability results, capability study, process control plan, gage study, FMEA, PFD--all submitted to customer
Level 4: per level 3, without parts
Level 5: At supplier location: same as level three



