Pages: 1
2
Alternatives to welding two pieces of aluminum extrusion together at a miter joint
Measurement of long pieces of Aluminum extrusions
Juice seperation in 50% Orange Juice cordial
Ultrasonic Welder Branson 8700 series Service manual
Is there a standard concentricity?
Need New AMS 2750 Compliant Temperature Data Logger
Dry vs. Wet Grinding
Intermittent failures either due to component or machine variations
Requesting help on SMT related issues (Moisture Sensitive Components)
Traceability in Electronics Assembly
Labeling and Identification of stainless steel parts in process
Soliciting recommendations for a fast turnaround calibration house - Mass Flow Meter
Dimensional change with PA raw material product
Color Codes for different gases
Color Codes and visual floor marking - Are there any Standards?
Cost Estimation of Sand Casting Process including the Pig Loss in estimation
Numbering system for inventory of bolts, washer, and nuts
Taber Wear and Abrasion Testers
How to specify Paint or Plastic Color - Pantone or Manufacturer Specification?
Injection Moulding Tooling validation checklist - Example wanted
Phenolic Resin - Colour Variation - Will oxidation change its color?
How to evaluate or measure the complexity of product?
Information needed on Morflex Bimetal
Granite Surface Plates - Maintenance, DOs and DON'Ts
Can you change the test specifications based on Histogram?
Controlling CNC Machine Programs - Your recommendations appreciated
Steel Casting defects - Again - Pressure Test Failure
PCBA Visual Inspection Tools & Methods - discounting Optical Tools
Gloss/color - How much does gloss affect the appearance of color?
German drawing of cylindrical gear - Glossary - What does "a" or "Aae/Aai" mean?
Step by step process for Wire Harness Fabrication needed
Manufacturing Milling and CNC FMEA Examples
Holes or Voids in co-extruded 65A TPE & 50D part
Check sheet for assembly operation station audit
Control of a Harness Board - Our auditor wants the engineer to Control
Cleanroom vs. Clean hood - MIL-PRF-38534, Class K (space level) for hybrids
Wordless Assembly Instruction examples
Photomask Processing Equipment Manufacturing and SPC
Costing work sheet for Plastic Injection
Injection Molding Process Regulations
Ultrasonic Welding of PBT plastic parts - Defining the cause of over-welding
Cleanroom Class for hybrids
The Unholy Trinity - Sales, design and production
Material Handling & Storage work instructions
ASTM F 745-07, Specification for 18Chromium-12.5Nickel-2.5Molybdenum Stainless Steel
RUBBER PART has a special strong smell - Over-moulding with NBR rubber
Measuring Variation in Straightness of Barstock
Steel Casting Defects (Cold Shut) - Expert Advice needed
Manufacturing Cost Estimation and Costing Procedures
Visual Acceptance Criteria for Porosity in Ferrous Castings
OEE for Food Manufacturing - Non Dairy creamer manufacturing
Overall Equipment Efficiency (OEE) calculation of 2 different scenarios.
Missing inserts in injection molding
I need help with containment practices - First off/coil change containment
Cladding on Brass - Seeking companies that clad on parts such as brass pieces
Have you ever been rejected for a reference dimension being out of tolerance?
Plating Internal Threads in Tapped Holes - Go Gage no longer enters
Recycling Thermoset Material
Plastic Identification/Test - Melt Flow Index to Determine Correct Material?
Part Number Assignment, Should be coded or Random?
Implementing external customer changes procedure
Inspection Help need to make a cast impression
Blueprint reading, Implied use? Drawing shows an implied orientation
Need help finding medical grade wire
ECO (Engineering Change Order) Revision - Letter change or part number change?
Heavy duty rust protection advice needed!
Disposal of Controlled Substances
FDA - "Net Quantity of Contents" - Manufacturing filling process
Gemba Lot / Box Label Printing?
SMT Mounter: 2 general questions (air release pressure & machine history)
Who does most of your inspection - QC or Production
What is acceptance criterion for get new machine ?
FPY (First Pass Yeild) Calculations for Sampling
Operating programs - Good or Bad? Looking at JobBoss
Process Control in Casting Industry?
Trying to decipher drawing - Hole Size
Corrective Action Template needed
Formula for determining finished good roll diameter
Yields & Through Put Rates - Food processing industry
Slip fit - Size on size dilemma for pin and plug gages
Chrome plating visual standards
What are the inputs and outputs of the general budget process?
Tolerance Chart in machining process (stack up)
Solderability - Objective Evidence of Conformity to Standards - J-STD-610
What would Cause hole size smaller during the punching process of plexiglass?
Average fill label - "e" Mark, probably a UK specific requirement.
Yellow stains on anodized surface
What is meant by two throws, three throws etc, when applied to Compressors?
Fullscope with Microsoft AX ERP System
Need help in defining a World Class Certified Workcentre
Effective FIFO (First In - First Out) - Materials Management
Changing manufacturer's part number
Dimensions and Tolerance Callout - Straightness of shaft - Concentricity
Caterpillar JS-13 Standard Required
Critical Component Definition
Gold Wire Intermetallic Test (Wirebonding Process)
Weld Specifications - EU vs. AWS - Are AWS procedures recognized by the EU?
Plant Layout System from Scratch (AutoCAD)
Customer Approval to Substitute Nylon 6/10 with 6/12?
Identifying the 7 Wastes and Adding "Lack of Creativity" as the 8th Waste
How does "Manufacturing Manager" differ from "Production Manager"?
OEE (Overall Equipment Effectiveness) Downtimes Calculation
Assembly Line Traceability using Green Tags - Conformance with ISO9001
Manufacturing Process for a Front Bumper - Passenger Car Application
Best ERP, MRP Application, considering Quality?
Intelligent Part Numbering Schema for Part/Material Traceability
Machine Tool Calibration - Machine Capability Studies on CNC Machine Tools
Brass bar stored in green wood boxes tarnished
Beverage Bottle Closure - Torque Problems - Rotary Cappers
Dimensioning Anodized Parts
Experts on Aluminum? 2024 T4 and T351 Bar Question
Test Method - DIN ISO 1133 for melt flow needed to verify supplier results
Need advice to implement CAPP (Computer Aided Process Planning) change.
Traceability of Product - Company A to Company B
MIL-PRF-38534 Cost to Implement
Do inserts need to be preheated to tooling temperature in injection molding?
316LVM Cannulated Mill Needed
Cleaning Validation Protocol Help
Soft Ware program for control of the assembly/manufacture process
Anodized Aluminum Surface Defects - Stains, raised surfaces, imperfections
What is the shelf life of injection molded plastic parts?
Industrial Engineering department hierarchy
Online Pantone PMS chart for opaque plastics
Overall equipment effectiveness - Computing OEE taking all machines taken together
What does "deburr" and "edge" mean?
Serial Numbers for Product - Common sense? Optical Components for Telecommunications
Changing the CNC program - Money Saving Idea - Thanks to all of you.
What to manage after Plastic Injection Molding - Plastic Parts
Thread Quality in Aluminium - Problems with the threads stripping out
What is an Epoxy suitable for autoclaving?
Validation & which processes are called special processes & why not all the processes
Problems with a counter bore & the I.D. hole - .0685mm to .0762mm I.D. hole
Thread Presence Detection - What are companies using?
Injection Molding Quality Assurance - Best methods, practices, tools, education
Hand Tool Selection to Remove Microjoints and Slivers off of Small Parts - Advice
Mass vs. Temperature vs. Time - Determining Time in a Temperature Controlled Room
Waivers - Deviations - Responsibility -- Potential departmental conflict of interest?
Line Accumulations - Are line accumulations acceptable in today's market?
Bowed Steel Blanks in Stamping Process
Does your Company Supply Calipers for Employees?
Single Minute Exchange of Die - Preparing to launch a SMED project
Facility setup for Substrate & PCB Visual Inspection
Product Development Management System (PDMS) that's too complex.
Eliminating Systemic Errors in the Labeling Process
Can we comingle Gauging Vision System and 3 Point Micrometers?
Characterization and Measurement of Surface Wear
Informing Customers of Process Changes - Is this considered a process change?
Rotary Slitter for Cutting Paper or Packaging Materials - How to make it?
Cost Estimating Spreadsheet for a CNC Machine & Weld Shop
Single Minute Exchange of Dies (SMED) Information
Work Sampling of a Manufacturing Operation - FORM needed
Is an empty inspection box on form OK? Suggestions?
Surface Finish parameters - Mechanical stylus based testing of a cylindrical part
Surface Finish Requirements (Ra 150) for Blasted Titanium Surfaces
Shelf Life - The best way to monitor products with an expiry date
Any rule to set Generic Process Target % (per cent)
Surface Finish Measurement Technique
Customer wants to Reduce GD&T Tolerances on Sheet Metal Subassemblies
Medical Devices and Mixed Lots
Benefits of an Out of Box Audit on High End IT Products
Automated Processing and Placing Parts
How to manage production? How to become an excellent production manager?
Manufacturing, Purchasing & Planning Functions under Engineering - Good idea?
How to classify maintenance level of equipments?
Tyco TMS 2000Plus Replacement
Generic Label Die Cutting Process flow
"Scale Counting" practices
Die Cutter for Kevlar Fabric
Which sample to use for PV test or DV test
How can I die cut foam - I'm thinking of a simple hand machine?
Production Planning, Scheduling and Warehouse Management
Traffic, Distribution, Imports - Reducing Cost, Traffic Process
6-32 UNC-2B Threads are Tight after Cleaning before Painting?
CNC Machining of Small Engineering Plastic Parts for the Semicon Industry
Pareto Analysis for Common Defects - To pareto or not to pareto
Potential Failure Mode - Mix Charge for Hardness - Casting Process
How to Create a Traceability System in Manufacturing Process
One Tailed Process Validation - Process with only a lower specficiation limit
Grade D Laboratory Environment Airlock Requirements
Energy Savings in Glass Tablewares Company - Continuous Improvement
KPIs for Verification Processes - Masters Thesis
Tooling Validation and Verification Improvement
Qualification of a Poron Gasket for a Silicon Acoustic Sensor Chip
Paperless Chart Recorder to Monitor Oven Cycle Temperatures
Cost of Duplicate Part Numbers
Process or Work Instruction (WI) to Change a Progressive Stamping Die
Certification of Raw Materials for RoHs Compliance
Heat Treatment Validation - Titanium (6Al 4V) for 2 hours @ 700 Deg C
Tool Kits to Reduce Direct Time on Milling Machine
Best/Worst Production Demonstration Runs (PDR) - Share yours
General MIG Weld Workmanship Standard or Procedure
Production schedule that adds actual value and makes sense?
this is only a test
Positional Tolerance Matrix to save us the the hassle of using the formula
MS21075L3 nutplates versus MF5000-3
Ideas On Wiring Configuration Control - Help STOP a Non Conformance!
Zinc Phosphate problems - Green Bath has turned White
Printing Industry Quality Control Traveler / Checklist needed
How do I set up GMP's for a flexible packaging converter?
Welding Process Control
vB Easy Archive Final ©2000 - 2009
- Created by Stefan "Xenon" Kaeser