T
theGrod
We have received a sample run of some product from a supplier. It was rejected. I don't think this should be addressed through our Nonconforming Product procedure or our Corrective Action procedure because we are still trying to see if they have the capability to produce the item. We don't have a work instruction for this in Design Control or Process Control. Any suggestions?