The Elsmar Cove Wiki More Free Files The Elsmar Cove Forums Discussion Thread Index Post Attachments Listing Failure Modes Services and Solutions to Problems Elsmar cove Forums Main Page Elsmar Cove Home Page

Go Back   The Elsmar Cove Forum > Common Quality Assurance Processes and Tools > Inspection, Prints (Drawings), Testing, Sampling and Related Topics
Forum Username


Elsmar Cove Forum Sidebar
Custom Search
Monitor the Elsmar Forum
Monitor New Forum Posts
Follow Marc & Elsmar
Elsmar Cove Forum RSS Feed  Marc Smith's Google+ Page  Marc Smith's Linked In Page   Marc Smith's Elsmar Cove YouTube Page  Marc Smith's Facebook Page
Elsmar Cove Groups
Elsmar Cove Google+ Group  Elsmar Cove LinkedIn Group  Elsmar Cove Facebook Group
Sponsor Links







Donate and $ Contributor Forum Access
Sponsored Links
Courtesy Quick Links

Links that Elsmar Cove visitors will find useful in your quest for knowledge:


Howard's
International Quality Services

Atul's
Symphony Technologies

Marcelo Antunes'
SQR Consulting

Bob Doering's
Correct SPC - Precision Machining


NIST's Engineering Statistics Handbook

IRCA - International Register of Certified Auditors

SAE - Society of Automotive Engineers

Quality Digest Portal

IEST - Institute of Environmental Sciences and Technology

ASQ - American Society for Quality

Reply
 
Thread Tools Search this Thread Rate Thread Content Display Modes
  #1  
Old 5th November 2009, 11:04 AM
Richard72 Richard72 is offline
Inactive Registered Visitor

 
Registration Date: Nov 2009
 
Posts: 1
Thanks Given to Others: 2
Thanked 0 Times in 0 Posts
Karma Power: 15
Karma: 10
Richard72 has less than 100 Karma points so far.
Please Help! Chain Sampling Plan explanation and help - Reducing sample sizes (compared to Z1.4)

Hi, I was hoping that someone might know of a resource that could offer some assistance with the concept of chain sampling.

We have a process that requires 100% visual inspection on every unit. All units can potentially suffer from 1 to 20 visual defects of differing root cause. On average, the defective percentage is 5% i.e. 5 % of all production has at least 1 of the 20 visual defects. The important criteria for us that the AOQL of any plan is 0.7%.

In trying to develop a plan(s) based on ANSI Z1.4, I used AQL's of 0.65, 0.4 & 0.25. The AOQL reduced as the AQL reduced of course but the problem is that at 0.25 AQL the AQOL was about 0.7, but here sample size exceeded Lot size so....still on 100% sampling (PS I was using sampling plan analyzer 2.0 for this).

I have now been asked to look at chain sampling as a method of reducing sample sizes (compared to Z1.4), but still maintaining an AOQL of 0.7%.

So, I have three questions I suppose;

1) If a plans AOQL = 2% at 5% defect rate, & you produce 1,000,000 units per year, does this mean that if you continue to input 5% defective parts on average (50,000), your plan will effectively filter 3% of them, thus outputting 2%? ...so AOQL = 2%

2) Are we trying to chase the rainbow here? If our product contains 5% defective parts, is there any plan that avoids 100% inspection while managing to deliver such a low AOQL (relative to incoming defects)

& Finally,

3) Does anyone know of any resource which can help me with chain sampling plans? I have a basic understanding of how they work but there does not seem to be as many examples or resources available on the web when compared to AQL based plans etc. from what i've read it looks like all the OC curves have to be manually calculated - worrying!

I'd be grateful for any assistance.
  #2  
Old 16th November 2009, 07:25 AM
harry harry is offline
Super Moderator

 
Registration Date: Sep 2005
Location: Johore/Malaysia
 
Posts: 5,955
Thanks Given to Others: 1,407
Thanked 2,749 Times in 1,910 Posts
Blog Entries: 2
Karma Power: 662
Karma: 17685
harry is appreciated, and has over 1700 Karma points.
harry is appreciated, and has over 1700 Karma points.harry is appreciated, and has over 1700 Karma points.harry is appreciated, and has over 1700 Karma points.harry is appreciated, and has over 1700 Karma points.harry is appreciated, and has over 1700 Karma points.harry is appreciated, and has over 1700 Karma points.harry is appreciated, and has over 1700 Karma points.harry is appreciated, and has over 1700 Karma points.harry is appreciated, and has over 1700 Karma points.harry is appreciated, and has over 1700 Karma points.harry is appreciated, and has over 1700 Karma points.harry is appreciated, and has over 1700 Karma points.harry is appreciated, and has over 1700 Karma points.harry is appreciated, and has over 1700 Karma points.
Re: Chain Sampling Plan explanation and help

Any help will be appreciated.
Sponsored Links

  #3  
Old 16th November 2009, 11:57 AM
Steve Prevette's Avatar
Steve Prevette Steve Prevette is offline
Deming Disciple

 
Registration Date: Feb 2004
Location: Aiken, SC
 
Posts: 1,999
Thanks Given to Others: 144
Thanked 1,057 Times in 559 Posts
Karma Power: 259
Karma: 11204
Steve Prevette is appreciated, and has over 1700 Karma points.Steve Prevette is appreciated, and has over 1700 Karma points.Steve Prevette is appreciated, and has over 1700 Karma points.
Steve Prevette is appreciated, and has over 1700 Karma points.Steve Prevette is appreciated, and has over 1700 Karma points.Steve Prevette is appreciated, and has over 1700 Karma points.Steve Prevette is appreciated, and has over 1700 Karma points.Steve Prevette is appreciated, and has over 1700 Karma points.Steve Prevette is appreciated, and has over 1700 Karma points.Steve Prevette is appreciated, and has over 1700 Karma points.Steve Prevette is appreciated, and has over 1700 Karma points.Steve Prevette is appreciated, and has over 1700 Karma points.Steve Prevette is appreciated, and has over 1700 Karma points.Steve Prevette is appreciated, and has over 1700 Karma points.Steve Prevette is appreciated, and has over 1700 Karma points.Steve Prevette is appreciated, and has over 1700 Karma points.
Re: Chain Sampling Plan explanation and help - Reducing sample sizes (compared to Z1.

Do you mean "sequential" sampling? Basically you start with a small sample, and if it is really bad you immediately reject, if really good you accept. If in a gray area in the middle, you sample more, compare to thresholds and if not met, keep going.

There is the hope of a reduced amount of samples required, but if the rate is on the borderline it can take longer than a simple sampling plan. Plus some processes may not lend themselves to sample some, check the results, go back and sample more, etc.
__________________
Steve Prevette
"A Passionate Statistician", ASQ CQE, ASQ Fellow
Thanks to Steve Prevette for your informative Post and/or Attachment!
  #4  
Old 16th November 2009, 12:06 PM
Mike S. Mike S. is offline
An Early 'Cover'

 
Registration Date: Mar 2002
Location: East Coast US
 
Posts: 1,819
Thanks Given to Others: 28
Thanked 75 Times in 54 Posts
Karma Power: 230
Karma: 1979
Mike S. is appreciated, and has over 1700 Karma points.Mike S. is appreciated, and has over 1700 Karma points.Mike S. is appreciated, and has over 1700 Karma points.Mike S. is appreciated, and has over 1700 Karma points.Mike S. is appreciated, and has over 1700 Karma points.Mike S. is appreciated, and has over 1700 Karma points.Mike S. is appreciated, and has over 1700 Karma points.Mike S. is appreciated, and has over 1700 Karma points.Mike S. is appreciated, and has over 1700 Karma points.Mike S. is appreciated, and has over 1700 Karma points.Mike S. is appreciated, and has over 1700 Karma points.Mike S. is appreciated, and has over 1700 Karma points.
Re: Chain Sampling Plan explanation and help - Reducing sample sizes (compared to Z1.

Take a look at a C=0 sampling plan (i.e. Squeglia) and you might find the AOQL you want with fewer samples.
__________________
Mike S. ("Gun Nut")
And they ask me why I drink....
Thanks to Mike S. for your informative Post and/or Attachment!
Reply

Lower Navigation Bar
Go Back   The Elsmar Cove Forum > Common Quality Assurance Processes and Tools > Inspection, Prints (Drawings), Testing, Sampling and Related Topics

Do you find this discussion thread helpful and informational?


Bookmarks


Visitors Currently Viewing this Thread: 1 (0 Registered Visitors (Members) and 1 Unregistered Guest Visitors)
 
Thread Tools Search this Thread
Search this Thread:

Advanced Forum Search
Display Modes Rate Thread Content
Rate Thread Content:

Forum Posting Settings
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off


Similar Discussion Threads
Discussion Thread Title Thread Starter Forum Replies Last Post or Poll Vote
AQL Sample Sizes - Explain how Sample Sizes in an AQL table are calculated Atish AQL - Acceptable Quality Level 4 29th October 2010 02:56 PM
Double Sampling Plan Explanation for * ThaRide Inspection, Prints (Drawings), Testing, Sampling and Related Topics 5 11th August 2009 03:01 PM
Sampling Plan - AQL effect on sample size BigEd09 AQL - Acceptable Quality Level 7 22nd June 2009 04:47 AM
Sampling Plan Sample Size Problem puddycat Inspection, Prints (Drawings), Testing, Sampling and Related Topics 1 14th May 2006 03:50 PM
Continuous Sampling Plan for small lot sizes: Does MIL-STD 1235B provide one? The Fixer Inspection, Prints (Drawings), Testing, Sampling and Related Topics 2 1st August 1999 09:40 AM



The time now is 04:30 PM. All times are GMT -4.
Your time zone can be changed in your UserCP --> Options.


   


Marc Timothy Smith - Elsmar.com
8466 LeSourdsville-West Chester Road, Olde West Chester, Ohio 45069-1929
513 341-6272