Elsmar Cove Forum Sidebar
|
|
|
|
Monitor the Elsmar Forum
|
| Monitor New Forum Posts
|
|
Follow Marc & Elsmar
|
|
|
Elsmar Cove Groups
|
|
|
Sponsor Links
|
|
|
|
|
|
Donate and $ Contributor Forum Access
|
 |
|
Sponsored Links
|
|
|
|
Courtesy Quick Links
|
 Links that Elsmar Cove visitors will find useful in your quest for knowledge:
Howard's International Quality Services
Atul's Symphony Technologies
Marcelo Antunes' SQR Consulting
Bob Doering's Correct SPC - Precision Machining
NIST's Engineering Statistics Handbook
IRCA - International Register of Certified Auditors
SAE - Society of Automotive Engineers
Quality Digest Portal
IEST - Institute of Environmental Sciences and Technology
ASQ - American Society for Quality
|
|
 |

18th August 2010, 10:14 AM
|
 |
Involved in Discussions
Registration Date: Jan 2007
Location: Michigan USA
|
|
Posts: 95
Thanks Given to Others: 20
Thanked 19 Times in 18 Posts
Karma Power: 35 Karma: 143  
|
|
Preventive Tool Maintenance - Preventive and Predictive Maintenance requirements
Hi everyone,
during our recent surveillance audit I received a minor non-conformance against Preventive and Predictive Maintenance requirement.
The write up is at follows:
The organization does not always ensure evidence of all Preventive and Predictive Maintenance requirements. Evidence of Predictive Maintenance where not able to be verified at time of Audit. (Tool Repair tracking sheet not up to date).
Few years back I started to keep track of our steel rule Die's that we maintenance ourselves, i.e Punches changed, rule changed, etc. But then with the slow down and down sizing in our Company, and people wearing more hats, I neglected to enter information into the log, therefor the write-up.
Now I want to make the log more simple, instead of this massive spreadsheet with this abundance of information as too Punch change, rule change, soldering etc, and just focus on how many parts are being produced of the Die before it is brought to the Tool room for repairs.
Our Tool guy says in general you can run approx.4500 parts of a die, before it needs any maintenance. Okay sounds good, but I don't want to answer the NC by giving a specific number and say that the tool needs to go to the tool room and be fixed. Because if the tool runs good, and parts are good, beyond the 4500 part mark, I am not going to a) have the Operator stop and tear her setup down, and b) my experience with a set number, if we are not right on the money and my CB comes in and audits and let's say we ran 4510 parts of the Die, it will result in a NC.
Then I have to take in consideration that every Operator runs different and also the Press(es) the Die's can be ran at.
I also don't want to hand our Operators another piece of paper for them to record the info. Papers can be lost easily, something could be forgotten to be recorded etc.
So my solution to this is, that I can record the Die #, date and amount of parts ran at First Piece Inspection ( I have all the above Info on the Shop order ) and just enter it on a Spreadsheet there.
When the Die does have to go to the Tool room, currently the Press Operators affix a Die repair tag to it, circle what needs to be done, what Press it came from and date. I can match the info to that and then add the parts total and eventually get some more current results to when to do Preventive maintenance.
My question is, does this sound simple enough, or am I'm making more work for myself? I mean with the log I had started, it just got bigger and bigger, but I couldn't really get no good results, and I don't want that to happen again. Any advise would be appreciated.
P.S Sorry this is so long.
|

19th August 2010, 03:30 AM
|
 |
Cross Forum Moderator
Registration Date: May 2003
Location: Charlotte, North Carolina.
Age: 65
|
|
Posts: 13,405
Thanks Given to Others: 2,940
Thanked 4,268 Times in 3,025 Posts
Karma Power: 1428
|
|
|
Re: Preventive Tool Maintenance - Preventive and Predictive Maintenance requirements
Quote:
In Reply to Parent Post by try2makeit
Hi everyone,
during our recent surveillance audit I received a minor non-conformance against Preventive and Predictive Maintenance requirement.
The write up is at follows:
The organization does not always ensure evidence of all Preventive and Predictive Maintenance requirements. Evidence of Predictive Maintenance where not able to be verified at time of Audit. (Tool Repair tracking sheet not up to date).
Few years back I started to keep track of our steel rule Die's that we maintenance ourselves, i.e Punches changed, rule changed, etc. But then with the slow down and down sizing in our Company, and people wearing more hats, I neglected to enter information into the log, therefor the write-up.
Now I want to make the log more simple, instead of this massive spreadsheet with this abundance of information as too Punch change, rule change, soldering etc, and just focus on how many parts are being produced of the Die before it is brought to the Tool room for repairs.
Our Tool guy says in general you can run approx.4500 parts of a die, before it needs any maintenance. Okay sounds good, but I don't want to answer the NC by giving a specific number and say that the tool needs to go to the tool room and be fixed. Because if the tool runs good, and parts are good, beyond the 4500 part mark, I am not going to a) have the Operator stop and tear her setup down, and b) my experience with a set number, if we are not right on the money and my CB comes in and audits and let's say we ran 4510 parts of the Die, it will result in a NC.
Then I have to take in consideration that every Operator runs different and also the Press(es) the Die's can be ran at.
I also don't want to hand our Operators another piece of paper for them to record the info. Papers can be lost easily, something could be forgotten to be recorded etc.
So my solution to this is, that I can record the Die #, date and amount of parts ran at First Piece Inspection ( I have all the above Info on the Shop order ) and just enter it on a Spreadsheet there.
When the Die does have to go to the Tool room, currently the Press Operators affix a Die repair tag to it, circle what needs to be done, what Press it came from and date. I can match the info to that and then add the parts total and eventually get some more current results to when to do Preventive maintenance.
My question is, does this sound simple enough, or am I'm making more work for myself? I mean with the log I had started, it just got bigger and bigger, but I couldn't really get no good results, and I don't want that to happen again. Any advise would be appreciated.
P.S Sorry this is so long.
|
Can someone with this type of expertise help?
Thank you very much.
Stijloor.
|

19th August 2010, 04:28 AM
|
|
Shy Poster (1 to 5 Posts)
Registration Date: Aug 2010
Location: Pakistan
|
|
Posts: 3
Thanks Given to Others: 0
Thanked 0 Times in 0 Posts
Karma Power: 12 Karma: 10 
|
|
|
Re: Preventive Tool Maintenance - Preventive and Predictive Maintenance requirements
Hello there. I am sorry don't know answer to your that long question :-) but the purpose of writing here is that, I am also looking for some "paper-based" preventive and other types of Equipment Maintenance Formats. If someone could held it would be highly appreciated.
Thanking you in anticipation.
Cheers.
|

19th August 2010, 07:32 AM
|
|
Super Moderator
Registration Date: Sep 2005
Location: Johore/Malaysia
|
|
Posts: 5,943
Thanks Given to Others: 1,402
Thanked 2,745 Times in 1,907 Posts
Karma Power: 661
|
|
|
Re: Preventive Tool Maintenance - Preventive and Predictive Maintenance requirements
Quote:
In Reply to Parent Post by fsheikh99
Hello there. I am sorry don't know answer to your that long question :-) but the purpose of writing here is that, I am also looking for some "paper-based" preventive and other types of Equipment Maintenance Formats. If someone could held it would be highly appreciated.
Thanking you in anticipation.
Cheers.
|
See: Searching the Forum - How do I search only for files attached to posts?
Use 'preventive' or 'maintenance' as keywords for the search.
|

2nd September 2010, 01:39 PM
|
|
Getting Involved (6 to 9 Posts)
Registration Date: Aug 2010
Location: United States
|
|
Posts: 7
Thanks Given to Others: 0
Thanked 5 Times in 4 Posts
Karma Power: 12 Karma: 35 
|
|
|
Re: Preventive Tool Maintenance - Preventive and Predictive Maintenance requirements
I just joined the board and my background is in equipment maintenance. Here’s my opinion:
Most regulations refer to preventive maintenance requirements, understanding there is a difference between preventive (scheduled tasks based on time, # of cycles, etc.) and unscheduled maintenance (break-fix, EQ failure, etc.). Findings are almost always phrased in the terms of “preventive maintenance.” As you described your process, you cannot determine a time or cycle based schedule for die maintenance. In general terms, this pushes these events to “unscheduled”.
Logging the number of the die with the shop order is a good idea, but it doesn’t address the finding. Based on your post, you’re missing two things; a maintenance procedure for your dies, and evidence the maintenance was carried out.
For the procedure, I recommend creating a document which states you’ll run a die until it needs to be repaired (run to failure). Seems in your process, normal inspection would catch a die-induced defect in the finished product. At that time, the die is replaced, the repair tag created, and it’s sent to the tool room.
For the evidence, you could use a paper-based repair form, keeping it simple. Suggested data includes work order number (could use sequentially numbered forms, etc.), date work was completed, die ID, comments, and signature of individual performing the maintenance. I recommend retaining these documents by die ID for easy finding later.
Ryan
|

2nd September 2010, 02:20 PM
|
 |
Involved in Discussions
Registration Date: Feb 2002
Location: Belgium
|
|
Posts: 502
Thanks Given to Others: 290
Thanked 175 Times in 116 Posts
Karma Power: 100
|
|
|
Re: Preventive Tool Maintenance - Preventive and Predictive Maintenance requirements
Hi,
We have never used a fixed number of parts before the tooling was sent to repair.
Instead the tooling was checked before each order (first piece) and after each order run.
When it was still OK after the order it was tagged OK (with indication of cumulative number of parts produced) and was sent to storage.
When it was not OK it was tagged accordingly including the repair wanted.
This has worked well for years on end and has been accepted by different auditors.
Best regards,
Antoine
|

16th November 2011, 12:00 PM
|
|
Email Address Invalid or Rejected by Recipient System
Registration Date: Aug 2011
|
|
Posts: 8
Thanks Given to Others: 3
Thanked 0 Times in 0 Posts
Karma Power: 0 Karma: 10 
|
|
|
Re: Preventive Tool Maintenance - Preventive and Predictive Maintenance requirements
I can assume that you inspect dies on a regular basis.
I would fully document what is called for in a die inspection, and how often one is held. This is your PM.
This should be a formal document with a document number that is referenced by the PM tracking system which can be as simple as an Excel spreadsheet. (which should contain a formal document number as well (and called out on the PM).
After this, you should not receive any NC for the program. You have to follow what you document though.....
|

16th November 2011, 12:52 PM
|
 |
Involved in Discussions
Registration Date: Jan 2007
Location: Michigan USA
|
|
Posts: 95
Thanks Given to Others: 20
Thanked 19 Times in 18 Posts
Karma Power: 35 Karma: 143  
|
|
|
Re: Preventive Tool Maintenance - Preventive and Predictive Maintenance requirements
Thank you all for your kind replies. It surprised me that this subject came back up in the Forum list.
Here is a update on what I implemented:
I started to record the tooling number, amount ran and date in a excel spreadsheet. Once the Operator brings the tool in to be fixed, I get the repair tag and record the date it was done and then add all the several runs together to get a part total. Excel is wonderful to me.. 
I set it up that it will add the totals and average it out for me, so when I enter another job setup and can take a glance at were we at and give the operator the heads up that it needs to go in for repairs or if we are still good.
Some tooling takes a bit longer to collect data, because they are not run very often, but others are used weekly.
Our new auditor that did our Re-certification this year, audited it and he was happy that I could show him that we are doing it with the corresponding dates and averages.
Again Thank you for all your replies.
|
Lower Navigation Bar
|
|
|
Do you find this discussion thread helpful and informational?
|
Visitors Currently Viewing this Thread: 1 (0 Registered Visitors (Members) and 1 Unregistered Guest Visitors)
|
|
|
| Thread Tools |
Search this Thread |
|
|
|
| Display Modes |
Rate Thread Content |
Hybrid Mode
|
|
Forum Posting Settings
|
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts
HTML code is Off
|
|
|
|
|