The Elsmar Cove Wiki More Free Files The Elsmar Cove Forums Discussion Thread Index Post Attachments Listing Failure Modes Services and Solutions to Problems Elsmar cove Forums Main Page Elsmar Cove Home Page

Go Back   The Elsmar Cove Forum > Manufacturing, Service, and Business Systems Processes > Manufacturing and Related Processes
Forum Username


Elsmar Cove Forum Sidebar
Custom Search
Monitor the Elsmar Forum
Monitor New Forum Posts
Follow Marc & Elsmar
Elsmar Cove Forum RSS Feed  Marc Smith's Google+ Page  Marc Smith's Linked In Page   Marc Smith's Elsmar Cove YouTube Page  Marc Smith's Facebook Page
Elsmar Cove Groups
Elsmar Cove Google+ Group  Elsmar Cove LinkedIn Group  Elsmar Cove Facebook Group
Sponsor Links







Donate and $ Contributor Forum Access
Sponsored Links
Courtesy Quick Links

Links that Elsmar Cove visitors will find useful in your quest for knowledge:


Howard's
International Quality Services

Atul's
Symphony Technologies

Marcelo Antunes'
SQR Consulting

Bob Doering's
Correct SPC - Precision Machining


NIST's Engineering Statistics Handbook

IRCA - International Register of Certified Auditors

SAE - Society of Automotive Engineers

Quality Digest Portal

IEST - Institute of Environmental Sciences and Technology

ASQ - American Society for Quality


Related Topic Tags
audits and auditing, maintenance, predictive maintenance, preventive maintenance, audit nonconformances and findings
Reply
 
Thread Tools Search this Thread Rate Thread Content Display Modes
  #1  
Old 18th August 2010, 10:14 AM
try2makeit's Avatar
try2makeit try2makeit is offline
Involved in Discussions

 
Registration Date: Jan 2007
Location: Michigan USA
 
Posts: 95
Thanks Given to Others: 20
Thanked 19 Times in 18 Posts
Karma Power: 35
Karma: 143
try2makeit is appreciated, and has over 100 Karma points.try2makeit is appreciated, and has over 100 Karma points.
Please Help! Preventive Tool Maintenance - Preventive and Predictive Maintenance requirements

Hi everyone,

during our recent surveillance audit I received a minor non-conformance against Preventive and Predictive Maintenance requirement.

The write up is at follows:

The organization does not always ensure evidence of all Preventive and Predictive Maintenance requirements. Evidence of Predictive Maintenance where not able to be verified at time of Audit. (Tool Repair tracking sheet not up to date).

Few years back I started to keep track of our steel rule Die's that we maintenance ourselves, i.e Punches changed, rule changed, etc. But then with the slow down and down sizing in our Company, and people wearing more hats, I neglected to enter information into the log, therefor the write-up.

Now I want to make the log more simple, instead of this massive spreadsheet with this abundance of information as too Punch change, rule change, soldering etc, and just focus on how many parts are being produced of the Die before it is brought to the Tool room for repairs.

Our Tool guy says in general you can run approx.4500 parts of a die, before it needs any maintenance. Okay sounds good, but I don't want to answer the NC by giving a specific number and say that the tool needs to go to the tool room and be fixed. Because if the tool runs good, and parts are good, beyond the 4500 part mark, I am not going to a) have the Operator stop and tear her setup down, and b) my experience with a set number, if we are not right on the money and my CB comes in and audits and let's say we ran 4510 parts of the Die, it will result in a NC.

Then I have to take in consideration that every Operator runs different and also the Press(es) the Die's can be ran at.
I also don't want to hand our Operators another piece of paper for them to record the info. Papers can be lost easily, something could be forgotten to be recorded etc.

So my solution to this is, that I can record the Die #, date and amount of parts ran at First Piece Inspection ( I have all the above Info on the Shop order ) and just enter it on a Spreadsheet there.
When the Die does have to go to the Tool room, currently the Press Operators affix a Die repair tag to it, circle what needs to be done, what Press it came from and date. I can match the info to that and then add the parts total and eventually get some more current results to when to do Preventive maintenance.

My question is, does this sound simple enough, or am I'm making more work for myself? I mean with the log I had started, it just got bigger and bigger, but I couldn't really get no good results, and I don't want that to happen again. Any advise would be appreciated.

P.S Sorry this is so long.
  #2  
Old 19th August 2010, 03:30 AM
Stijloor's Avatar
Stijloor Stijloor is offline
Cross Forum Moderator

 
Registration Date: May 2003
Location: Charlotte, North Carolina.
Age: 65
 
Posts: 13,405
Thanks Given to Others: 2,940
Thanked 4,268 Times in 3,025 Posts
Karma Power: 1428
Karma: 23887
Stijloor is appreciated, and has over 1700 Karma points.Stijloor is appreciated, and has over 1700 Karma points.Stijloor is appreciated, and has over 1700 Karma points.
Stijloor is appreciated, and has over 1700 Karma points.Stijloor is appreciated, and has over 1700 Karma points.Stijloor is appreciated, and has over 1700 Karma points.Stijloor is appreciated, and has over 1700 Karma points.Stijloor is appreciated, and has over 1700 Karma points.Stijloor is appreciated, and has over 1700 Karma points.Stijloor is appreciated, and has over 1700 Karma points.Stijloor is appreciated, and has over 1700 Karma points.Stijloor is appreciated, and has over 1700 Karma points.Stijloor is appreciated, and has over 1700 Karma points.Stijloor is appreciated, and has over 1700 Karma points.Stijloor is appreciated, and has over 1700 Karma points.Stijloor is appreciated, and has over 1700 Karma points.Stijloor is appreciated, and has over 1700 Karma points.Stijloor is appreciated, and has over 1700 Karma points.
Re: Preventive Tool Maintenance - Preventive and Predictive Maintenance requirements

Quote:
In Reply to Parent Post by try2makeit View Post

Hi everyone,

during our recent surveillance audit I received a minor non-conformance against Preventive and Predictive Maintenance requirement.

The write up is at follows:

The organization does not always ensure evidence of all Preventive and Predictive Maintenance requirements. Evidence of Predictive Maintenance where not able to be verified at time of Audit. (Tool Repair tracking sheet not up to date).

Few years back I started to keep track of our steel rule Die's that we maintenance ourselves, i.e Punches changed, rule changed, etc. But then with the slow down and down sizing in our Company, and people wearing more hats, I neglected to enter information into the log, therefor the write-up.

Now I want to make the log more simple, instead of this massive spreadsheet with this abundance of information as too Punch change, rule change, soldering etc, and just focus on how many parts are being produced of the Die before it is brought to the Tool room for repairs.

Our Tool guy says in general you can run approx.4500 parts of a die, before it needs any maintenance. Okay sounds good, but I don't want to answer the NC by giving a specific number and say that the tool needs to go to the tool room and be fixed. Because if the tool runs good, and parts are good, beyond the 4500 part mark, I am not going to a) have the Operator stop and tear her setup down, and b) my experience with a set number, if we are not right on the money and my CB comes in and audits and let's say we ran 4510 parts of the Die, it will result in a NC.

Then I have to take in consideration that every Operator runs different and also the Press(es) the Die's can be ran at.
I also don't want to hand our Operators another piece of paper for them to record the info. Papers can be lost easily, something could be forgotten to be recorded etc.

So my solution to this is, that I can record the Die #, date and amount of parts ran at First Piece Inspection ( I have all the above Info on the Shop order ) and just enter it on a Spreadsheet there.
When the Die does have to go to the Tool room, currently the Press Operators affix a Die repair tag to it, circle what needs to be done, what Press it came from and date. I can match the info to that and then add the parts total and eventually get some more current results to when to do Preventive maintenance.

My question is, does this sound simple enough, or am I'm making more work for myself? I mean with the log I had started, it just got bigger and bigger, but I couldn't really get no good results, and I don't want that to happen again. Any advise would be appreciated.

P.S Sorry this is so long.

Can someone with this type of expertise help?

Thank you very much.

Stijloor.
Sponsored Links

  #3  
Old 19th August 2010, 04:28 AM
fsheikh99 fsheikh99 is offline
Shy Poster (1 to 5 Posts)

 
Registration Date: Aug 2010
Location: Pakistan
 
Posts: 3
Thanks Given to Others: 0
Thanked 0 Times in 0 Posts
Karma Power: 12
Karma: 10
fsheikh99 has less than 100 Karma points so far.
Re: Preventive Tool Maintenance - Preventive and Predictive Maintenance requirements

Hello there. I am sorry don't know answer to your that long question :-) but the purpose of writing here is that, I am also looking for some "paper-based" preventive and other types of Equipment Maintenance Formats. If someone could held it would be highly appreciated.

Thanking you in anticipation.

Cheers.
  #4  
Old 19th August 2010, 07:32 AM
harry harry is offline
Super Moderator

 
Registration Date: Sep 2005
Location: Johore/Malaysia
 
Posts: 5,943
Thanks Given to Others: 1,402
Thanked 2,745 Times in 1,907 Posts
Blog Entries: 2
Karma Power: 661
Karma: 17665
harry is appreciated, and has over 1700 Karma points.
harry is appreciated, and has over 1700 Karma points.harry is appreciated, and has over 1700 Karma points.harry is appreciated, and has over 1700 Karma points.harry is appreciated, and has over 1700 Karma points.harry is appreciated, and has over 1700 Karma points.harry is appreciated, and has over 1700 Karma points.harry is appreciated, and has over 1700 Karma points.harry is appreciated, and has over 1700 Karma points.harry is appreciated, and has over 1700 Karma points.harry is appreciated, and has over 1700 Karma points.harry is appreciated, and has over 1700 Karma points.harry is appreciated, and has over 1700 Karma points.harry is appreciated, and has over 1700 Karma points.harry is appreciated, and has over 1700 Karma points.
Re: Preventive Tool Maintenance - Preventive and Predictive Maintenance requirements

Quote:
In Reply to Parent Post by fsheikh99 View Post

Hello there. I am sorry don't know answer to your that long question :-) but the purpose of writing here is that, I am also looking for some "paper-based" preventive and other types of Equipment Maintenance Formats. If someone could held it would be highly appreciated.

Thanking you in anticipation.

Cheers.
See: Searching the Forum - How do I search only for files attached to posts?

Use 'preventive' or 'maintenance' as keywords for the search.
  #5  
Old 2nd September 2010, 01:39 PM
Big-R Big-R is offline
Getting Involved (6 to 9 Posts)

 
Registration Date: Aug 2010
Location: United States
 
Posts: 7
Thanks Given to Others: 0
Thanked 5 Times in 4 Posts
Karma Power: 12
Karma: 35
Big-R has less than 100 Karma points so far.
Re: Preventive Tool Maintenance - Preventive and Predictive Maintenance requirements

I just joined the board and my background is in equipment maintenance. Here’s my opinion:

Most regulations refer to preventive maintenance requirements, understanding there is a difference between preventive (scheduled tasks based on time, # of cycles, etc.) and unscheduled maintenance (break-fix, EQ failure, etc.). Findings are almost always phrased in the terms of “preventive maintenance.” As you described your process, you cannot determine a time or cycle based schedule for die maintenance. In general terms, this pushes these events to “unscheduled”.

Logging the number of the die with the shop order is a good idea, but it doesn’t address the finding. Based on your post, you’re missing two things; a maintenance procedure for your dies, and evidence the maintenance was carried out.

For the procedure, I recommend creating a document which states you’ll run a die until it needs to be repaired (run to failure). Seems in your process, normal inspection would catch a die-induced defect in the finished product. At that time, the die is replaced, the repair tag created, and it’s sent to the tool room.

For the evidence, you could use a paper-based repair form, keeping it simple. Suggested data includes work order number (could use sequentially numbered forms, etc.), date work was completed, die ID, comments, and signature of individual performing the maintenance. I recommend retaining these documents by die ID for easy finding later.

Ryan
  #6  
Old 2nd September 2010, 02:20 PM
antoine.dias's Avatar
antoine.dias antoine.dias is offline
Involved in Discussions

 
Registration Date: Feb 2002
Location: Belgium
 
Posts: 502
Thanks Given to Others: 290
Thanked 175 Times in 116 Posts
Karma Power: 100
Karma: 2203
antoine.dias is appreciated, and has over 1700 Karma points.antoine.dias is appreciated, and has over 1700 Karma points.antoine.dias is appreciated, and has over 1700 Karma points.antoine.dias is appreciated, and has over 1700 Karma points.antoine.dias is appreciated, and has over 1700 Karma points.antoine.dias is appreciated, and has over 1700 Karma points.antoine.dias is appreciated, and has over 1700 Karma points.antoine.dias is appreciated, and has over 1700 Karma points.antoine.dias is appreciated, and has over 1700 Karma points.antoine.dias is appreciated, and has over 1700 Karma points.antoine.dias is appreciated, and has over 1700 Karma points.antoine.dias is appreciated, and has over 1700 Karma points.antoine.dias is appreciated, and has over 1700 Karma points.
Send a message via Skype™ to antoine.dias
Re: Preventive Tool Maintenance - Preventive and Predictive Maintenance requirements

Hi,

We have never used a fixed number of parts before the tooling was sent to repair.
Instead the tooling was checked before each order (first piece) and after each order run.
When it was still OK after the order it was tagged OK (with indication of cumulative number of parts produced) and was sent to storage.
When it was not OK it was tagged accordingly including the repair wanted.

This has worked well for years on end and has been accepted by different auditors.

Best regards,

Antoine
  #7  
Old 16th November 2011, 12:00 PM
Rick Fox Rick Fox is offline
Email Address Invalid or Rejected by Recipient System

 
Registration Date: Aug 2011
 
Posts: 8
Thanks Given to Others: 3
Thanked 0 Times in 0 Posts
Karma Power: 0
Karma: 10
Rick Fox has less than 100 Karma points so far.
Re: Preventive Tool Maintenance - Preventive and Predictive Maintenance requirements

I can assume that you inspect dies on a regular basis.
I would fully document what is called for in a die inspection, and how often one is held. This is your PM.

This should be a formal document with a document number that is referenced by the PM tracking system which can be as simple as an Excel spreadsheet. (which should contain a formal document number as well (and called out on the PM).

After this, you should not receive any NC for the program. You have to follow what you document though.....
  #8  
Old 16th November 2011, 12:52 PM
try2makeit's Avatar
try2makeit try2makeit is offline
Involved in Discussions

 
Registration Date: Jan 2007
Location: Michigan USA
 
Posts: 95
Thanks Given to Others: 20
Thanked 19 Times in 18 Posts
Karma Power: 35
Karma: 143
try2makeit is appreciated, and has over 100 Karma points.try2makeit is appreciated, and has over 100 Karma points.
Re: Preventive Tool Maintenance - Preventive and Predictive Maintenance requirements

Thank you all for your kind replies. It surprised me that this subject came back up in the Forum list.

Here is a update on what I implemented:

I started to record the tooling number, amount ran and date in a excel spreadsheet. Once the Operator brings the tool in to be fixed, I get the repair tag and record the date it was done and then add all the several runs together to get a part total. Excel is wonderful to me..
I set it up that it will add the totals and average it out for me, so when I enter another job setup and can take a glance at were we at and give the operator the heads up that it needs to go in for repairs or if we are still good.
Some tooling takes a bit longer to collect data, because they are not run very often, but others are used weekly.
Our new auditor that did our Re-certification this year, audited it and he was happy that I could show him that we are doing it with the corresponding dates and averages.

Again Thank you for all your replies.
Reply

Lower Navigation Bar
Go Back   The Elsmar Cove Forum > Manufacturing, Service, and Business Systems Processes > Manufacturing and Related Processes

Do you find this discussion thread helpful and informational?


Bookmarks


Visitors Currently Viewing this Thread: 1 (0 Registered Visitors (Members) and 1 Unregistered Guest Visitors)
 
Thread Tools Search this Thread
Search this Thread:

Advanced Forum Search
Display Modes Rate Thread Content
Rate Thread Content:

Forum Posting Settings
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off


Similar Discussion Threads
Discussion Thread Title Thread Starter Forum Replies Last Post or Poll Vote
Predictive Maintenance vs Preventive Maintenance - Definitions Michiel Definitions, Acronyms, Abbreviations and Interpretations 3 13th February 2007 10:04 AM
Preventive Maintenance vs. Predictive Maintenance - Distinction between darkafar Definitions, Acronyms, Abbreviations and Interpretations 20 22nd November 2006 12:21 PM
Preventive vs. Predictive Maintenance - What is the difference? TS 16949 - 7.5.1.4. Rosana Definitions, Acronyms, Abbreviations and Interpretations 11 18th November 2006 03:28 PM
Preventive and Predictive Maintenance - Benchmarking Partner frank-h Benchmarking - Methods and General Discussions 6 1st August 2002 08:06 AM
QS-9000 Clause 4.9.g.1 - Preventive Maintenance - Tool Wear Predictive Maintenance Frank45 QS-9000 - American Automotive Manufacturers Standard 1 23rd September 1999 11:00 AM



The time now is 09:51 AM. All times are GMT -4.
Your time zone can be changed in your UserCP --> Options.


   


Marc Timothy Smith - Elsmar.com
8466 LeSourdsville-West Chester Road, West Chester, Ohio 45069-1929
513 341-6272