The Elsmar Cove Wiki More Free Files The Elsmar Cove Forums Discussion Thread Index Post Attachments Listing Failure Modes Services and Solutions to Problems Elsmar cove Forums Main Page Elsmar Cove Home Page

Go Back   The Elsmar Cove Forum > Common Quality Assurance Processes and Tools > Documentation Control Systems, Procedures, Forms and Templates
Forum Username


Elsmar Cove Forum Sidebar
Custom Search
Monitor the Elsmar Forum
Monitor New Forum Posts
Follow Marc & Elsmar
Elsmar Cove Forum RSS Feed  Marc Smith's Google+ Page  Marc Smith's Linked In Page   Marc Smith's Elsmar Cove YouTube Page  Marc Smith's Facebook Page
Elsmar Cove Groups
Elsmar Cove Google+ Group  Elsmar Cove LinkedIn Group  Elsmar Cove Facebook Group
Sponsor Links







Donate and $ Contributor Forum Access
Sponsored Links
Courtesy Quick Links

Links that Elsmar Cove visitors will find useful in your quest for knowledge:


Howard's
International Quality Services

Atul's
Symphony Technologies

Marcelo Antunes'
SQR Consulting

Bob Doering's
Correct SPC - Precision Machining


NIST's Engineering Statistics Handbook

IRCA - International Register of Certified Auditors

SAE - Society of Automotive Engineers

Quality Digest Portal

IEST - Institute of Environmental Sciences and Technology

ASQ - American Society for Quality


Related Topic Tags
engineering changes, documents and documentation (general)
Reply
 
Thread Tools Search this Thread Rating: Thread Rating: 3 votes, 4.67 average. Display Modes
  #1  
Old 7th May 2008, 01:56 PM
Marquee05 Marquee05 is offline
Shy Poster (1 to 5 Posts)

 
Registration Date: Mar 2007
Location: Irvine, CA
 
Posts: 3
Thanks Given to Others: 0
Thanked 0 Times in 0 Posts
Karma Power: 26
Karma: 10
Marquee05 has less than 100 Karma points so far.
Question Engineering Change Request/Order (ECR/ECO) or Document Change Request/Order (DCR/DCO)

I work for a mid-sized medical device manufacturer and am the sole documentation specialist for the organization. We have a difference of opinion on whether our change control documents should be called Engineering Change Request/Order (ECR/ECO) or Document Change Request/Order (DCR/DCO).

The rationale for ECO is that it seems to be the familiar term used by larger medical device companies while the DCO would be more appropriate for changes made outside the engineering area, such as Marketing, Finance, etc. which have nothing to do with Engineering.

Is one more appropriate than the other for a Medical Device Manufacturer? We are currently using ECO and all our documentation references that.

Thank you.

Sponsored Links
  #2  
Old 7th May 2008, 02:03 PM
AndyN's Avatar
AndyN AndyN is offline
Forum Moderator

 
Registration Date: Feb 2005
Location: Michigan, USA
 
Posts: 7,013
Thanks Given to Others: 4,007
Thanked 2,862 Times in 1,960 Posts
Karma Power: 774
Karma: 19646
AndyN is appreciated, and has over 1700 Karma points.AndyN is appreciated, and has over 1700 Karma points.
AndyN is appreciated, and has over 1700 Karma points.AndyN is appreciated, and has over 1700 Karma points.AndyN is appreciated, and has over 1700 Karma points.AndyN is appreciated, and has over 1700 Karma points.AndyN is appreciated, and has over 1700 Karma points.AndyN is appreciated, and has over 1700 Karma points.AndyN is appreciated, and has over 1700 Karma points.AndyN is appreciated, and has over 1700 Karma points.AndyN is appreciated, and has over 1700 Karma points.AndyN is appreciated, and has over 1700 Karma points.AndyN is appreciated, and has over 1700 Karma points.
Send a message via Skype™ to AndyN
Let Me Help You Re: ECR or DCR?

I tend to favor the idea of keeping two systems. The ECO is appropriate for product - the changes are often the result of a more rigorous process controls.

A DCR (or similar) is good, IMHO, for the 'lesser' documentation you mentioned, including QMS documents. I'd recommend you use both processes.
__________________
'Cause you know sometimes words have two meanings.....
Sponsored Links

  #3  
Old 7th May 2008, 03:01 PM
Frank T.'s Avatar
Frank T. Frank T. is offline
Involved in Discussions

 
Registration Date: Jun 2006
Location: Illinois
Age: 37
 
Posts: 235
Thanks Given to Others: 60
Thanked 194 Times in 92 Posts
Karma Power: 54
Karma: 1297
Frank T. is appreciated, and has over 1100 Karma points.Frank T. is appreciated, and has over 1100 Karma points.Frank T. is appreciated, and has over 1100 Karma points.Frank T. is appreciated, and has over 1100 Karma points.Frank T. is appreciated, and has over 1100 Karma points.Frank T. is appreciated, and has over 1100 Karma points.Frank T. is appreciated, and has over 1100 Karma points.Frank T. is appreciated, and has over 1100 Karma points.Frank T. is appreciated, and has over 1100 Karma points.
Re: ECR or DCR?

Would it not be easier to call it a change request/order and have some sort of check box that differentiates the two.

Although I am not familiar with Medical Device manufacturing, my philosophy is to K.I.S.
__________________
"I am like any other man. All I do is supply a demand." -Al Capone

Last edited by Frank T.; 7th May 2008 at 03:03 PM. Reason: spelling
  #4  
Old 7th May 2008, 03:37 PM
ScottK's Avatar
ScottK ScottK is online now
Not out of the crisis

 
Registration Date: Apr 2006
Location: Butler, NJ
 
Posts: 2,451
Thanks Given to Others: 170
Thanked 632 Times in 458 Posts
Karma Power: 284
Karma: 5184
ScottK is appreciated, and has over 1700 Karma points.
ScottK is appreciated, and has over 1700 Karma points.ScottK is appreciated, and has over 1700 Karma points.ScottK is appreciated, and has over 1700 Karma points.ScottK is appreciated, and has over 1700 Karma points.ScottK is appreciated, and has over 1700 Karma points.ScottK is appreciated, and has over 1700 Karma points.ScottK is appreciated, and has over 1700 Karma points.ScottK is appreciated, and has over 1700 Karma points.ScottK is appreciated, and has over 1700 Karma points.ScottK is appreciated, and has over 1700 Karma points.ScottK is appreciated, and has over 1700 Karma points.ScottK is appreciated, and has over 1700 Karma points.ScottK is appreciated, and has over 1700 Karma points.
Re: Engineering Change Request/Order (ECR/ECO) or Document Change Request/Order (DCR/

I also keep two systems but defined them differently than Andy...

ECO's are for engineering drawings. The CAD designer is the owner of the system.
DCR's are for everything else - procedures, external documents, forms, specifications, etc. DC Manager is the owner of that system.

When I came on board the ECO process was set up and functioning well, so I decided to leave it be and built the DCR system.

We are entertaining thoughts of consolidating them in the next year as drawings are really just another document.
__________________
Time for a new sig line.
My LinkedIn Profile
Thanks to ScottK for your informative Post and/or Attachment!
  #5  
Old 7th May 2008, 09:57 PM
Kevin Mader's Avatar
Kevin Mader Kevin Mader is online now
One of THE Original Covers!

 
Registration Date: Nov 1998
Location: Wallingford, CT USA
Age: 46
 
Posts: 1,211
Thanks Given to Others: 32
Thanked 119 Times in 78 Posts
Karma Power: 400
Karma: 1615
Kevin Mader is appreciated, and has over 1500 Karma points.Kevin Mader is appreciated, and has over 1500 Karma points.Kevin Mader is appreciated, and has over 1500 Karma points.Kevin Mader is appreciated, and has over 1500 Karma points.Kevin Mader is appreciated, and has over 1500 Karma points.Kevin Mader is appreciated, and has over 1500 Karma points.Kevin Mader is appreciated, and has over 1500 Karma points.Kevin Mader is appreciated, and has over 1500 Karma points.Kevin Mader is appreciated, and has over 1500 Karma points.Kevin Mader is appreciated, and has over 1500 Karma points.Kevin Mader is appreciated, and has over 1500 Karma points.
Send a message via AIM to Kevin Mader
Re: Engineering Change Request/Order (ECR/ECO) or Document Change Request/Order (DCR/

I’m with Andy on this one, but I’ve seen this done both ways. It might be helpful to think about this topic in these contexts:

1. Engineering changes are more closely associated with design changes that include design and product level documentation. These documents support design requirements and specifications as part of Design Control. While they might be physically represented on paper spec sheets and drawings, they are product oriented and technical in nature.

2. Documentation changes are more closely associated with changes to documentation used to establish the QMS procedures. Less technical in nature and not product oriented. For instance, you do not need an independent reviewer to establish a change to a procedure where as you need one to make a design change/release.

This said - there is plenty of mud! A good example might be a design verification protocol. While the creation of a protocol will definitely tie into product documentation (e.g. design requirements specification), the document itself is created to support a QMS requirement. Many folks process a review of the protocol under the Document Control hat rather than the Design Control hat.

When folks have difficulty in determining which to process to use for a given change, they tend to perform the more rigorous review which is generally the design review using an independent reviewer. This might be viewed as overkill, but a safe (safer?) way out when reviewing a change. Keep in mind that while both processes are similar, there are enough differences in the contexts of what is reviewed and how changes are reviewed that, in my opinion, warrant keeping the control processes distinct.

Good question by the way.

Regards,

Kevin
__________________
"Without theory there is nothing to modify or learn." W. Edwards Deming
Thank You to Kevin Mader for your informative Post and/or Attachment!
  #6  
Old 8th May 2008, 01:30 AM
joshua_sx1's Avatar
joshua_sx1 joshua_sx1 is offline
Involved in Discussions

 
Registration Date: Apr 2008
 
Posts: 325
Thanks Given to Others: 19
Thanked 59 Times in 51 Posts
Karma Power: 53
Karma: 274
joshua_sx1 is appreciated, and has over 200 Karma points.joshua_sx1 is appreciated, and has over 200 Karma points.joshua_sx1 is appreciated, and has over 200 Karma points.
Re: Engineering Change Request/Order (ECR/ECO) or Document Change Request/Order (DCR/

For me, you can use either of two… and to make them more effective in your organization, you have to define their terminologies in your manual and/or procedures – meaning, document their meaning…

…so everybody involved shall have the same interpretation when dealing with your manual and/or procedures…
__________________
"Anything you cannot measure, you cannot control"
Thanks to joshua_sx1 for your informative Post and/or Attachment!
  #7  
Old 8th May 2008, 08:58 AM
Helmut Jilling Helmut Jilling is offline
Auditor / Consultant

 
Registration Date: Aug 2005
Location: Charlotte, NC and Akron, OH
Age: 58
 
Posts: 4,030
Thanks Given to Others: 488
Thanked 1,020 Times in 695 Posts
Karma Power: 451
Karma: 8112
Helmut Jilling is appreciated, and has over 1700 Karma points.Helmut Jilling is appreciated, and has over 1700 Karma points.
Helmut Jilling is appreciated, and has over 1700 Karma points.Helmut Jilling is appreciated, and has over 1700 Karma points.Helmut Jilling is appreciated, and has over 1700 Karma points.Helmut Jilling is appreciated, and has over 1700 Karma points.Helmut Jilling is appreciated, and has over 1700 Karma points.Helmut Jilling is appreciated, and has over 1700 Karma points.Helmut Jilling is appreciated, and has over 1700 Karma points.Helmut Jilling is appreciated, and has over 1700 Karma points.Helmut Jilling is appreciated, and has over 1700 Karma points.Helmut Jilling is appreciated, and has over 1700 Karma points.Helmut Jilling is appreciated, and has over 1700 Karma points.Helmut Jilling is appreciated, and has over 1700 Karma points.Helmut Jilling is appreciated, and has over 1700 Karma points.
Re: ECR or DCR?

Quote:
In Reply to Parent Post by AndyN View Post

I tend to favor the idea of keeping two systems. The ECO is appropriate for product - the changes are often the result of a more rigorous process controls.

A DCR (or similar) is good, IMHO, for the 'lesser' documentation you mentioned, including QMS documents. I'd recommend you use both processes.
I agree with bot Andy and Kevin. I would only point out a way to simplify the thinking.

All of them are doc changes. However, Engineering change requests are a subset, and frequently go much deeper, can impact product design, tooling, customer approval requirements, PPAPs, ...many more links and ripples.

So, most organizations have developed a specialized process for doc changes related to Engineering. The others can be done more simply.
__________________
Relentlessly Pursue Excellence!
Thank You to Helmut Jilling for your informative Post and/or Attachment!
  #8  
Old 8th May 2008, 09:42 PM
Kevin Mader's Avatar
Kevin Mader Kevin Mader is online now
One of THE Original Covers!

 
Registration Date: Nov 1998
Location: Wallingford, CT USA
Age: 46
 
Posts: 1,211
Thanks Given to Others: 32
Thanked 119 Times in 78 Posts
Karma Power: 400
Karma: 1615
Kevin Mader is appreciated, and has over 1500 Karma points.Kevin Mader is appreciated, and has over 1500 Karma points.Kevin Mader is appreciated, and has over 1500 Karma points.Kevin Mader is appreciated, and has over 1500 Karma points.Kevin Mader is appreciated, and has over 1500 Karma points.Kevin Mader is appreciated, and has over 1500 Karma points.Kevin Mader is appreciated, and has over 1500 Karma points.Kevin Mader is appreciated, and has over 1500 Karma points.Kevin Mader is appreciated, and has over 1500 Karma points.Kevin Mader is appreciated, and has over 1500 Karma points.Kevin Mader is appreciated, and has over 1500 Karma points.
Send a message via AIM to Kevin Mader
Re: Engineering Change Request/Order (ECR/ECO) or Document Change Request/Order (DCR/

Joshua – Yes. Operational definitions are important and key to improving communication within the organization and when communicating to outsiders (e.g. auditors). I’d say your comment on establishing a common language is good advice in all arenas.

Good point Helmut. I can say that even though we have fairly good operational definitions, folks in Engineering seemingly struggle the most with selecting the right process - design changes (special emphasis) vs. document changes (more general). Also of note, folks tend to migrate towards the simpler path (document control) even when the more robust (and involving the most effort) design change control process is warranted.

To ensure less frequent occurrences, I’ve instructed my team to advise on these matters throughout the design/product development process. We also do frequent DHF and DMR audits to ensure that proper reviews using the proper control processes have been followed upon project completion and throughout our sustaining efforts. We’re not perfect, but we have significantly improved.

Good discussion folks!

Regards,

Kevin
__________________
"Without theory there is nothing to modify or learn." W. Edwards Deming
Reply

Lower Navigation Bar
Go Back   The Elsmar Cove Forum > Common Quality Assurance Processes and Tools > Documentation Control Systems, Procedures, Forms and Templates

Do you find this discussion thread helpful and informational?


Bookmarks


Visitors Currently Viewing this Thread: 1 (0 Registered Visitors (Members) and 1 Unregistered Guest Visitors)
 
Thread Tools Search this Thread
Search this Thread:

Advanced Forum Search
Display Modes Rate Thread Content
Rate Thread Content:

Forum Posting Settings
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off


Similar Discussion Threads
Discussion Thread Title Thread Starter Forum Replies Last Post or Poll Vote
Document Control ECO (Engineering Change Order) or QMS? QAMTY ISO 9000, ISO 9001, and ISO 9004 - Questions and Discussions 14 13th September 2012 03:03 PM
Engineering ECR (Engineering Change Request) and ECN (Eng Change Notice) Procedures wsoconnell Documentation Control Systems, Procedures, Forms and Templates 3 24th June 2010 10:21 PM
From ECR (Engineering Change Request) to ECN (Engineering Change Note) - double work! tomjess Documentation Control Systems, Procedures, Forms and Templates 2 22nd November 2008 08:10 PM
ECO (Engineering Change Order) Revision - Letter change or part number change? kcmomde Manufacturing and Related Processes 13 28th July 2008 05:39 PM
ECN (Engineering Change Notice) / ECO (Engineering Change Order) System Raffy Documentation Control Systems, Procedures, Forms and Templates 1 20th March 2001 03:11 PM



The time now is 08:37 AM. All times are GMT -4.
Your time zone can be changed in your UserCP --> Options.


   


Marc Timothy Smith - Elsmar.com
8466 LeSourdsville-West Chester Road, Olde West Chester, Ohio 45069-1929
513 341-6272