The Elsmar Cove Wiki More Free Files The Elsmar Cove Forums Discussion Thread Index Post Attachments Listing Failure Modes Services and Solutions to Problems Elsmar cove Forums Main Page Elsmar Cove Home Page

Go Back   The Elsmar Cove Forum > Common Quality Assurance Processes and Tools > Documentation Control Systems, Procedures, Forms and Templates
Forum Username


Elsmar Cove Forum Sidebar
Custom Search
Monitor the Elsmar Forum
Monitor New Forum Posts
Follow Marc & Elsmar
Elsmar Cove Forum RSS Feed  Marc Smith's Google+ Page  Marc Smith's Linked In Page   Marc Smith's Elsmar Cove YouTube Page  Marc Smith's Facebook Page
Elsmar Cove Groups
Elsmar Cove Google+ Group  Elsmar Cove LinkedIn Group  Elsmar Cove Facebook Group
Sponsor Links







Donate and $ Contributor Forum Access
Sponsored Links
Courtesy Quick Links

Links that Elsmar Cove visitors will find useful in your quest for knowledge:


Howard's
International Quality Services

Atul's
Symphony Technologies

Marcelo Antunes'
SQR Consulting

Bob Doering's
Correct SPC - Precision Machining


NIST's Engineering Statistics Handbook

IRCA - International Register of Certified Auditors

SAE - Society of Automotive Engineers

Quality Digest Portal

IEST - Institute of Environmental Sciences and Technology

ASQ - American Society for Quality


Related Topic Tags
capa (corrective and preventive action), corrective action (ca), preventive action (pa), procedures (general)
Reply
 
Thread Tools Search this Thread Rate Thread Content Display Modes
  #33  
Old 22nd April 2009, 01:59 PM
Jim Wynne's Avatar
Jim Wynne Jim Wynne is offline
Cross Forum Moderator

 
Registration Date: Jan 2005
Location: Southeast Wisconsin
 
Posts: 13,332
Thanks Given to Others: 1,779
Thanked 5,352 Times in 3,430 Posts
Blog Entries: 2
Karma Power: 1445
Karma: 39204
Jim Wynne is appreciated, and has over 1700 Karma points.Jim Wynne is appreciated, and has over 1700 Karma points.Jim Wynne is appreciated, and has over 1700 Karma points.Jim Wynne is appreciated, and has over 1700 Karma points.Jim Wynne is appreciated, and has over 1700 Karma points.
Jim Wynne is appreciated, and has over 1700 Karma points.Jim Wynne is appreciated, and has over 1700 Karma points.Jim Wynne is appreciated, and has over 1700 Karma points.
Re: Are two separate procedures required for Corrective action and preventive actions

Quote:
In Reply to Parent Post by jrugburn View Post

While both Corrective and Preventive Actions require a team based approach to solving an issue, be it current or one that may develop without assistance, a few points I have not yet read are as follows.

1. Timeframe for completion. Corrective Actions are a short term solution while Preventive Actions can last in excess of six months to complete, due to the extenuating circumstances.

2. Budget. Corrective Actions generally are closed with a minimal amount of capital required for closure. Preventive Actions have a large budget, in excess of several thousand dollars and sometimes require the sign off from upper level management for moving forward.

I am heading up a group effort within our facility to begin the use of CAPA to change the means with which we solve problems in the services and limited products we supply our customers, both internal and external.

Great site here, I am glad I joined up!!!

John
Welcome to the Cove, John

I see that you're associated with the Indiana University Cyclotron Facility, which is interesting in terms of your application of the subject matter here. Let me disabuse you of a few misconceptions. We deal mostly with the definitions of CA and PA that are used in international standards such as ISO 9001. CA is defined as "fixing" a process after some nonconformity has occurred, while PA is "proactive," and is intended to prevent nonconformities. The definitions are a bit ambiguous, because CA includes a prevention component--we're supposed to fix the immediate problem ("correction") and prevent it from happening again.

Thus your idea that CA is short-term and PA is long-term doesn't fit. In fact, CA may take considerably longer to complete than a given instance of PA because there may be a period of elapsed time necessary to verify the effectiveness of the CA.

It will be interesting to hear about your implementation, so I hope you will continue to join in the discussions here.
__________________
We aim to please. You aim too, please.

Sponsored Links
  #34  
Old 22nd April 2009, 02:04 PM
Bob the QE Bob the QE is offline
Involved in Discussions

 
Registration Date: Mar 2008
Location: Wisconsin
 
Posts: 172
Thanks Given to Others: 49
Thanked 34 Times in 24 Posts
Karma Power: 39
Karma: 268
Bob the QE is appreciated, and has over 200 Karma points.Bob the QE is appreciated, and has over 200 Karma points.Bob the QE is appreciated, and has over 200 Karma points.
Re: Are two separate procedures required for Corrective action and preventive actions

Quote:
In Reply to Parent Post by jrugburn View Post

While both Corrective and Preventive Actions require a team based approach to solving an issue, be it current or one that may develop without assistance, a few points I have not yet read are as follows.

1. Timeframe for completion. Corrective Actions are a short term solution while Preventive Actions can last in excess of six months to complete, due to the extenuating circumstances.

2. Budget. Corrective Actions generally are closed with a minimal amount of capital required for closure. Preventive Actions have a large budget, in excess of several thousand dollars and sometimes require the sign off from upper level management for moving forward.

I am heading up a group effort within our facility to begin the use of CAPA to change the means with which we solve problems in the services and limited products we supply our customers, both internal and external.

Great site here, I am glad I joined up!!!

John
Not all CA/PA are necessarily team based approaches. If, I as a process owner I can make the CA without any effect on other parts of the organization I do not a team to do it. I find this approach at time to be cumbersome and waisted time. Like when a customer demands of us to use the 8D form as they understand it to be intended and completed as such to solve simple CA's. This is usually an auto QMS based system asking us (a non-auto based QMS) to complete the CA.

Your organization must feel that these definitions or requirements are needed.
and as such these two requirements identified here are only relevant to your QMS, correct? I am not aware of these being detailed out in AS9100 or ISO9001 as some form of requirement, however, they may be identified somewhere else in other standards that I am not aware of. We do not have such details in our CA/PA processes.

And welcome aboard.
Sponsored Links

  #35  
Old 22nd April 2009, 02:07 PM
jrugburn jrugburn is offline
Inactive Registered Visitor

 
Registration Date: Apr 2009
Location: IUCF, Bloomington,IN
 
Posts: 2
Thanks Given to Others: 3
Thanked 0 Times in 0 Posts
Karma Power: 17
Karma: 10
jrugburn has less than 100 Karma points so far.
Re: Are two separate procedures required for Corrective action and preventive actions

Corrective actions CAN be closed and shown as effective in a shorter timeframe than the closure of a Preventive action, which often times requires a loarge amount of capital and outside sources to aid in the completion of said PA.

At least this is how I have approached it in my limited 20 years of manufacturing under the ISO umbrella.

Example......A corrective action to a vendor who is not supplying the customer heat numbers for incoming raw materials. Issue a CA to said vendor outlining the need for this information and hopefully the CA can be closed in a matter of weeks.

A preventive action for the continued dropping of raw materials into an autoclave. Look into why the parts are dropping. Solutions to eliminate dropping. Select a solution, have a ganrty fabricated and implement equipment....timeline maybe two months.

Hell, either way you slice it, you are solving problems and preventing reoccurances.

John
  #36  
Old 22nd April 2009, 02:13 PM
Jim Wynne's Avatar
Jim Wynne Jim Wynne is offline
Cross Forum Moderator

 
Registration Date: Jan 2005
Location: Southeast Wisconsin
 
Posts: 13,332
Thanks Given to Others: 1,779
Thanked 5,352 Times in 3,430 Posts
Blog Entries: 2
Karma Power: 1445
Karma: 39204
Jim Wynne is appreciated, and has over 1700 Karma points.Jim Wynne is appreciated, and has over 1700 Karma points.Jim Wynne is appreciated, and has over 1700 Karma points.Jim Wynne is appreciated, and has over 1700 Karma points.Jim Wynne is appreciated, and has over 1700 Karma points.
Jim Wynne is appreciated, and has over 1700 Karma points.Jim Wynne is appreciated, and has over 1700 Karma points.Jim Wynne is appreciated, and has over 1700 Karma points.
Re: Are two separate procedures required for Corrective action and preventive actions

Quote:
In Reply to Parent Post by jrugburn View Post

Corrective actions CAN be closed and shown as effective in a shorter timeframe than the closure of a Preventive action, which often times requires a loarge amount of capital and outside sources to aid in the completion of said PA.

At least this is how I have approached it in my limited 20 years of manufacturing under the ISO umbrella.

Example......A corrective action to a vendor who is not supplying the customer heat numbers for incoming raw materials. Issue a CA to said vendor outlining the need for this information and hopefully the CA can be closed in a matter of weeks.

A preventive action for the continued dropping of raw materials into an autoclave. Look into why the parts are dropping. Solutions to eliminate dropping. Select a solution, have a ganrty fabricated and implement equipment....timeline maybe two months.

Hell, either way you slice it, you are solving problems and preventing reoccurances.

John
I mostly agree, but was just pointing out the fact that PA=longer and more expensive as a defining term doesn't always hold true. Also, your example of PA, that of preventing materials from being dropped, is an example of CA, using the ISO definition--you're correcting an existing problem. If, when the process had been designed, some insightful person had anticipated the likelihood of material being dropped and installed the necessary controls, it would be PA.
__________________
We aim to please. You aim too, please.
Thanks to Jim Wynne for your informative Post and/or Attachment!
  #37  
Old 22nd April 2009, 02:41 PM
RJFisher RJFisher is offline
Involved in Discussions

 
Registration Date: Apr 2009
Location: Sacramento, CA
 
Posts: 23
Thanks Given to Others: 19
Thanked 7 Times in 3 Posts
Karma Power: 19
Karma: 116
RJFisher is appreciated, and has over 100 Karma points.RJFisher is appreciated, and has over 100 Karma points.
Send a message via AIM to RJFisher Send a message via Yahoo to RJFisher
I Say... Re: Are two separate procedures required for Corrective action and preventive actions

Quote:
In Reply to Parent Post by Jim Wynne View Post

I mostly agree, but was just pointing out the fact that PA=longer and more expensive as a defining term doesn't always hold true. Also, your example of PA, that of preventing materials from being dropped, is an example of CA, using the ISO definition--you're correcting an existing problem. If, when the process had been designed, some insightful person had anticipated the likelihood of material being dropped and installed the necessary controls, it would be PA.
I agree with Jim on this one... In fact, my company prefers to spend as little money as possible, and sometimes the best PAs have been the least expensive to implement.

On the issue of one or two procedures, my company has one procedure document for both CA and PA procedures, as well as one procedure for both Document and Record Control procedures. Thus, we've got 4 documents for the 6 ISO required procedures.

Just my
  #38  
Old 22nd April 2009, 07:07 PM
JaneB's Avatar
JaneB JaneB is offline
Consultant / Auditor

 
Registration Date: Feb 2006
Location: Melbourne, Australia
 
Posts: 3,414
Thanks Given to Others: 1,302
Thanked 1,681 Times in 1,109 Posts
Karma Power: 393
Karma: 11412
JaneB is appreciated, and has over 1700 Karma points.JaneB is appreciated, and has over 1700 Karma points.JaneB is appreciated, and has over 1700 Karma points.
JaneB is appreciated, and has over 1700 Karma points.JaneB is appreciated, and has over 1700 Karma points.JaneB is appreciated, and has over 1700 Karma points.JaneB is appreciated, and has over 1700 Karma points.JaneB is appreciated, and has over 1700 Karma points.JaneB is appreciated, and has over 1700 Karma points.JaneB is appreciated, and has over 1700 Karma points.JaneB is appreciated, and has over 1700 Karma points.JaneB is appreciated, and has over 1700 Karma points.JaneB is appreciated, and has over 1700 Karma points.JaneB is appreciated, and has over 1700 Karma points.JaneB is appreciated, and has over 1700 Karma points.JaneB is appreciated, and has over 1700 Karma points.JaneB is appreciated, and has over 1700 Karma points.
Re: Are two separate procedures required for Corrective action and preventive actions

Good to hear from you John, and some interesting points.

I assume you're talking specifically of what's the case in your organisation.

My view and experience is rather different. I don't go for the CA = short and cheap, PA = long and expensive at all. In fact, my view is that it depends (as always) on the particular issue, context, importance, risk etc. And common sense would appear to suggest that it's often cheaper to prevent a problem from arising in the first place than to have to fix one after it happened.

I've seen PAs that cost very little and took a very short time to do. And I've seen some CAs that cost many, many tens of thousands to fix and many, many months to complete.
__________________
people call me a feminist whenever I express sentiments that differentiate me from a doormat. Rebecca West
Thanks to JaneB for your informative Post and/or Attachment!
  #39  
Old 22nd April 2009, 11:18 PM
howste's Avatar
howste howste is offline
Thaumaturge

 
Registration Date: May 2003
Location: Utah
 
Posts: 4,141
Thanks Given to Others: 992
Thanked 1,912 Times in 1,041 Posts
Karma Power: 484
Karma: 14675
howste is appreciated, and has over 1700 Karma points.howste is appreciated, and has over 1700 Karma points.howste is appreciated, and has over 1700 Karma points.howste is appreciated, and has over 1700 Karma points.
howste is appreciated, and has over 1700 Karma points.howste is appreciated, and has over 1700 Karma points.howste is appreciated, and has over 1700 Karma points.howste is appreciated, and has over 1700 Karma points.howste is appreciated, and has over 1700 Karma points.howste is appreciated, and has over 1700 Karma points.howste is appreciated, and has over 1700 Karma points.howste is appreciated, and has over 1700 Karma points.howste is appreciated, and has over 1700 Karma points.howste is appreciated, and has over 1700 Karma points.howste is appreciated, and has over 1700 Karma points.howste is appreciated, and has over 1700 Karma points.howste is appreciated, and has over 1700 Karma points.howste is appreciated, and has over 1700 Karma points.
Re: Are two separate procedures required for Corrective action and preventive actions

Quote:
In Reply to Parent Post by jrugburn View Post

At least this is how I have approached it in my limited 20 years of manufacturing under the ISO umbrella.
I find it interesting that you've been working under the "ISO umbrella" for 20 years, and apparently haven't understood the ISO definitions for the terms corrective action and preventive action. The way you are using the terms, you're actually describing correction and corrective action:
Quote:
In Reply to Parent Post by ISO 9000

3.6.4 preventive action
action to eliminate the cause of a potential nonconformity (3.6.2) or other undesirable potential situation
NOTE 1 There can be more than one cause for a potential nonconformity.
NOTE 2 Preventive action is taken to prevent occurrence whereas corrective action (3.6.5) is taken to prevent recurrence.

3.6.5 corrective action
action to eliminate the cause of a detected nonconformity (3.6.2) or other undesirable situation
NOTE 1 There can be more than one cause for a nonconformity.
NOTE 2 Corrective action is taken to prevent recurrence whereas preventive action (3.6.4) is taken to prevent occurrence.
NOTE 3 There is a distinction between correction (3.6.6) and corrective action.

3.6.6 correction
action to eliminate a detected nonconformity (3.6.2)
NOTE 1 A correction can be made in conjunction with a corrective action (3.6.5).
NOTE 2 A correction can be, for example, rework (3.6.7) or regrade (3.6.8).
Thank You to howste for your informative Post and/or Attachment!
Reply

Lower Navigation Bar
Go Back   The Elsmar Cove Forum > Common Quality Assurance Processes and Tools > Documentation Control Systems, Procedures, Forms and Templates

Do you find this discussion thread helpful and informational?


Bookmarks


Visitors Currently Viewing this Thread: 1 (0 Registered Visitors (Members) and 1 Unregistered Guest Visitors)
 
Thread Tools Search this Thread
Search this Thread:

Advanced Forum Search
Display Modes Rate Thread Content
Rate Thread Content:

Forum Posting Settings
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off


Similar Discussion Threads
Discussion Thread Title Thread Starter Forum Replies Last Post or Poll Vote
CAPA (Corrective Action Preventive Action) Procedures Separate or Combined RJFisher Nonconformance and Corrective Action 9 5th March 2010 12:29 AM
Difference between corrective action impact and preventive actions. Rameshwar25 ISO/TS 16949 - International Automotive Quality Systems Standard 2 18th August 2009 10:28 AM
Preventive and Corrective Procedures - Separate Procedures? Special Procedures? sneekparty Nonconformance and Corrective Action 8 17th July 2006 10:52 PM
Corrective vs. Preventive Systems and Procedures - Separate Procedures? Marc Nonconformance and Corrective Action 12 17th July 2006 10:50 PM
Is a separate Corrective & Preventive Action procedure necessary? Christine Pearce Nonconformance and Corrective Action 10 16th September 2003 03:03 PM



The time now is 02:06 PM. All times are GMT -4.
Your time zone can be changed in your UserCP --> Options.


   


Marc Timothy Smith - Elsmar.com
8466 LeSourdsville-West Chester Road, West Chester, Ohio 45069-1929
513 341-6272