The Elsmar Cove Wiki More Free Files The Elsmar Cove Forums Discussion Thread Index Post Attachments Listing Failure Modes Services and Solutions to Problems Elsmar cove Forums Main Page Elsmar Cove Home Page

Go Back   The Elsmar Cove Forum > Archived - Students and Educational Institutions > Archived - Student Research Questions - Any Educational Institution
Forum Username

Elsmar Cove Forum Visitor Notice(s)


Elsmar Cove Forum Sidebar
Custom Search
Monitor the Elsmar Forum
Monitor New Forum Posts
Follow Marc & Elsmar
Elsmar Cove Forum RSS Feed  Marc Smith's Google+ Page  Marc Smith's Linked In Page   Marc Smith's Elsmar Cove YouTube Page  Marc Smith's Facebook Page
Elsmar Cove Groups
Elsmar Cove Google+ Group  Elsmar Cove LinkedIn Group  Elsmar Cove Facebook Group
Sponsor Links







Donate and $ Contributor Forum Access
Sponsored Links
Courtesy Quick Links

Links that Elsmar Cove visitors will find useful in your quest for knowledge:


Howard's
International Quality Services

Atul's
Symphony Technologies

Marcelo Antunes'
SQR Consulting

Bob Doering's
Correct SPC - Precision Machining


NIST's Engineering Statistics Handbook

IRCA - International Register of Certified Auditors

SAE - Society of Automotive Engineers

Quality Digest Portal

IEST - Institute of Environmental Sciences and Technology

ASQ - American Society for Quality


Related Topic Tags
cqe exam, probability calculation, student questions
 
 
Thread Tools Search this Thread Rate Thread Content Display Modes
  #1  
Old 2nd June 2011, 12:22 AM
RACHJAIS RACHJAIS is offline
Getting Involved (6 to 9 Posts)

 
Registration Date: May 2011
 
Posts: 6
Thanks Given to Others: 8
Thanked 0 Times in 0 Posts
Karma Power: 9
Karma: 10
RACHJAIS has less than 100 Karma points so far.
Let Me Help You CQE Exam Probability question - help needed

1) An inspection plan is set up to to randomly sample 3ft^2 of a 1000 ft^2 carpet and to accept the carpet if no flaws are found in the 3 ft^2 sample. is the probability that a roll of carpet with an average of 1 flaw per square foot will be rejected by the plan? Answer is 0.95.... How do u solve it?

2) A process is in control with a defect rate of 0.2%. A sampling plans calls for 30 items to be
selected at random, and for the process to be shut down and corrected if any defects are found. How
often will the process be shut down without a change in the defect rate ?
A. 1.22% of the time B. 5.83% of the time C. 3.91% of the time D. None of the above
Answer : B

I would really appreciate if someone could help me out with the solutions... The exam is this coming saturday

Sponsored Links
  #2  
Old 2nd June 2011, 02:11 AM
debyang debyang is offline
Involved in Discussions

 
Registration Date: Jan 2009
Location: Taiwan
 
Posts: 44
Thanks Given to Others: 9
Thanked 21 Times in 14 Posts
Karma Power: 22
Karma: 209
debyang is appreciated, and has over 200 Karma points.debyang is appreciated, and has over 200 Karma points.debyang is appreciated, and has over 200 Karma points.
Re: CQE exam probability question- help needed

Both questions can be resolved by using Execl function Poisson distribution.
Q1. mean=1/ft^2x3ft^2=3, accept Pr =POISSON(0,3,true)=0.049787, reject Pr=1-accept Pr=1-0.049787=0.95

Q2.mean=0.2%x30=0.06, no defect Pr=POISSON(0,0.06,true)=0.941765,
defect found Pr=1-0.941765=0.058235=5.823%
Sponsored Links

  #3  
Old 2nd June 2011, 10:22 AM
RACHJAIS RACHJAIS is offline
Getting Involved (6 to 9 Posts)

 
Registration Date: May 2011
 
Posts: 6
Thanks Given to Others: 8
Thanked 0 Times in 0 Posts
Karma Power: 9
Karma: 10
RACHJAIS has less than 100 Karma points so far.
Re: CQE exam probability question- help needed

for the first question: To calculate the mean; n= 3 and P = 1??? thas how u calculated the mean?
I appreciate ur help!
  #4  
Old 2nd June 2011, 10:57 PM
debyang debyang is offline
Involved in Discussions

 
Registration Date: Jan 2009
Location: Taiwan
 
Posts: 44
Thanks Given to Others: 9
Thanked 21 Times in 14 Posts
Karma Power: 22
Karma: 209
debyang is appreciated, and has over 200 Karma points.debyang is appreciated, and has over 200 Karma points.debyang is appreciated, and has over 200 Karma points.
Re: CQE Exam Probability question - help needed

Your question is stated that "an average 1 flaw per sq ft.
 

Lower Navigation Bar
Go Back   The Elsmar Cove Forum > Archived - Students and Educational Institutions > Archived - Student Research Questions - Any Educational Institution

Do you find this discussion thread helpful and informational?


Bookmarks


Visitors Currently Viewing this Thread: 1 (0 Registered Visitors (Members) and 1 Unregistered Guest Visitors)
 
Thread Tools Search this Thread
Search this Thread:

Advanced Forum Search
Display Modes Rate Thread Content
Rate Thread Content:

Forum Posting Settings
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off


Similar Discussion Threads
Discussion Thread Title Thread Starter Forum Replies Last Post or Poll Vote
CQE sample exam - Question 23 about a regression model Southern Cross SPC Monitoring and Statistical Analysis Techniques 3 14th November 2011 07:44 PM
CQE Exam Machine Capability Question - HELP Adamssr Capability, Accuracy and Stability - Process, Machine, etc. 7 7th November 2011 03:31 PM
Study Materials needed for CQE Exam DK2327 Book, Video, Blog and Web Site Reviews and Recommendations 7 10th September 2010 04:00 PM
CQE Exam question on Probability Calculation Mehtap Archived - Student Research Questions - Any Educational Institution 1 24th May 2010 01:50 AM
Capability question from CQE exam UK Steve Capability, Accuracy and Stability - Process, Machine, etc. 7 14th December 2008 11:48 AM



The time now is 04:03 PM. All times are GMT -4.
Your time zone can be changed in your UserCP --> Options.


   


Marc Timothy Smith - Elsmar.com
8466 LeSourdsville-West Chester Road, Olde West Chester, Ohio 45069-1929
513 341-6272