The Elsmar Cove Wiki More Free Files The Elsmar Cove Forums Discussion Thread Index Post Attachments Listing Failure Modes Services and Solutions to Problems Elsmar cove Forums Main Page Elsmar Cove Home Page
Go Back   The Elsmar Cove Forum > Manufacturing, Service, and Business Systems Processes > Manufacturing and Related Processes
Forum Username


Search the Elsmar Cove
Custom Search
Monitor the Elsmar Forum
Follow Marc & Elsmar
Elsmar Cove Forum RSS Feed  Marc Smith's Google+ Page  Marc Smith's Linked In Page   Marc Smith's Elsmar Cove YouTube Page  Marc Smith's Facebook Page  Elsmar Cove Twitter Feed
Elsmar Cove Groups
Elsmar Cove Google+ Group  Elsmar Cove LinkedIn Group  Elsmar Cove Facebook Group
Sponsor Links





Donate and $ Contributor Forum Access

Click the graphic above.
Courtesy Quick Links

Links that Elsmar Cove visitors will find useful in your quest for knowledge:

Howard's
International Quality Services
Marcelo Antunes'
SQR Consulting
Bob Doering's
Correct SPC - Precision Machining

NIST's Engineering Statistics Handbook
IRCA - International Register of Certified Auditors
SAE - Society of Automotive Engineers
Quality Digest Portal
IEST - Institute of Environmental Sciences and Technology
ASQ - American Society for Quality

Related Topic Tags
audit checklist, audits and auditing, cables (electrical and related such as signal carriers), cables (general), manufacturing (general term)
Reply
 
Thread Tools Search this Thread Rate Thread Content Display Modes
  #1  
Old 4th May 2012, 12:25 PM
davelim davelim is offline
Shy Poster (1 to 5 Posts)

 
Registration Date: May 2012
 
Posts: 2
Thanks Given to Others: 4
Thanked 0 Times in 0 Posts
Karma Power: 10
Karma: 10
davelim has less than 100 Karma points so far.
Thank You! Cable Manufacturing Build Audit Checklist

appreciate it if any one can help on this.
I going to audit one of the supplier for normal computer cable build, but i need a sample checklist which let me know what key point need to included in my audit check list, such like with 4M1H method, thanks!


Dave

Sponsored Links
  #2  
Old 4th May 2012, 03:47 PM
dsanabria dsanabria is offline
Appreciated Member

 
Registration Date: Oct 2007
Location: United States, connecticut
 
Posts: 654
Thanks Given to Others: 158
Thanked 273 Times in 176 Posts
Karma Power: 97
Karma: 2109
dsanabria is appreciated, and has over 1700 Karma points.dsanabria is appreciated, and has over 1700 Karma points.dsanabria is appreciated, and has over 1700 Karma points.dsanabria is appreciated, and has over 1700 Karma points.dsanabria is appreciated, and has over 1700 Karma points.dsanabria is appreciated, and has over 1700 Karma points.dsanabria is appreciated, and has over 1700 Karma points.dsanabria is appreciated, and has over 1700 Karma points.dsanabria is appreciated, and has over 1700 Karma points.dsanabria is appreciated, and has over 1700 Karma points.dsanabria is appreciated, and has over 1700 Karma points.dsanabria is appreciated, and has over 1700 Karma points.dsanabria is appreciated, and has over 1700 Karma points.
Re: Cable Manufacturing Build Audit Checklist

Quote:
In Reply to Parent Post by davelim View Post

appreciate it if any one can help on this.
I going to audit one of the supplier for normal computer cable build, but i need a sample checklist which let me know what key point need to included in my audit check list, such like with 4M1H method, thanks!


Dave
What is a 4M1H Method - different meaning for different sectors.
Thanks to dsanabria for your informative Post and/or Attachment!
Sponsored Links

  #3  
Old 4th May 2012, 04:38 PM
Chance Chance is offline
Involved in Discussions

 
Registration Date: Jan 2010
Location: Texas, USA
 
Posts: 506
Thanks Given to Others: 809
Thanked 62 Times in 57 Posts
Karma Power: 69
Karma: 464
Chance is appreciated, and has over 400 Karma points.Chance is appreciated, and has over 400 Karma points.Chance is appreciated, and has over 400 Karma points.Chance is appreciated, and has over 400 Karma points.Chance is appreciated, and has over 400 Karma points.
Re: Cable Manufacturing Build Audit Checklist

Acquire a copy of their standard operating procedures and build your checklist against it. Try to at least familiarize their process and verify during your audit if they are doing what they say they do.
Thanks to Chance for your informative Post and/or Attachment!
  #4  
Old 4th May 2012, 10:01 PM
harry harry is offline
Super Moderator

 
Registration Date: Sep 2005
Location: Johore/Malaysia
 
Posts: 6,262
Thanks Given to Others: 1,495
Thanked 2,970 Times in 2,064 Posts
Blog Entries: 2
Karma Power: 700
Karma: 18790
harry is appreciated, and has over 1700 Karma points.harry is appreciated, and has over 1700 Karma points.
harry is appreciated, and has over 1700 Karma points.harry is appreciated, and has over 1700 Karma points.harry is appreciated, and has over 1700 Karma points.harry is appreciated, and has over 1700 Karma points.harry is appreciated, and has over 1700 Karma points.harry is appreciated, and has over 1700 Karma points.harry is appreciated, and has over 1700 Karma points.
Re: Cable Manufacturing Build Audit Checklist

Welcome to the Cove.

You should begin by finding out the objective of the audit. What are the specific problems so that you can zero in to have a better understanding of the issue at hand.


Wire Harness Inspection
Thanks to harry for your informative Post and/or Attachment!
  #5  
Old 4th May 2012, 11:40 PM
somashekar's Avatar
somashekar somashekar is offline
Cross Forum Moderator

 
Registration Date: Mar 2008
Location: Bangalore city, INDIA
 
Posts: 4,488
Thanks Given to Others: 1,483
Thanked 2,336 Times in 1,645 Posts
Blog Entries: 2
Karma Power: 504
Karma: 15073
somashekar is appreciated, and has over 1700 Karma points.
somashekar is appreciated, and has over 1700 Karma points.
Send a message via Yahoo to somashekar
Re: Cable Manufacturing Build Audit Checklist

Quote:
In Reply to Parent Post by davelim View Post

appreciate it if any one can help on this.
I going to audit one of the supplier for normal computer cable build, but i need a sample checklist which let me know what key point need to included in my audit check list, such like with 4M1H method, thanks!


Dave
I gather that you are talking about process audit.
Process familiarity is very much essential for you to be able to audit the same.
Please tell me if you are talking about wire drawing / extrusion process OR wire preparation, crimping and harness process.

__________________

Best Regards...
Somashekar BV, INDIA
Thanks to somashekar for your informative Post and/or Attachment!
  #6  
Old 6th May 2012, 09:34 AM
davelim davelim is offline
Shy Poster (1 to 5 Posts)

 
Registration Date: May 2012
 
Posts: 2
Thanks Given to Others: 4
Thanked 0 Times in 0 Posts
Karma Power: 10
Karma: 10
davelim has less than 100 Karma points so far.
Re: Cable Manufacturing Build Audit Checklist

Quote:
In Reply to Parent Post by somashekar View Post

I gather that you are talking about process audit.
Process familiarity is very much essential for you to be able to audit the same.
Please tell me if you are talking about wire drawing / extrusion process OR wire preparation, crimping and harness process.
Im going to audit the incoming quality process, wire preparation/off line process, production build process (Quality control, testing audit) for few server type cable such like data cable, power cable.
I need to start with few audit title in my checklist which mostly related with ISO & 4M method, thanks!
  #7  
Old 6th May 2012, 01:28 PM
AndyN's Avatar
AndyN AndyN is offline
Forum Moderator

 
Registration Date: Feb 2005
Location: Michigan, USA
 
Posts: 7,702
Thanks Given to Others: 4,397
Thanked 3,308 Times in 2,242 Posts
Karma Power: 852
Karma: 21899
AndyN is appreciated, and has over 1700 Karma points.AndyN is appreciated, and has over 1700 Karma points.AndyN is appreciated, and has over 1700 Karma points.
AndyN is appreciated, and has over 1700 Karma points.AndyN is appreciated, and has over 1700 Karma points.AndyN is appreciated, and has over 1700 Karma points.AndyN is appreciated, and has over 1700 Karma points.AndyN is appreciated, and has over 1700 Karma points.AndyN is appreciated, and has over 1700 Karma points.AndyN is appreciated, and has over 1700 Karma points.
Send a message via Skype™ to AndyN
Question Re: Cable Manufacturing Build Audit Checklist

Quote:
In Reply to Parent Post by davelim View Post

Im going to audit the incoming quality process, wire preparation/off line process, production build process (Quality control, testing audit) for few server type cable such like data cable, power cable.
I need to start with few audit title in my checklist which mostly related with ISO & 4M method, thanks!
Are you experienced in this process, Dave? If you have a checklist, will you know what answers are good answers and those which aren't so good?

Doing an audit isn't about asking questions and not knowing the answers - or worse, just what ISO says...

__________________

'Cause you know sometimes words have two meanings.....
Reply

Lower Navigation Bar
Go Back   The Elsmar Cove Forum > Manufacturing, Service, and Business Systems Processes > Manufacturing and Related Processes

Do you find this discussion thread helpful and informational?


Bookmarks


Visitors Currently Viewing this Thread: 1 (0 Registered Visitors (Members) and 1 Unregistered Guest Visitors)
 
Thread Tools Search this Thread
Search this Thread:

Advanced Forum Search
Display Modes Rate Thread Content
Rate Thread Content:

Forum Posting Settings
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off


Similar Discussion Threads
Discussion Thread Title Thread Starter Forum Replies Last Post or Poll Vote
The US Manufacturing Exodus Continues - Chinese to build Cessna business jets Marc National and International News 1 24th March 2012 06:12 AM
Production Trial Run Checklist or PV Build Checklist wanted MPLZB1 APQP and PPAP 3 20th March 2012 06:59 AM
Audit on Manufacturing Processes - a) Audit Checklist, and b) Detailed Audit Report swapnakp Process Audits and Layered Process Audits 13 26th October 2011 11:05 AM
Validation of Molding Process for Manufacturing Cable and Wire Harness vimalvg ISO 13485 and ISO 14969 - Medical Devices - Quality Management Systems 7 14th September 2010 04:41 PM
Does anybody have an audit checklist focused on Manufacturing processes? jchairezg Manufacturing and Related Processes 8 28th July 2009 06:31 AM



The time now is 09:08 AM. All times are GMT -4.
Your time zone can be changed in your UserCP --> Options.


   


Marc Timothy Smith - Elsmar.com
8466 LeSourdsville-West Chester Road, Olde West Chester, Ohio 45069-1929
513 341-6272