The Elsmar Cove Wiki More Free Files The Elsmar Cove Forums Discussion Thread Index Post Attachments Listing Failure Modes Services and Solutions to Problems Elsmar cove Forums Main Page Elsmar Cove Home Page

Go Back   The Elsmar Cove Forum > Common Quality Assurance Processes and Tools > SPC Monitoring and Statistical Analysis Techniques
Forum Username

Elsmar Cove Forum Visitor Notice(s)


Elsmar Cove Forum Sidebar
Custom Search
Monitor the Elsmar Forum
Monitor New Forum Posts
Follow Marc & Elsmar
Elsmar Cove Forum RSS Feed  Marc Smith's Google+ Page  Marc Smith's Linked In Page   Marc Smith's Elsmar Cove YouTube Page  Marc Smith's Facebook Page
Elsmar Cove Groups
Elsmar Cove Google+ Group  Elsmar Cove LinkedIn Group  Elsmar Cove Facebook Group
Sponsor Links







Donate and $ Contributor Forum Access
Sponsored Links
Courtesy Quick Links

Links that Elsmar Cove visitors will find useful in your quest for knowledge:


Howard's
International Quality Services

Atul's
Symphony Technologies

Marcelo Antunes'
SQR Consulting

Bob Doering's
Correct SPC - Precision Machining


NIST's Engineering Statistics Handbook

IRCA - International Register of Certified Auditors

SAE - Society of Automotive Engineers

Quality Digest Portal

IEST - Institute of Environmental Sciences and Technology

ASQ - American Society for Quality

Reply
 
Thread Tools Search this Thread Rating: Thread Rating: 1 votes, 4.00 average. Display Modes
  #1  
Old 3rd July 2003, 09:40 AM
cleverfox's Avatar
cleverfox cleverfox is offline
Inactive Registered Visitor

 
Registration Date: May 2003
Location: MI
Age: 42
 
Posts: 36
Thanks Given to Others: 0
Thanked 3 Times in 2 Posts
Karma Power: 44
Karma: 82
cleverfox has less than 100 Karma points so far.
Send a message via Yahoo to cleverfox
Question Process average targets for LSL only.

I have many processes where there is only a lower spec limit. The process averages are close to the spec limit. My control limits are narrow and also too close to the spec limit. Many single points of data are below the limit.

I know that I have to have the process average adjusted away from the lower spec limit, but is there a mathematical way to calculate a target for the process average? I can do it with characteristics with both a lower and an upper spec limit, centered that is.

You may ask why do this? Because statistically many of our process averages and control limits are typically closer to one of the spec limits. I have an excel worksheet that graphs the data on X bar R charts and I want to show manufacturing where, graphically, their process should be running.

Thanks

Sponsored Links
  #2  
Old 3rd July 2003, 11:36 AM
Mike S. Mike S. is offline
An Early 'Cover'

 
Registration Date: Mar 2002
Location: East Coast US
 
Posts: 1,819
Thanks Given to Others: 28
Thanked 75 Times in 54 Posts
Karma Power: 230
Karma: 1979
Mike S. is appreciated, and has over 1700 Karma points.Mike S. is appreciated, and has over 1700 Karma points.Mike S. is appreciated, and has over 1700 Karma points.Mike S. is appreciated, and has over 1700 Karma points.Mike S. is appreciated, and has over 1700 Karma points.Mike S. is appreciated, and has over 1700 Karma points.Mike S. is appreciated, and has over 1700 Karma points.Mike S. is appreciated, and has over 1700 Karma points.Mike S. is appreciated, and has over 1700 Karma points.Mike S. is appreciated, and has over 1700 Karma points.Mike S. is appreciated, and has over 1700 Karma points.Mike S. is appreciated, and has over 1700 Karma points.
I always preface my statistical advice by saying I'm no expert on this stuff. However, I'll take a stab since no one else has, FWIW.

I think you're after Cpl -- preferably it should be > 1.33 (higher the better, though). Cpl = (process average - LSL) / 3 sigma hat where sigma hat is rbar/d2

I think your answer is this question: Where should your process average be so that Cpl is > 1.33?

Make sense?

Anyone else?
__________________
Mike S. ("Gun Nut")
And they ask me why I drink....
Sponsored Links

  #3  
Old 3rd July 2003, 02:31 PM
cleverfox's Avatar
cleverfox cleverfox is offline
Inactive Registered Visitor

 
Registration Date: May 2003
Location: MI
Age: 42
 
Posts: 36
Thanks Given to Others: 0
Thanked 3 Times in 2 Posts
Karma Power: 44
Karma: 82
cleverfox has less than 100 Karma points so far.
Send a message via Yahoo to cleverfox
Mike,

I am definately not an expert on SPC . However, I am not after the Cpl, at least not until I have more data. I am after something a little easier. Like I said above, I want to plot the actual process average (a straight dotted line on the x-bar chart) against the best possible or "target" process average.

The problem is that I am not sure how to calculate this to plot it on the chart which only has a lower spec limit.

I know how to do it for characteristics that have an upper and a lower spec limit.

I was hoping someone may have some idea or may have done this in the past and could explain it to me.

Not sure if I must determine for myself using my own judgement, or if there is a more sound way to do it.

Thanks though for taking a stab at it.
  #4  
Old 3rd July 2003, 03:35 PM
Mike S. Mike S. is offline
An Early 'Cover'

 
Registration Date: Mar 2002
Location: East Coast US
 
Posts: 1,819
Thanks Given to Others: 28
Thanked 75 Times in 54 Posts
Karma Power: 230
Karma: 1979
Mike S. is appreciated, and has over 1700 Karma points.Mike S. is appreciated, and has over 1700 Karma points.Mike S. is appreciated, and has over 1700 Karma points.Mike S. is appreciated, and has over 1700 Karma points.Mike S. is appreciated, and has over 1700 Karma points.Mike S. is appreciated, and has over 1700 Karma points.Mike S. is appreciated, and has over 1700 Karma points.Mike S. is appreciated, and has over 1700 Karma points.Mike S. is appreciated, and has over 1700 Karma points.Mike S. is appreciated, and has over 1700 Karma points.Mike S. is appreciated, and has over 1700 Karma points.Mike S. is appreciated, and has over 1700 Karma points.
Perhaps I don't understand your need. Here's what I'm thinking with a simple made-up example.

Let's say your LSL is 10 (spec. >/= 10). Your control chart subgroup size is 5, process average is 12, and your r-bar (avg. of subgroup ranges) is 3, and so you have some points out of spec. (too low). You want to know where to tell the mfg. guys their process average should be so that, if the variation stays the same, they don't make bad parts.

Current Cpl = (12-10)/ 3.869 = 0.517 (not good)

If your process average was raised to 15.2 and the variation stayed the same, Cpl would be (15.2 - 10)/3.869 = 1.344, in which case you should have very few points out of spec. (many companies set > 1.33 as a target for Cpl or Cpk)

Of course, you could achieve fewer rejects by also lowering the variation in the process, but you say you want to change the process average. This is how I would calculate where that average should be.
__________________
Mike S. ("Gun Nut")
And they ask me why I drink....
  #5  
Old 5th July 2003, 09:48 AM
Ravi Khare's Avatar
Ravi Khare Ravi Khare is offline
Involved - Posts

 
Registration Date: Dec 2001
Location: Pune, India
Age: 52
 
Posts: 70
Thanks Given to Others: 0
Thanked 3 Times in 3 Posts
Karma Power: 54
Karma: 58
Ravi Khare has less than 100 Karma points so far.
To start with, you could move the setting by a distance that would give you a Cpl of 1.33.
On obtaining more samples, at this setting, you can perform the t-test to find out whether you are sufficiantly away from the LSL. If the different between the observed mean and the LSL comes out statistically significant in the t-test, you are safely away from the LSL. t-test works well for small samples.
At the risk of telling you what you already know, I would put down A few points to note.
1. The t-statistic has its own 'alfa' risk. So if you refer to a 5% alfa risk t-table your decision can go wrong 5% of the times.
2.Control charts denote stability, and not reflect on Quality. You can have a situation where a control chart shows all points within control limits, yet rejection at a substantial level. If you use subgroup sizes above 1, the assumption of normality of raw data too cannot be verified, since averages are automatically normally distributed by the virtue of the Central Limit Theorem. Control charts for one sided tolerances will have both the control limits.
3. I would suggest, Look at the Cpk(lower) and verify your adjustment using the t-test.
  #6  
Old 8th July 2003, 09:58 AM
Darius's Avatar
Darius Darius is offline
Appreciated Information Resource

 
Registration Date: Mar 2002
Location: Monterrey Mexico
Age: 51
 
Posts: 478
Thanks Given to Others: 63
Thanked 171 Times in 119 Posts
Karma Power: 99
Karma: 3282
Darius is appreciated, and has over 1700 Karma points.
Darius is appreciated, and has over 1700 Karma points.Darius is appreciated, and has over 1700 Karma points.Darius is appreciated, and has over 1700 Karma points.
The use of Cpl sounds OK, but I tink that if there is a few data points you should take it in account to calculate the Cpl minimum estimated value (in my opinion CPK IS NOT A VALUE BUT A RANGE).

http://www.qualitydigest.com/may00/html/lastword.html

A must see article.

-----------------------

There is also other way to se the situation, as PreControl, in the cale of one spec limit, the target can be specificated using "the best value" away from the limit. In many cases "the best value" is no other but the value farther from the limit.

  #7  
Old 8th July 2003, 12:59 PM
Bill Ryan - 2007's Avatar
Bill Ryan - 2007 Bill Ryan - 2007 is offline
Email Address Invalid or Rejected by Recipient System

 
Registration Date: Jul 2002
Location: Madison, WI
 
Posts: 978
Thanks Given to Others: 15
Thanked 43 Times in 26 Posts
Karma Power: 0
Karma: 1107
Bill Ryan - 2007 is appreciated, and has over 1100 Karma points.Bill Ryan - 2007 is appreciated, and has over 1100 Karma points.Bill Ryan - 2007 is appreciated, and has over 1100 Karma points.Bill Ryan - 2007 is appreciated, and has over 1100 Karma points.Bill Ryan - 2007 is appreciated, and has over 1100 Karma points.Bill Ryan - 2007 is appreciated, and has over 1100 Karma points.Bill Ryan - 2007 is appreciated, and has over 1100 Karma points.Bill Ryan - 2007 is appreciated, and has over 1100 Karma points.Bill Ryan - 2007 is appreciated, and has over 1100 Karma points.
Cleverfox

Do you have enough data to compute a standard deviation (sigma hat)?? If so, in order to maintain a Cpk of 1.33 you would need to have your process mean at 4 sigma away from the LSL (this is without going into all the "normality" discussions). That is the simplest "formula" I can think of. (If you wish to maintain a Cpk of 1.67 or 2.00, you're mean would need to be 5 or 6 (resp.) sigma from the LSL).

Hope that helps (although it may be too simplistic??)

Bill
  #8  
Old 8th July 2003, 01:09 PM
cleverfox's Avatar
cleverfox cleverfox is offline
Inactive Registered Visitor

 
Registration Date: May 2003
Location: MI
Age: 42
 
Posts: 36
Thanks Given to Others: 0
Thanked 3 Times in 2 Posts
Karma Power: 44
Karma: 82
cleverfox has less than 100 Karma points so far.
Send a message via Yahoo to cleverfox
Bill,

Your idea is simple, which is what I wanted. I do have enough data to calculate std deviation. I should have thought to reverse calculate from the desired 1.33.

Thanks
Reply

Lower Navigation Bar
Go Back   The Elsmar Cove Forum > Common Quality Assurance Processes and Tools > SPC Monitoring and Statistical Analysis Techniques

Do you find this discussion thread helpful and informational?


Bookmarks


Visitors Currently Viewing this Thread: 1 (0 Registered Visitors (Members) and 1 Unregistered Guest Visitors)
 
Thread Tools Search this Thread
Search this Thread:

Advanced Forum Search
Display Modes Rate Thread Content
Rate Thread Content:

Forum Posting Settings
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off


Similar Discussion Threads
Discussion Thread Title Thread Starter Forum Replies Last Post or Poll Vote
Calculating Cp and Cpk for Product with only LSL (Lower Specification Limit) cleverfox Capability, Accuracy and Stability - Process, Machine, etc. 28 26th February 2012 12:08 PM
Calculating UCL (Upper Control Limit) and LCL (Lower Control Limit) Kenwatch SPC Monitoring and Statistical Analysis Techniques 14 19th October 2011 09:12 AM
Cpk with LSL (Lower Specification Limit) at zero? MDP001 SPC Monitoring and Statistical Analysis Techniques 3 19th March 2009 09:35 AM
One Tailed Process Validation - Process with only a lower specficiation limit DuttonT Manufacturing and Related Processes 7 29th November 2007 04:30 PM
SPC for One-sided Specification - Setting the Lower Control Limit keatwoon SPC Monitoring and Statistical Analysis Techniques 4 23rd March 2005 02:03 PM



The time now is 02:06 AM. All times are GMT -4.
Your time zone can be changed in your UserCP --> Options.


   


Marc Timothy Smith - Elsmar.com
8466 LeSourdsville-West Chester Road, Olde West Chester, Ohio 45069-1929
513 341-6272