M
mitch37
I am looking at an FMCG Site that is building anew warehouse to cater for their product load and sales forecast after installation of a new production line. The new warehouse is across the trcuk access road through the plant. We have looked at various ways of getting the product across. Pallet conveyors are an option, however the maintenance would be great, and it would be in a curent area of high traffic. I have looked at perhaps rerouting the road, but it is difficult due to the site being built on multi-levels. Has anyone had any similar issues? I cannot post the layout due to this being a highly favourable brand.
The new Warehouse is 60m away as the crow flies diagonally (NE).
The new Warehouse is 60m away as the crow flies diagonally (NE).