Q
qualityboi
7.3.4.1 Calls out that, "You shall define, analyze and report (in summary) measurements at specified stages of design and development, as an input for management review. Why is this not called out in 5.6.2? Can we monitor and review it at a lower stage than top management, just as long as it is reviewed?