Garfield_01 - 2011
Hello all,
I'm new to the forum, just only visit. But now i have a question regarding the DFMEA and PFMEA. We are thr IC assembly and test subcontractor. Design is also one part of the processes. Now we have a problem with the incomplete DFMEA and the linkage to PFMEA. The concept of DFMEA and PFMEA is mixed up. The current design control columns are blank with the reason form R&D personnel that we have never run this package, so we don't have any idea of how the current design control ( Detection and Prevention) should go. Does anyone have an idea how to fix this problem. I'm a quality system engineer and I have to response to the customer CAR. Could anyone shed me light, pls?
Thanks in advance
Garfield 01
I'm new to the forum, just only visit. But now i have a question regarding the DFMEA and PFMEA. We are thr IC assembly and test subcontractor. Design is also one part of the processes. Now we have a problem with the incomplete DFMEA and the linkage to PFMEA. The concept of DFMEA and PFMEA is mixed up. The current design control columns are blank with the reason form R&D personnel that we have never run this package, so we don't have any idea of how the current design control ( Detection and Prevention) should go. Does anyone have an idea how to fix this problem. I'm a quality system engineer and I have to response to the customer CAR. Could anyone shed me light, pls?
Thanks in advance
Garfield 01