A
andygr
Is there any hard requirement in the AS standard(s) ( not contractual with registrar) for the time in which a "special audit" must occur? For instance if a manufacturing facility transfers the assembly process to a location that only has a Engineering scope on their certification. The scope must now expand to include manufacturing and there would be a physical location change with the co-location of the design and assembly operation.
I am being told the "Standard" requires it to occur with in 30 days but can not find this specific time constraint defined.
Thanks in advance.
I am being told the "Standard" requires it to occur with in 30 days but can not find this specific time constraint defined.
Thanks in advance.