|
Re: Reporting Composite FCF on Layout (GD&T)
I have seen and done it both ways. The use of 2 seperate ballon numbers is probably preferable and should eliminate any confusion when referencing it.
Their isn't much in the way of standards for ballooning drawings that i am aware of, i know GE has their methods, probably some others as well.
__________________
James Altmann, ASQ-CQE, CMQ/OE, CQA
|