|
Elsmar Cove Forum Sidebar
|
|
|
|
Monitor the Elsmar Forum
|
| Monitor New Forum Posts
|
|
Follow Marc & Elsmar
|
|
|
Elsmar Cove Groups
|
|
|
Sponsor Links
|
|
|
|
|
|
Donate and $ Contributor Forum Access
|
 |
|
Sponsored Links
|
|
|
|
Courtesy Quick Links
|
 Links that Elsmar Cove visitors will find useful in your quest for knowledge:
Howard's International Quality Services
Atul's Symphony Technologies
Marcelo Antunes' SQR Consulting
Bob Doering's Correct SPC - Precision Machining
NIST's Engineering Statistics Handbook
IRCA - International Register of Certified Auditors
SAE - Society of Automotive Engineers
Quality Digest Portal
IEST - Institute of Environmental Sciences and Technology
ASQ - American Society for Quality
|
|
 |

29th June 2012, 03:07 PM
|
|
Shy Poster (1 to 5 Posts)
Registration Date: Nov 2010
Location: USA, Minnesota
|
|
Posts: 4
Thanks Given to Others: 16
Thanked 0 Times in 0 Posts
Karma Power: 11 Karma: 10 
|
|
Auditing ISO 22000 - 8.4.3 Records of analysis by Food Safety Team
Question: does the food safety team verification need to be a separate record, or can it be included as part of the management review record? Either way, what information should be included for it to be a valid record?
Background: Section 8.4.3 of ISO 22000:2005 standard states that "The food safety team shall analyse the results of verification activities...results of the analysis and the resulting activities shall be recorded." It also states that the results shall be reported as input to the management review. While doing an internal audit, I was told that the record of the the analysis was included as part of the management review meeting notes. The meeting notes do not tell me who anyalzed the verification activities or when, just what was presented to top management and the date of the food safety system management review. I noted this as a nonconformity, but that raised questions as to why there need to be separate records.
Please advise. Thank you!
|

30th June 2012, 02:25 PM
|
 |
Cross Forum Moderator
Registration Date: May 2003
Location: Charlotte, North Carolina.
|
|
Posts: 13,437
Thanks Given to Others: 2,952
Thanked 4,274 Times in 3,029 Posts
Karma Power: 1431
|
|
|
Re: Auditing ISO 22000 - 8.4.3 Records of analysis by Food Safety Team
A Quick Bump!
Can someone help?
Thank you very much!!
|

30th June 2012, 02:33 PM
|
 |
Forum Moderator
Registration Date: Feb 2005
Location: Michigan, USA
|
|
Posts: 7,014
Thanks Given to Others: 4,010
Thanked 2,865 Times in 1,962 Posts
Karma Power: 774
|
|
Re: Auditing ISO 22000 - 8.4.3 Records of analysis by Food Safety Team
Quote:
In Reply to Parent Post by Dulcie
Question: does the food safety team verification need to be a separate record, or can it be included as part of the management review record? Either way, what information should be included for it to be a valid record?
Background: Section 8.4.3 of ISO 22000:2005 standard states that "The food safety team shall analyse the results of verification activities...results of the analysis and the resulting activities shall be recorded." It also states that the results shall be reported as input to the management review. While doing an internal audit, I was told that the record of the the analysis was included as part of the management review meeting notes. The meeting notes do not tell me who anyalzed the verification activities or when, just what was presented to top management and the date of the food safety system management review. I noted this as a nonconformity, but that raised questions as to why there need to be separate records.
Please advise. Thank you!
|
My guess is that part of your problem is auditing to the standard, which internal auditors shouldn't really be doing! However, given the situation, the way it's supposed to work is:
HACCP plans call out what kinds of verification activities are needed
The results of the verifications are recorded, often in terms of quantity of product processed, time, shift, incoming raw materials, etc. and so on.
The data from these activities should be analyzed and this analysis should be sent to management for review.
__________________
'Cause you know sometimes words have two meanings.....
|
|
Thanks to AndyN for your informative Post and/or Attachment!
|
|

6th July 2012, 10:35 AM
|
 |
Involved in Discussions
Registration Date: Jun 2008
Location: Harrisburg, PA
|
|
Posts: 129
Thanks Given to Others: 89
Thanked 115 Times in 62 Posts
Karma Power: 34
|
|
|
Re: Auditing ISO 22000 - 8.4.3 Records of analysis by Food Safety Team
The analysis is ussualy done during a food safety team meeting and then as Andy suggested, presented at the Management Review.
If done during a food safety team meeting, the minutes of the meeting can be used as the record of analysis.
__________________
I didn't say it was your fault, I said I was blaming you.
|
|
Thanks to tsmith7858 for your informative Post and/or Attachment!
|
|

6th July 2012, 10:40 AM
|
|
Shy Poster (1 to 5 Posts)
Registration Date: Nov 2010
Location: USA, Minnesota
|
|
Posts: 4
Thanks Given to Others: 16
Thanked 0 Times in 0 Posts
Karma Power: 11 Karma: 10 
|
|
|
Re: Auditing ISO 22000 - 8.4.3 Records of analysis by Food Safety Team
 Thanks - these responses help!
|
Lower Navigation Bar
|
|
|
Do you find this discussion thread helpful and informational?
|
Visitors Currently Viewing this Thread: 1 (0 Registered Visitors (Members) and 1 Unregistered Guest Visitors)
|
|
|
| Thread Tools |
Search this Thread |
|
|
|
| Display Modes |
Rate Thread Content |
Linear Mode
|
|
Forum Posting Settings
|
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts
HTML code is Off
|
|
|
|
|