P
pjkbd
I need some help. I am trying to set up Minitab in a way that will allow me to basically create a template. I have to do many source release documents prior to PPAP and I want to create all the graphs I need then be able to replace the data and have the graphs automatically update.
I have already set the program to "automatically update graphs" by clicking on options in the tools tab and selecting graphics and other graphics options.
I created a project with all the graphs I needed and all the headings I needed in the worksheet. When I pasted new data into the worksheet the graphs did not update and the ability to manually update them was no longer available (grayed out).
What am I doing wrong? This would save me loads of time if I can get it to work.
Thanks in advance.
I have already set the program to "automatically update graphs" by clicking on options in the tools tab and selecting graphics and other graphics options.
I created a project with all the graphs I needed and all the headings I needed in the worksheet. When I pasted new data into the worksheet the graphs did not update and the ability to manually update them was no longer available (grayed out).
What am I doing wrong? This would save me loads of time if I can get it to work.
Thanks in advance.