The Elsmar Cove Wiki More Free Files The Elsmar Cove Forums Discussion Thread Index Post Attachments Listing Failure Modes Services and Solutions to Problems Elsmar cove Forums Main Page Elsmar Cove Home Page
Miner's MSA (Measurement Systems Analysis) Blog   Elsmar.com Forum Home Page
Go Back   The Elsmar Cove Forum > Common Quality Assurance Processes and Tools > APQP and PPAP
Forum Username

Search the Elsmar Cove
Custom Search
Monitor the Elsmar Forum
Follow Marc & Elsmar
Elsmar Cove Forum RSS Feed  Marc Smith's Google+ Page  Marc Smith's Linked In Page   Marc Smith's Elsmar Cove YouTube Page  Marc Smith's Facebook Page  Elsmar Cove Twitter Feed
Elsmar Cove Groups
Elsmar Cove Google+ Group  Elsmar Cove LinkedIn Group  Elsmar Cove Facebook Group
Donate and $ Contributor Forum Access

Courtesy Quick Links

Links that Elsmar Cove visitors will find useful in your quest for knowledge:

Howard's
International Quality Services
Marcelo Antunes'
SQR Consulting
Bob Doering's
Correct SPC - Precision Machining

NIST's Engineering Statistics Handbook
IRCA - International Register of Certified Auditors
SAE - Society of Automotive Engineers
Quality Digest Portal
IEST - Institute of Environmental Sciences and Technology
ASQ - American Society for Quality

Related Topic Tags
initial sample inspection report, ppap (production part approval process), isir (initial sample inspection report)
Reply
 
Thread Tools Search this Thread Rate Thread Content Display Modes
  #1  
Old 11th June 2001, 08:29 PM
bunda

 
 
Posts: n/a
Question Is PPAP the same process as a ISIR (Initial Sample inspection report)?

im interested in knowing whether a PPAP is the same process as a ISIR.

Anyone out there can help/

Ta

Martin

Sponsored Links
  #2  
Old 11th June 2001, 08:45 PM
Marc's Avatar
Marc

 
 
Posts: 24,263
Yin Yang

Yes - they're more or less the same. Well - There's more to PPAP than to an ISIR. It involves process aspects and such.
Sponsored Links

  #3  
Old 12th June 2001, 01:56 AM
Howard Atkins's Avatar
Howard Atkins

 
 
Posts: 2,913
ISIR is generally used by VDA. According to VDA 2 which is the relevant document.
The demands for documentation are usually less and there are different forms.

Last edited by Howard Atkins; 20th March 2006 at 01:29 AM. Reason: link removed
  #4  
Old 12th June 2001, 06:09 AM
Marc's Avatar
Marc

 
 
Posts: 24,263
Yin Yang

I agree that they are different in some ways, however they are as alike as they are different. Early on, as I understand it, ISIR (also called ISR and several other acronymns) was just a layout inspection.

I first ran into ISIR (Initial Sample Inspection Report) requirements during the military manufacturing phase of my life. What comprised an ISIR in the 1970's and 1980's was dependent upon the specific contract and the specific customer. Sometimes it was just a layout. Sometimes, as in the automotive PPAP, it included inspection and test data and/or run-off data and/or sample parts, etc.

-> I've been asked to do a contract at a firm which require
-> PPAP's being finished, I've actually performed the PPAP
-> process so at this stage would not know were to begin,
-> you say they are similar to ISIR that's fine and I have
-> an understanding of the FMEA process (not brilliant but
-> okay!) am I worrying to much about nothing or will all be
-> okay and fit into place. My boss has every confidence in
-> sending me into the big wide world - I'm a contracted
-> Quality Engineer who recently completed a 12 month
-> contract as a Quality Systems Engineer (ISO 9000) NOT
-> doing FMEA's though just 9000 stuff.

Well, PPAP is what your customer has defined for you. The impotant part is you go through the APQP process as dictated for a part or product. PPAP is the submission of the results - runoff data, layout, sample parts, etc. But like the way I learned military ISIR, not every APQP process is the same. I once had a customer who produced about 5 specialty parts for GM every year. Their APQP process (and thus their PPAP) was quite different than that of a customer which supplied over 1M struts a year to Ford.

Each APQP is different and since PPAP is simply submission of data from the APQP process, etc., each PPAP is also different. An example is that a process FMEA and control plan is required to be produced during the APQP process. PPAP is where you submit the FMEA.

See http://Elsmar.com/APQP/
  #5  
Old 12th June 2001, 08:57 AM
Sam's Avatar
Sam

 
 
Posts: 1,447
Ford used the term ISIR before QSS9000, some people at Ford still do.
Honda, Toyota, Mercedes, Nisson all refer to the term ISIR. All have varying documentation requirements. Toyota, for example, requires customer approved BOM, Drawings and packaging data prior to ISIR submission.
  #6  
Old 12th June 2001, 09:32 AM
Howard Atkins's Avatar
Howard Atkins

 
 
Posts: 2,913
I have only seen this in reference to German companies, thanks for the info
  #7  
Old 12th June 2001, 09:51 AM
Marc's Avatar
Marc

 
 
Posts: 24,263
Yin Yang

I know Honda has one - as Sam pointed out. I remember Honda had a manual, but you still had to confirm and agree with your supplier SQA exaactly what they wanted. An example is parts retention. If you make hoods for cars you space gets limited as opposed to say a brake cylinder. Bottom line is - contract your customer SQA (or other equivalent contact) to define exactly what they want. Like Honda, I suspect Toyota, et al. also have base manuals.

ISRs (ISIRs) are a very old concept.
  #8  
Old 15th March 2006, 07:55 PM
wanamir

 
 
Posts: 19
Recently I had received I.S.I.R requirement from BlauPunkt. When we compared with our PPAP items apparently all I.S.I.R items already included inside our PPAP.
Reply

Lower Navigation Bar
Go Back   The Elsmar Cove Forum > Common Quality Assurance Processes and Tools > APQP and PPAP

Do you find this discussion thread helpful and informational?


Bookmarks


Visitors Currently Viewing this Thread: 2 (0 Registered Visitors (Members) and 2 Unregistered Guest Visitors)
 
Thread Tools Search this Thread
Search this Thread:

Advanced Forum Search
Display Modes Rate Thread Content
Rate Thread Content:

Forum Posting Settings
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off


Similar Discussion Threads
Discussion Thread Title Thread Starter Forum Replies Last Post or Poll Vote
ISIR vs. PPAP - Customer is requesting an ISIR Cover Sheet according VDA Piffepoffe Quality Management Related Issues 5 16th May 2011 05:07 AM
General Term for Inspection Process of Sample Parts that everyone can understand Kira_n Supplier Quality Assurance and other Supplier Issues 10 29th July 2010 04:41 PM
Incoming Quality Receiving Inspection Report sample Mike SAR Supplier Quality Assurance and other Supplier Issues 2 20th July 2009 07:40 PM
Initial sample approval guidelines - PPAP, FAIR, etc. for medical devices Howard Atkins ISO 13485 and ISO 14969 - Medical Devices - Quality Management Systems 2 9th December 2005 03:13 AM
ISIR (Initial Sample Inspection Report) vs. PSW (Part Sample Warrant) Scott Hackler ISO/TS 16949 - International Automotive Quality Systems Standard 5 30th June 2003 09:11 AM



The time now is 04:11 AM. All times are GMT -4.
Your time zone can be changed in your UserCP --> Options.


   


Marc Timothy Smith - Elsmar.com
8466 LeSourdsville-West Chester Road, Olde West Chester, Ohio 45069-1929
513 341-6272
NOTE: This forum uses "cookies".