Right to the point: We have a supplier that stamps parts out of T Zero for us then he ships them to a heat treat to bring it up to T6. We call out a spec. of 60 +/- 10 RB. We do not deal with the the heat treater.
We received some parts in that are reading 46/47 RB, the heat treater is claiming that he cannot guaratee a 50 minimum? Can someone clear this up for me?
Why couldn't a 50 minumum be attainable?