The Elsmar Cove Wiki More Free Files The Elsmar Cove Forums Discussion Thread Index Post Attachments Listing Failure Modes Services and Solutions to Problems Elsmar cove Forums Main Page Elsmar Cove Home Page
Go Back   The Elsmar Cove Forum > Information Resources - Papers - Articles - Etc. > Definitions, Acronyms, Abbreviations and Interpretations
Forum Username

Elsmar Cove Forum Visitor Notice(s)


Search the Elsmar Cove
Custom Search
Monitor the Elsmar Forum
Follow Marc & Elsmar
Elsmar Cove Forum RSS Feed  Marc Smith's Google+ Page  Marc Smith's Linked In Page   Marc Smith's Elsmar Cove YouTube Page  Marc Smith's Facebook Page  Elsmar Cove Twitter Feed
Elsmar Cove Groups
Elsmar Cove Google+ Group  Elsmar Cove LinkedIn Group  Elsmar Cove Facebook Group
Sponsor Links





Donate and $ Contributor Forum Access

Courtesy Quick Links

Links that Elsmar Cove visitors will find useful in your quest for knowledge:

Howard's
International Quality Services
Marcelo Antunes'
SQR Consulting
Bob Doering's
Correct SPC - Precision Machining

NIST's Engineering Statistics Handbook
IRCA - International Register of Certified Auditors
SAE - Society of Automotive Engineers
Quality Digest Portal
IEST - Institute of Environmental Sciences and Technology
ASQ - American Society for Quality

Related Topic Tags
asme y14.100, critical characteristics, symbols (general)
Reply
 
Thread Tools Search this Thread Rate Thread Content Display Modes
  #1  
Old 26th May 1999, 08:35 PM
Marc's Avatar
Marc Marc is online now
Your Elsmar Cove Host

 
Registration Date: Jan 1996
Location: West Chester - Southern Ohio - USA
Age: 64
 
Posts: 24,117
Thanks Given to Others: 9,563
Thanked 5,222 Times in 3,308 Posts
Blog Entries: 4
Karma Power: 400
Karma: 32252
Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.
Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.
I Say... Critical Characteristic Symbol - ASME Y14.100 Standard (Engineering Drawing Practice)

--> Subject: DRAFTING STANDARD Date: Wed, 26 May 1999 12:41:42 -0400
--> From: dkaralash -- parker.com
--> To: Forum_Mail -- qs9000.com
-->
--> I'M LOOKING FOR INFORMATION ON A QS9000 DRAFTING STANDARD THAT
--> GOVERNS THE SYMBOL REPRESENTING A CRITICAL (GO, NO GO) TOLERANCE ON
--> A PART. THE STANDARD IS RELATED TO F.E.M.A. I WOULD APPRECIATE ANY
--> HELP YOU COULD GIVE ME ON THIS, AND WILL SUGGEST YOUR SIGHT TO MY
--> CO-WORKERS IN THE FUTURE.

There is no QS9000 'standard' critical characteristic symbol that I am aware of. Download the FMEA file in the pdf_files directory ( Elsmar Cove Free Files Directory ) and look around page 20 or so for some definitions of critical, safety and other characteristics. Also see Appendix C of QS-9000 for symbols and explainations.

Each company has it's own symbol for a critical characteristic. Ford, GM, Chrysler and probably your company. The requirement is that you recognize critical characteristics of your customers and that you identify them as appropriate in your business. If you get customer prints with critical characteristics and you 'translate' them to your 'format' and you use bowties as your symbol for a critical characteristic then those they marked should be marked with your 'bowtie' (or whatever). There is no standard which tells you any specific symbol that you must use nor is there any such requirement for a specific symbol.

[This message has been edited by Marc Smith (edited 26 May 1999).]

Sponsored Links
  #2  
Old 3rd November 2005, 04:52 AM
Wes Bucey's Avatar
Wes Bucey Wes Bucey is offline
Quality Manager

 
Registration Date: Sep 2003
Location: Illinois
 
Posts: 10,910
Thanks Given to Others: 517
Thanked 3,010 Times in 1,940 Posts
Karma Power: 1179
Karma: 21526
Wes Bucey is appreciated, and has over 1700 Karma points.Wes Bucey is appreciated, and has over 1700 Karma points.Wes Bucey is appreciated, and has over 1700 Karma points.
Wes Bucey is appreciated, and has over 1700 Karma points.Wes Bucey is appreciated, and has over 1700 Karma points.Wes Bucey is appreciated, and has over 1700 Karma points.Wes Bucey is appreciated, and has over 1700 Karma points.Wes Bucey is appreciated, and has over 1700 Karma points.Wes Bucey is appreciated, and has over 1700 Karma points.
Critical characteristic drawing symbols are merely a specific "flagnote symbol" which refers to a descriptive note on the drawing.

In general practice, the drawing notes will describe a flagnote symbol specific to that drawing. The flagnote symbol is then added to each characteristic on the drawing to which that specific note applies.

Marc is correct in writing that there is no universal flagnote symbol or descriptive note for the concept: "critical characteristic."

Organizations may devise a set of flagnote symbols and corresponding text for the note which ALL designers and draftspersons within the organization shall use in a consistent manner.

Obviously, organizations come in all sizes, ranging from one person to hundreds of thousands of people. Thus, outside entities may encounter a variety of symbols as well as a variety of specific texts or definitions contained in the note to which the symbol refers. The operative advice is to pay close attention to the drawing notes and be on the lookout for any flagnotes which may signal specific customer requirements.

In actual practice, good customers will make a point of calling attention to flagnote symbols which are important to them when negotiating a contract with a supplier. Alas, most customers are not "good," so the supplier must be very vigilant about such notes during the Contract Review process.

In my experience, there are times when stray symbols are present on some drawings WITHOUT the matching note. The use of a flagnote symbol without the corresponding note is most likely an error and a definite red flag there may be other errors in the drawing. Good practice for suppliers who encounter such stray symbols WITHOUT a corresponding note is to call them to the attention of the customer BEFORE continuing to interpret the drawing.

Most likely, the symbol is important, but the note was inadvertently omitted when the drawing was redrawn with CAD.

Second most likely, a previous revision level withdrew the note, but the checkers in the Configuration Management phase of the process neglected to remove the symbols from the drawing as well.

Least likely, an incompetent designer or draftsman made an assumption that "Everyone" knew what the symbol meant since it was so common in his own organization and purposely left out the corresponding note.

__________________

"Few minds wear out; more rust out"
Inscribed over the entrance of Louis Pasteur School, Chicago
Christian Nestell Bovee (1820-1904) in Thoughts, Feelings and Fancies, 1857
Sponsored Links

  #3  
Old 3rd November 2005, 06:29 AM
Marc's Avatar
Marc Marc is online now
Your Elsmar Cove Host

 
Registration Date: Jan 1996
Location: West Chester - Southern Ohio - USA
Age: 64
 
Posts: 24,117
Thanks Given to Others: 9,563
Thanked 5,222 Times in 3,308 Posts
Blog Entries: 4
Karma Power: 400
Karma: 32252
Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.
Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.Marc is appreciated, and has over 1700 Karma points.
Thanks for the details, Wes!

__________________

A Search is a terrible thing to waste!
One Test is Worth 1000 Expert Opinions - The plural of anecdote is not data - Correlation does not imply Causation
We can't solve problems by using the same kind of thinking we used when we created them. - Unknown
  #4  
Old 3rd November 2005, 07:27 AM
D.Scott's Avatar
D.Scott D.Scott is offline
Inactive Registered Visitor

 
Registration Date: Feb 2001
Location: Wellington, OH USA
Age: 74
 
Posts: 1,596
Thanks Given to Others: 80
Thanked 320 Times in 191 Posts
Karma Power: 222
Karma: 4257
D.Scott is appreciated, and has over 1700 Karma points.
D.Scott is appreciated, and has over 1700 Karma points.D.Scott is appreciated, and has over 1700 Karma points.D.Scott is appreciated, and has over 1700 Karma points.D.Scott is appreciated, and has over 1700 Karma points.D.Scott is appreciated, and has over 1700 Karma points.D.Scott is appreciated, and has over 1700 Karma points.D.Scott is appreciated, and has over 1700 Karma points.D.Scott is appreciated, and has over 1700 Karma points.D.Scott is appreciated, and has over 1700 Karma points.
Send a message via Yahoo to D.Scott
I have often seen just a symbol on the print to designate a "key" or "critical" characteristic requiring SPC. Sometimes the symbol is just rubber stamped on the print. There is, in many cases, no specific note explaining the symbol. Use of the symbol is explained in the customer specific requirements.

Dave

__________________

"Time you enjoyed wasting is not wasted time"
  #5  
Old 3rd November 2005, 10:51 AM
Wes Bucey's Avatar
Wes Bucey Wes Bucey is offline
Quality Manager

 
Registration Date: Sep 2003
Location: Illinois
 
Posts: 10,910
Thanks Given to Others: 517
Thanked 3,010 Times in 1,940 Posts
Karma Power: 1179
Karma: 21526
Wes Bucey is appreciated, and has over 1700 Karma points.Wes Bucey is appreciated, and has over 1700 Karma points.Wes Bucey is appreciated, and has over 1700 Karma points.
Wes Bucey is appreciated, and has over 1700 Karma points.Wes Bucey is appreciated, and has over 1700 Karma points.Wes Bucey is appreciated, and has over 1700 Karma points.Wes Bucey is appreciated, and has over 1700 Karma points.Wes Bucey is appreciated, and has over 1700 Karma points.Wes Bucey is appreciated, and has over 1700 Karma points.
Quote:
In Reply to Parent Post by D.Scott

I have often seen just a symbol on the print to designate a "key" or "critical" characteristic requiring SPC. Sometimes the symbol is just rubber stamped on the print. There is, in many cases, no specific note explaining the symbol. Use of the symbol is explained in the customer specific requirements.

Dave
Such a practice does not correspond with the ASME Y14.100 Standard (Engineering Drawing Practice) for the use of flagnotes. All notes are required to be on the drawing to which they refer (this can be expanded in that the note only needs to be on Sheet 1 of a multi-page bundle of drawings on one product or assembly, but that requires the bundle not be disassembled and the drawings considered separately.)

Thus if the drawing has a statement "conforms to ASME Y14.100" and does not contain the note explaining a flagnote symbol, it does not conform.

__________________

"Few minds wear out; more rust out"
Inscribed over the entrance of Louis Pasteur School, Chicago
Christian Nestell Bovee (1820-1904) in Thoughts, Feelings and Fancies, 1857
  #6  
Old 17th May 2013, 07:50 AM
Kathleen1's Avatar
Kathleen1 Kathleen1 is offline
Shy Poster (1 to 5 Posts)

 
Registration Date: Dec 2008
Location: Western MA
 
Posts: 4
Thanks Given to Others: 2
Thanked 0 Times in 0 Posts
Karma Power: 24
Karma: 10
Kathleen1 has less than 100 Karma points so far.
Please Help! Re: Critical Characteristic Symbol - ASME Y14.100 Standard (Engineering Drawing Pract

Is this answer still current- No industry standard for CTQ symbols?
I need to create an internal drafting standard for internal drawing creation and use- I was wondering if there is an industry standard for CTQ symbol?

I have multiple customers with varied symbols: Flag with CTQ, C within box or diamond, C w/line over top.
I did find ST hexagon symbol in ANSI Y14-but is it correct to use for this?

I must maintain/monitor data on inspection results for these characteristics.

My preference is leaning towards the CTQ within inside the Flag symbol.

Any information will be apreciated. Thanks in advance.
  #7  
Old 17th May 2013, 09:06 AM
Jim Wynne's Avatar
Jim Wynne Jim Wynne is offline
Cross Forum Moderator

 
Registration Date: Jan 2005
Location: Southeast Wisconsin
 
Posts: 14,077
Thanks Given to Others: 2,051
Thanked 5,991 Times in 3,819 Posts
Blog Entries: 2
Karma Power: 1530
Karma: 42492
Jim Wynne is appreciated, and has over 1700 Karma points.Jim Wynne is appreciated, and has over 1700 Karma points.Jim Wynne is appreciated, and has over 1700 Karma points.Jim Wynne is appreciated, and has over 1700 Karma points.Jim Wynne is appreciated, and has over 1700 Karma points.Jim Wynne is appreciated, and has over 1700 Karma points.
Jim Wynne is appreciated, and has over 1700 Karma points.Jim Wynne is appreciated, and has over 1700 Karma points.Jim Wynne is appreciated, and has over 1700 Karma points.Jim Wynne is appreciated, and has over 1700 Karma points.Jim Wynne is appreciated, and has over 1700 Karma points.
Re: Critical Characteristic Symbol - ASME Y14.100 Standard (Engineering Drawing Pract

There is no universal standard. As you've found, the symbols used vary from customer to customer. Recently in dealing with a new customer, I found that the symbols for Key Product Characteristics (KPCs) used on the drawings we receive are completely different from the ones they depict as standard in their supplier quality manual, so there might also be variation within individual companies.

You should, as far as possible, use the same symbols your customers use.

__________________

It is difficult to get a man to understand something, when his salary depends upon his not understanding it. --Upton Sinclair
Thanks to Jim Wynne for your informative Post and/or Attachment!
  #8  
Old 17th May 2013, 10:13 AM
Kathleen1's Avatar
Kathleen1 Kathleen1 is offline
Shy Poster (1 to 5 Posts)

 
Registration Date: Dec 2008
Location: Western MA
 
Posts: 4
Thanks Given to Others: 2
Thanked 0 Times in 0 Posts
Karma Power: 24
Karma: 10
Kathleen1 has less than 100 Karma points so far.
Re: Critical Characteristic Symbol - ASME Y14.100 Standard (Engineering Drawing Pract

Thank you Jim -for the information & suggestion-
Since industry has no standard-I believe I will decide to maintain 1 CTQ symbol for our drawings. (unless my customer spec's require use of theirs-currently none do)

I apreciate the suggestion, ...to match my customers' symbols- but there is problem with that application for us-..
*my drafting group will need to maintain & use the correct symbol for the applicable customer.
*my QA group will need to identify multiple symbols for data collection
Also, Some of our designs are used by different customers. I do not want to have to create multiple (same item) drawings just because of a (customer specific) symbol call out -maintaining this system would lead to potential document and data reporting nonconformances.
Reply

Lower Navigation Bar
Go Back   The Elsmar Cove Forum > Information Resources - Papers - Articles - Etc. > Definitions, Acronyms, Abbreviations and Interpretations

Do you find this discussion thread helpful and informational?


Bookmarks

Visitors Currently Viewing this Thread: 1 (0 Registered Visitors (Members) and 1 Unregistered Guest Visitors)
 
Thread Tools Search this Thread
Search this Thread:

Advanced Forum Search
Display Modes Rate Thread Content
Rate Thread Content:

Forum Posting Settings
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off


Similar Discussion Threads
Discussion Thread Title Thread Starter Forum Replies Last Post or Poll Vote
Dimensions Before or After Coating? Drawing states ASME Y14.100 and Y14.5 apply timmlaww3256 Inspection, Prints (Drawings), Testing, Sampling and Related Topics 7 29th October 2010 11:07 AM
ANSI-Y14.5M vs. ASME-Y14.5M - Does an ANSI-Y14.5M-1994 document actually exist? Micronus Various Other Specifications, Standards, and related Requirements 8 7th October 2009 11:05 AM
Your Critical Characteristic is my Minor Concern - Characteristic out of Spec Poohbear Inspection, Prints (Drawings), Testing, Sampling and Related Topics 3 19th July 2007 07:01 PM
ASME standard - Format for Drawing (Print) Title Block DocConPolice Various Other Specifications, Standards, and related Requirements 7 3rd November 2005 08:25 AM
Drawing Title Blocks - Control / Number them? Engineering Drawing Practices Y14.100M Bob_M Documentation Control Systems, Procedures, Forms and Templates 14 26th September 2003 02:41 PM



The time now is 05:58 PM. All times are GMT -4.
Your time zone can be changed in your UserCP --> Options.


   


Marc Timothy Smith - Elsmar.com
8466 LeSourdsville-West Chester Road, Olde West Chester, Ohio 45069-1929
513 341-6272