E
ElizabethAnne
Does anyone have a good understanding of the application of this?
In particular, 4.2.1 System Integrity makes demands of the integrity of the system. Is this asking for one-off design testing or on-going In-Process inspection?
In 4.2.1 b) it asks that the sytem shall withstand "a negative gauge pressure that is twice the recommended gauge pressure or one atmosphere of negative gauge pressure, whichever is smaller in absolute value". Is the latter not an absulute vacuum?
Any input appreciated.
Elizabeth Anne
In particular, 4.2.1 System Integrity makes demands of the integrity of the system. Is this asking for one-off design testing or on-going In-Process inspection?
In 4.2.1 b) it asks that the sytem shall withstand "a negative gauge pressure that is twice the recommended gauge pressure or one atmosphere of negative gauge pressure, whichever is smaller in absolute value". Is the latter not an absulute vacuum?
Any input appreciated.
Elizabeth Anne