The Elsmar Cove Wiki More Free Files The Elsmar Cove Forums Discussion Thread Index Post Attachments Listing Failure Modes Services and Solutions to Problems Elsmar cove Forums Main Page Elsmar Cove Home Page

Go Back   The Elsmar Cove Forum > Aerospace and Aviation Standards and Requirements > AS9100, Nadcap and related Aerospace Standards and Requirements
Forum Username


Elsmar Cove Forum Sidebar
Custom Search
Monitor the Elsmar Forum
Monitor New Forum Posts
Follow Marc & Elsmar
Elsmar Cove Forum RSS Feed  Marc Smith's Google+ Page  Marc Smith's Linked In Page   Marc Smith's Elsmar Cove YouTube Page  Marc Smith's Facebook Page
Elsmar Cove Groups
Elsmar Cove Google+ Group  Elsmar Cove LinkedIn Group  Elsmar Cove Facebook Group
Sponsor Links







Donate and $ Contributor Forum Access
Sponsored Links
Courtesy Quick Links

Links that Elsmar Cove visitors will find useful in your quest for knowledge:


Howard's
International Quality Services

Atul's
Symphony Technologies

Marcelo Antunes'
SQR Consulting

Bob Doering's
Correct SPC - Precision Machining


NIST's Engineering Statistics Handbook

IRCA - International Register of Certified Auditors

SAE - Society of Automotive Engineers

Quality Digest Portal

IEST - Institute of Environmental Sciences and Technology

ASQ - American Society for Quality


Related Topic Tags
7.5.1.2 - control of production process changes (as9100), as9100 - aerospace quality management systems, process changes and change notifications, processes (general)
Reply
 
Thread Tools Search this Thread Rate Thread Content Display Modes
  #1  
Old 26th July 2012, 01:46 PM
Boingo-boingo's Avatar
Boingo-boingo Boingo-boingo is offline
Fox is bad for US

 
Registration Date: Dec 2006
Location: N/A
 
Posts: 147
Thanks Given to Others: 14
Thanked 70 Times in 51 Posts
Karma Power: 43
Karma: 1253
Boingo-boingo is appreciated, and has over 1100 Karma points.Boingo-boingo is appreciated, and has over 1100 Karma points.Boingo-boingo is appreciated, and has over 1100 Karma points.Boingo-boingo is appreciated, and has over 1100 Karma points.Boingo-boingo is appreciated, and has over 1100 Karma points.Boingo-boingo is appreciated, and has over 1100 Karma points.Boingo-boingo is appreciated, and has over 1100 Karma points.Boingo-boingo is appreciated, and has over 1100 Karma points.Boingo-boingo is appreciated, and has over 1100 Karma points.
I Say... Example of Production Process Change having Significant Consequences AS9100C 7.5.1.2

http://www.aviationweek.com/Article....-01-479326.xml
Quote:
In all, 17 Trent 1000s are affected by the problem, which has been traced to a manufacturing flaw in the Hamilton Sundstrand-made transfer gearbox. “Hamilton Sundstrand changed the manufacturing process for some of the gears, and we identified that, through running of an endurance engine, [and] this caused unexpected corrosion. We started to examine it and saw it was to do with a modification in the manufacturing process,” the spokesman says.

The particular issue affected the crown gear assembly and was caused by a change in the chemical etching process used to make the part. The endurance engine, one of several units running alongside a “fleet leader” program engine to detect issues ahead of in-service discoveries, revealed the change could lead to pitting in the part and a reduced service life.
Thanks to Boingo-boingo for your informative Post and/or Attachment!

Sponsored Links
Reply

Lower Navigation Bar
Go Back   The Elsmar Cove Forum > Aerospace and Aviation Standards and Requirements > AS9100, Nadcap and related Aerospace Standards and Requirements

Do you find this discussion thread helpful and informational?


Bookmarks


Visitors Currently Viewing this Thread: 1 (0 Registered Visitors (Members) and 1 Unregistered Guest Visitors)
 
Thread Tools Search this Thread
Search this Thread:

Advanced Forum Search
Display Modes Rate Thread Content
Rate Thread Content:

Forum Posting Settings
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off


Similar Discussion Threads
Discussion Thread Title Thread Starter Forum Replies Last Post or Poll Vote
AS9100C for Multiple Production Department Goldstarr AS9100, Nadcap and related Aerospace Standards and Requirements 3 3rd July 2012 05:35 AM
AS9102 reference in AS9100C - Why the change? tkevmoore AS9100, Nadcap and related Aerospace Standards and Requirements 3 23rd September 2010 02:12 PM
Production rate demonstration? APQP Manual 4.1 – Significant Production Run Gilberto APQP and PPAP 7 30th July 2009 09:44 AM
PPAP Process Requirements-Significant Production Run Sarang APQP and PPAP 13 20th July 2009 08:52 PM
Significant environmental aspects for rubber printer roller production process Yasunari Kuo ISO 14001 and Environmental Related Standards 30 16th May 2007 01:16 PM



The time now is 03:54 AM. All times are GMT -4.
Your time zone can be changed in your UserCP --> Options.


   


Marc Timothy Smith - Elsmar.com
8466 LeSourdsville-West Chester Road, Olde West Chester, Ohio 45069-1929
513 341-6272