|
Elsmar Cove Forum Sidebar
|
|
|
|
Monitor the Elsmar Forum
|
| Monitor New Forum Posts
|
|
Follow Marc & Elsmar
|
|
|
Elsmar Cove Groups
|
|
|
Sponsor Links
|
|
|
|
|
|
Donate and $ Contributor Forum Access
|
 |
|
Sponsored Links
|
|
|
|
Courtesy Quick Links
|
 Links that Elsmar Cove visitors will find useful in your quest for knowledge:
Howard's International Quality Services
Atul's Symphony Technologies
Marcelo Antunes' SQR Consulting
Bob Doering's Correct SPC - Precision Machining
NIST's Engineering Statistics Handbook
IRCA - International Register of Certified Auditors
SAE - Society of Automotive Engineers
Quality Digest Portal
IEST - Institute of Environmental Sciences and Technology
ASQ - American Society for Quality
|
|
 |

28th May 2012, 09:05 PM
|
|
Shy Poster (1 to 5 Posts)
Registration Date: Jul 2011
|
|
Posts: 4
Thanks Given to Others: 4
Thanked 1 Time in 1 Post
Karma Power: 8 Karma: 15 
|
|
Calibration Requirements after Exceeding the Calibration Due Date
Hi all,
I dont know wether this thread already exist or not, cannot find it.
I am in charge of company's calibration lab.
I have a problem that required help from Elsmar Cove members. Within our composites manufacturing process, there is a process that need composites to be cured inside a pressurized oven (@300F++). this oven calibration interval is 30days (customer req.). now it is already exceeding due date at about 31days and it is allowable per our internal procedure (10% extension). calibration of this oven will expired on 31st May. actual expired date was 28th May. so, on 30th May 11.59:59pm and beyond, this oven no longer can be used (on paper). we will not allow them to start any cure after 12.00:00am 31st May.
my question (also asked by production team), IF composites cure start at 9.00pm on 30th May, and finish cure at about 3.00am 31st May, is that cure acceptable or not?
p/s:
1) Oven = Autoclave we called it here.
2) 10% extension = set by company, i dont quite agree with this number, can i revised it to 25% ?
|

28th May 2012, 09:30 PM
|
|
Appreciated Information Resource
Registration Date: Jan 2009
Location: india
|
|
Posts: 626
Thanks Given to Others: 93
Thanked 203 Times in 134 Posts
Karma Power: 82
|
|
Re: Calibration after exceeding the due date
Quote:
In Reply to Parent Post by azamiruddin
my question (also asked by production team), IF composites cure start at 9.00pm on 30th May, and finish cure at about 3.00am 31st May, is that cure acceptable or not?
|
speaking compliance-''wise'', one must not allow the cure to start at first; however,technically it could be done on ''deviation'' that, batch release will only happen after suitable verification measures of oven-performance as identified/commited steps (using additional probe such as ones used during calibration etc.,additional qc steps etc.,) suitable in deviation-approval.
Now same can be extended for processing multiple batches, depending on the equipment reliability, dependability of methods to verify the product&process performance, (some times we do subject such batches to additional performance studies ...) and risk there-off from any negative fall out such as product failure, customer complaints etc.,
but these practices actually dilute the systems, and has tendency to become a practice; + its not always easy to justify the deviations and does not ad value to aditional steps being implemented..
Quote:
In Reply to Parent Post by azamiruddin
2) 10% extension = set by company, i dont quite agree with this number, can i revised it to 25% ?
|
You will find other threads on similar topic (just at the end of page... see "similar threads")
However, it depends on the trends of calibration - failures - breakdowns - RCAs traceable to the performance of given equipment ... Which will determine the feasibility of revising the extension of grace period for re-calibration. (or frequency)
|

28th May 2012, 09:43 PM
|
 |
Forum Moderator
Registration Date: Jan 2004
Location: Maine, USA
|
|
Posts: 5,225
Thanks Given to Others: 3,017
Thanked 2,843 Times in 1,634 Posts
Karma Power: 615
|
|
|
Re: Calibration after exceeding the due date
I agree that knowing the gauge will fall out of compliance during the process, that gauge ought not be used at start of process. However, if your system allows it a deviation might (depends on customer, industry, standard etc.) be allowed so long as you can verify the product is, in fact conforming even though the gauge is out of calibration cycle.
__________________
"If you only have a hammer, you tend to see every problem as a nail." Abraham Maslow
|

28th May 2012, 11:52 PM
|
 |
Forum Administrator
Registration Date: Sep 2006
Location: Arlington,Texas
|
|
Posts: 5,367
Thanks Given to Others: 1,313
Thanked 1,835 Times in 1,238 Posts
Karma Power: 400
|
|
|
Re: Calibration after Exceeding the Due Date
You state that you have a customer requirement here.
Exactly what is the requirement?
__________________
Now, 75 years later in an abundant society where people have laptops, cell phones, iPods and minds like empty rooms, I still plod along with books. ”
—Harper Lee
|

29th May 2012, 12:21 AM
|
|
Shy Poster (1 to 5 Posts)
Registration Date: Jul 2011
|
|
Posts: 4
Thanks Given to Others: 4
Thanked 1 Time in 1 Post
Karma Power: 8 Karma: 15 
|
|
|
Re: Calibration after Exceeding the Due Date
Thank you for the response.
Quote:
In Reply to Parent Post by BradM
You state that you have a customer requirement here.
Exactly what is the requirement?
|
Brad, my end-customer is Boeing, they require us to perform 30 days calibration interval on all machines that perform temperature & pressure composites cure cycle. This figure quite tight for us due to manpower and calibrator (comparator) limitation.
|

29th May 2012, 09:30 AM
|
 |
Forum Administrator
Registration Date: Sep 2006
Location: Arlington,Texas
|
|
Posts: 5,367
Thanks Given to Others: 1,313
Thanked 1,835 Times in 1,238 Posts
Karma Power: 400
|
|
|
Re: Calibration after Exceeding the Due Date
Quote:
In Reply to Parent Post by azamiruddin
Thank you for the response.
Brad, my end-customer is Boeing, they require us to perform 30 days calibration interval on all machines that perform temperature & pressure composites cure cycle. This figure quite tight for us due to manpower and calibrator (comparator) limitation.
|
Well, the reason I ask is that you are kind of bound by customer requirements. Unless, you have an exception in the purchase order or something. Otherwise, anything past 30 days is past due.
I would think that given successful calibration events and if you have monitoring/ recording equipment that could be relaxed. Otherwise I would charge them more.
__________________
Now, 75 years later in an abundant society where people have laptops, cell phones, iPods and minds like empty rooms, I still plod along with books. ”
—Harper Lee
|

30th May 2012, 03:22 PM
|
|
Involved in Discussions
Registration Date: May 2009
Location: CA, USA
|
|
Posts: 24
Thanks Given to Others: 15
Thanked 6 Times in 6 Posts
Karma Power: 19 Karma: 40 
|
|
|
Re: Calibration Requirements after Exceeding the Calibration Due Date
Calibration schedules are a risk management tool. Expanding by 25% may increase your risk but you need to know how much product is measured with the tool. If the tool is used infrequently and low volume of product then your risk is lower.
My experience with Boeing is that compliance to the schedule is important. If calibration schedule conflicts with delivery schedule, I would request a waiver from them explaining the delivery impact.
|

20th June 2012, 01:51 AM
|
|
Involved in Discussions
Registration Date: May 2012
|
|
Posts: 16
Thanks Given to Others: 2
Thanked 4 Times in 3 Posts
Karma Power: 6 Karma: 30 
|
|
|
Re: Calibration Requirements after Exceeding the Calibration Due Date
as usual, perform an experiment and study data to back up whatever decision made i.e extension of calibration interval.
as the owner of the equipment, it is always good practice to convince yourself the equipment is indeed performing what it is designated to do before convincing others.. hehe
2 cents
|
Lower Navigation Bar
|
|
|
Do you find this discussion thread helpful and informational?
|
Visitors Currently Viewing this Thread: 1 (0 Registered Visitors (Members) and 1 Unregistered Guest Visitors)
|
|
|
| Thread Tools |
Search this Thread |
|
|
|
| Display Modes |
Rate Thread Content |
Linear Mode
|
|
Forum Posting Settings
|
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts
HTML code is Off
|
|
|
|
|