The Elsmar Cove Forum and Site Map The Elsmar Cove Wiki More Free Files The Elsmar Cove Forums Discussion Thread Index Post Attachments Listing Failure Modes Services and Solutions to Problems Elsmar cove Forums Main Page Elsmar Cove Home Page

Go Back   The Elsmar Cove Forum > Common Quality Assurance Processes and Tools > Capability, Accuracy and Stability - Process, Machine, etc.


The Elsmar Cove Forum SideBar!
Monitor the Forum
Monitor New Forum Posts
New Threads Feeds
RSS FeedRSS Feed
Sponsor Link










$ Contributor Forum Access
Courtesy Quick Links

Links that Elsmar Cove visitors will find useful in your quest for knowledge:


Howard's International Quality Services

Atul's Symphony Technologies

Dave Scott's Scott Quality Solutions

Praxiom Research Group


NIST's Engineering Statistics Handbook

IRCA - International Register of Certified Auditors

SAE - Society of Automotive Engineers

Quality Digest Portal

IEST - Institute of Environmental Sciences and Technology

ASQ - American Society for Quality


All the Important Standards and Related Web Sites in the World
Reply
 
Thread Tools Search this Thread Rate Thread Content Display Modes
  #1  
Old 8th November 2004, 08:11 AM
ysdennis ysdennis is offline
Inactive Registered Visitor

Registration Date: Nov 2003
Location: Taiwan
 
Posts: 8
Thanks Given to Others: 0
Thanked 0 Times in 0 Posts
Karma Power: 25
ysdennis has disabled his/her Karma.
Default Which should be decided first : Cpk or all equipment/technician GRR

Dear All,
Recently my customer required my company to perform all equipment/technician GRR first in order to ensure whole measurement system is stable as well as their products.In my opinion,once if Cpk is high enough we could tell gaging variation is far from affecting total variation and their products won't be misjudged. I am not very sure if I am right or not.
If I am right,how do I persuade my customer?It seems they don't accept at all but can't raise any theoretical viewpoints.
If I am wrong,please kindly advise me your correction.
Reply With Quote

Sponsored Links
  #2  
Old 8th November 2004, 08:35 AM
Jonell Jonell is offline
Involved - Posts

Registration Date: Apr 2003
Location: USA
 
Posts: 102
Thanks Given to Others: 0
Thanked 7 Times in 3 Posts
Karma Power: 30
Karma: 76
Jonell has less than 100 Karma points so far.
Default CPK & Gage R&R, two different things?

While I understand your point of view, please keep in mind that process variation and gage variation are two different things. Cpk measures how stable the process is, while a gage R&R measures how reliable the gage is throwing in the variable of using different operators. IMO, It is quite possible to have a great Cpk, while at the same time having a lousy gage R & R, say perhaps because of a poor gage design. I think that what your customer is asking for is reasonable.

What does everyone else think?

Jonell
Reply With Quote
Sponsored Links

  #3  
Old 8th November 2004, 09:00 AM
ysdennis ysdennis is offline
Inactive Registered Visitor

Registration Date: Nov 2003
Location: Taiwan
 
Posts: 8
Thanks Given to Others: 0
Thanked 0 Times in 0 Posts
Karma Power: 25
ysdennis has disabled his/her Karma.
Default If time is limitted, could we use Cpk as a priority screen to de

Hi Jonell
Appreciate a lot for your response.
I agree with most of your of viewpoints,except gage variation and process variation are two different things. As far as I was concerned,the latter contains the former.
Maybe I should correct my title : If time is limitted(actually always is) , could we use Cpk as a priority screen to decide which equipment should implement GRR first?
Reply With Quote
  #4  
Old 8th November 2004, 11:39 AM
wmarhel wmarhel is offline
Courtesy Access

Registration Date: Oct 2004
Location: DuBois, PA
Age: 39
 
Posts: 612
Thanks Given to Others: 109
Thanked 234 Times in 149 Posts
Karma Power: 94
Karma: 3086
wmarhel is appreciated, and has over 1700 Karma points.
wmarhel is appreciated, and has over 1700 Karma points.
Default

Quote:
Originally Posted by ysdennis

Hi Jonell
I agree with most of your of viewpoints,except gage variation and process variation are two different things. As far as I was concerned,the latter contains the former.
Maybe I should correct my title : If time is limitted(actually always is) , could we use Cpk as a priority screen to decide which equipment should implement GRR first?
I agree with Jonell regarding his comments that gage and process variation are different.

Keep in mind that the purpose of a Gage R&R is twofold, to determine the variability of the gage itself or the manner in which the gage is being used to take a specific measurement, and the variability due to the operators technique, or lack of technique in some cases.

I have always been of the opinion that unless the measurement method has been validated, than the data being received is suspect. Your first post you made the comment, "if Cpk is high enough we could tell gaging variation is far from affecting total variation and their products won't be misjudged." One possibility is that the Cpk is high because of measurement error. There are a couple of reasons that this belief is untrustworthy:

1) There isn't enough resolution in the measuring device so that measurement itself tends to group the data (i.e., if my range is 0.010 to to 0.030 and my device only reads two decimal places, I can end up with a lot of 0.020's when in reality I should be getting 0.014 or 0.016).

2) The measuring device isn't reading accurately over its entire scale. In this case I'm reading 0.020 on the device, but in reality I'm getting 0.012. Perhaps the gage has fallen out of calibration, perhaps an internal component is wearing out, etc.

3) The operator is consistent, they just aren't very accurate. Similar to item #2, its just that the operator is consistently producing readings which are 0.010 from what the actual measurement should be.

Gage R&R is also a method to determine and verify the ability of your operators, not just the method or device. Perhaps this is why your customer is requesting the studies. They want to be sure that the people producing their product are adequately trained.

What I would probably look at is which products/lines have the highest rates of defects. Because your customer is demanding this, it may also be of benefit to sit down with them and both of you come up with a priority list. Also be sure to identify which method (x-bar/r or ANOVA) to use. In this manner you satisfy their greatest concerns first, and they see you as being proactive.

That's my 2 cents worth......

Regards,

Wayne

Last edited by wmarhel; 10th November 2004 at 09:46 PM.
Reply With Quote
  #5  
Old 8th November 2004, 03:00 PM
Bill Ryan's Avatar
Bill Ryan Bill Ryan is offline
Dogs rule

Registration Date: Jul 2002
Location: Madison, WI
Age: 56
 
Posts: 980
Thanks Given to Others: 15
Thanked 23 Times in 16 Posts
Karma Power: 69
Karma: 1002
Bill Ryan is appreciated, and has over 900 Karma points.Bill Ryan is appreciated, and has over 900 Karma points.Bill Ryan is appreciated, and has over 900 Karma points.Bill Ryan is appreciated, and has over 900 Karma points.Bill Ryan is appreciated, and has over 900 Karma points.Bill Ryan is appreciated, and has over 900 Karma points.Bill Ryan is appreciated, and has over 900 Karma points.Bill Ryan is appreciated, and has over 900 Karma points.
Default

Welcome to the Cove ysdennis and Wayne

Wayne: Nice response. I agree that without knowing the R&R of a gage (along with linearity and bias) there shouldn't be much faith put in the capability study results.

ysdennis: Do you have Minitab or some other type of software that will calculate your "number of distinct categories"? AIAG recommends greater than 5 categories. That number will, basically, tell you whether you have enough resolution.
__________________
There is no psychiatrist in the world like a puppy licking your face. - Ben Williams
Reply With Quote
  #6  
Old 10th November 2004, 02:02 AM
ysdennis ysdennis is offline
Inactive Registered Visitor

Registration Date: Nov 2003
Location: Taiwan
 
Posts: 8
Thanks Given to Others: 0
Thanked 0 Times in 0 Posts
Karma Power: 25
ysdennis has disabled his/her Karma.
Default

Dear All,
Thanks for all your support and instructions.
I learned a lot form you all. Now I know how to discuss with my customers and give them more understandings.
Reply With Quote
  #7  
Old 10th November 2004, 11:10 AM
qualitytrec's Avatar
qualitytrec qualitytrec is offline
Father of 8!!

Registration Date: Jan 2003
Location: Salt Lake City, Utah
Age: 38
 
Posts: 369
Thanks Given to Others: 26
Thanked 27 Times in 20 Posts
Karma Power: 44
Karma: 464
qualitytrec is appreciated, and has over 400 Karma points.qualitytrec is appreciated, and has over 400 Karma points.qualitytrec is appreciated, and has over 400 Karma points.qualitytrec is appreciated, and has over 400 Karma points.qualitytrec is appreciated, and has over 400 Karma points.
Default whoa! are you sure you understood what was written here?

My understanding is that you have to qualify your gages before you use them. This is to ensure that they are telling you what you need to know consistantly and accurately. If you do not know your gages are accurrate, repeatable and right with reproducible results how can you know that your process is really running where your gage says it is. it could be throwing skew or any number of other issues into your system and you would be blind to it. Calibration and GR&R are the ways you protect against these issues. You have to qualify the gages and operators before you use them to track capability.
What types of gages are you using and for what type of product?

Mark

Wayne, good explaination.

Last edited by qualitytrec; 10th November 2004 at 03:02 PM.
Reply With Quote
  #8  
Old 15th November 2004, 01:02 AM
ysdennis ysdennis is offline
Inactive Registered Visitor

Registration Date: Nov 2003
Location: Taiwan
 
Posts: 8
Thanks Given to Others: 0
Thanked 0 Times in 0 Posts
Karma Power: 25
ysdennis has disabled his/her Karma.
Default

Thanks for your comments. Actually, I read what indicated in an article here in my country. I have ever used Minitab to implement GRR. But I didn’t really understand how poor resolution and device inaccuracy made good Cpk and poor GRR ,until Wayne’s detailed explanation. About gage types ,some are almost “automatic” except load/unload steps. This reminds me another question that “If measuring device is automatic, does it mean there’s no need to evaluate reproducibility?”
Reply With Quote
Reply

Lower Navigation Bar
Go Back   The Elsmar Cove Forum > Common Quality Assurance Processes and Tools > Capability, Accuracy and Stability - Process, Machine, etc.

Bookmarks


Visitors Currently Viewing this Thread: 1 (0 Registered Visitors and 1 Unregistered Guests)
 
Thread Tools Search this Thread
Search this Thread:

Advanced Forum Search
Display Modes Rate Thread Content
Rate Thread Content:

Posting Settings
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump

Similar Discussion Threads
Discussion Thread Title Thread Starter Forum Replies Last Post or Poll Vote
% Gage R&R Calculation - 100x(GRR/ (Spec/6)) or 100x(GRR/TV) tenaiwa Gage R&R (GR&R) and MSA (Measurement Systems Analysis) 20 26th February 2009 09:18 AM
Effect of %GRR (% Gage R&R) on Cpk ABS Gage R&R (GR&R) and MSA (Measurement Systems Analysis) 13 23rd October 2008 04:48 PM
Gage R&R Related Terms - EV, %EV, AV, %AV, GRR, %GRR, PV, %PV, TV, and P/T Ratio orion Gage R&R (GR&R) and MSA (Measurement Systems Analysis) 5 23rd April 2004 01:12 PM
Cpk and Ppk calculations for QS-9000 TE (Tooling and Equipment) Requirements mibusha Capability, Accuracy and Stability - Process, Machine, etc. 7 21st July 2000 05:29 PM



The time now is 09:00 PM. All times are GMT -4.
The time zone can be changed in your UserCP --> Options.



   

All Y'All Come Back Now, Y' Hear?

Made With A Mac! FreeBSD OS Powered by Apache!
Using php4 Forums provided and maintained by Marc Smith Database by MySQL

FAIR USE and CORRECTNESS NOTICE: This site contains copyrighted material the use of which has not always been specifically authorized by the copyright owner. We are making such material available in our efforts to advance understanding of environmental, political, human rights, economic, democracy, scientific, and social justice issues, etc. We believe herein constitutes a 'fair use' of any such copyrighted material as provided for in section 107 of the US Copyright Law. In accordance with Title 17 U.S.C. Section 107, the material on this site is distributed without profit to those who have expressed a prior interest in receiving the included information for research and educational purposes. For more information go to: http://www.law.cornell.edu/uscode/17/ If you wish to use copyrighted material from this site for purposes of your own that go beyond 'fair use', you must obtain permission from the copyright owner. In addition, I do not guarantee the correctness of the content. The risk of using content from the Elsmar Cove web site and forums remains with the user/visitor.

Responsibility Statement: Each person is responsible for anything they post in the Elsmar Cove forum. Neither I, Marc Timothy Smith, nor any of the forum Moderators, are responsible for the content of posts people make. Liability for post content resides with the poster as does interpretation and/or acceptance and/or use of advice by the reader.

Complaints: If you have a complaint with a post in a forum discussion thread, including Content in general, fighting, flaming, copyright infringement, defamation and/or 'slander', please use the 'Report This Post Report This Post Button button which appears at the top of every post in every thread.

Site courtesy of:
Marc Timothy Smith - Cayman Business Systems, 8466 Lesourdsville-West Chester Road, West Chester, Ohio 45069-1929 - USA
(513) 341-6272

To contact me, click the Google Voice link below, enter Your Name and Your Phone Number and Google will ring your phone and connect you for free!

The Elsmar Cove Web Site is *CopyFree*
no new posts