The Elsmar Cove Forum and Site Map The Elsmar Cove Wiki More Free Files The Elsmar Cove Forums Discussion Thread Index Post Attachments Listing Failure Modes Services and Solutions to Problems Elsmar cove Forums Main Page Elsmar Cove Home Page

Go Back   The Elsmar Cove Forum > Common Quality Assurance Processes and Tools > Capability, Accuracy and Stability - Process, Machine, etc.


The Elsmar Cove Forum SideBar!
Monitor the Forum
Monitor New Forum Posts
New Threads Feeds
RSS FeedRSS Feed
Sponsor Link










$ Contributor Forum Access
Courtesy Quick Links

Links that Elsmar Cove visitors will find useful in your quest for knowledge:


Howard's International Quality Services

Atul's Symphony Technologies

Dave Scott's Scott Quality Solutions

Praxiom Research Group


NIST's Engineering Statistics Handbook

IRCA - International Register of Certified Auditors

SAE - Society of Automotive Engineers

Quality Digest Portal

IEST - Institute of Environmental Sciences and Technology

ASQ - American Society for Quality


All the Important Standards and Related Web Sites in the World
Reply
 
Thread Tools Search this Thread Rate Thread Content Display Modes
  #1  
Old 20th November 2004, 06:08 AM
Joe_winter Joe_winter is offline
Inactive Registered Visitor

Registration Date: Nov 2004
Location: Singapore
Age: 34
 
Posts: 18
Thanks Given to Others: 0
Thanked 0 Times in 0 Posts
Karma Power: 21
Karma: 10
Joe_winter has less than 100 Karma points so far.
Send a message via MSN to Joe_winter
Let Me Help You Ppk - Seeking short-term study examples - Chronically unstable processes

As no R&D, ppap is necessary in our inc.But where chronically unstable processes in ppap manual I.2.2.9.2? We just offer cpk over time and never ppk for short-term studies, and I can not find one example. Pls help me!
Reply With Quote

Sponsored Links
  #2  
Old 20th November 2004, 09:55 AM
Al Dyer's Avatar
Al Dyer Al Dyer is offline
Mod...

Registration Date: Mar 2003
Location: Oregon, MI
Age: 51
 
Posts: 577
Thanks Given to Others: 4
Thanked 10 Times in 10 Posts
Karma Power: 46
Karma: 398
Al Dyer is appreciated, and has over 300 Karma points.Al Dyer is appreciated, and has over 300 Karma points.Al Dyer is appreciated, and has over 300 Karma points.Al Dyer is appreciated, and has over 300 Karma points.
Send a message via AIM to Al Dyer
Default

Welcome!


What exactly are you looking for in an example?
Al...
__________________
"Para ... Bellum"
Reply With Quote
Sponsored Links

  #3  
Old 21st November 2004, 01:09 AM
Joe_winter Joe_winter is offline
Inactive Registered Visitor

Registration Date: Nov 2004
Location: Singapore
Age: 34
 
Posts: 18
Thanks Given to Others: 0
Thanked 0 Times in 0 Posts
Karma Power: 21
Karma: 10
Joe_winter has less than 100 Karma points so far.
Send a message via MSN to Joe_winter
Default

Yeah!!! Here I am freshman. one week ago, a new customer came touring, he asked for ppk studies for his future product, and I am the QC responsible for it, confused by ppk requirement. c/p pk value, ofcourse, they are facilitated. btw,the product is clocked-timer,to UL917.
Joe

Last edited by Joe_winter; 21st November 2004 at 02:14 AM.
Reply With Quote
  #4  
Old 21st November 2004, 08:52 AM
Wes Bucey's Avatar
Wes Bucey Wes Bucey is offline
Quality Manager

Registration Date: Sep 2003
Location: Illinois
 
Posts: 7,534
Thanks Given to Others: 182
Thanked 1,127 Times in 762 Posts
Karma Power: 397
Karma: 11090
Wes Bucey is appreciated, and has over 1700 Karma points.Wes Bucey is appreciated, and has over 1700 Karma points.Wes Bucey is appreciated, and has over 1700 Karma points.
Wes Bucey is appreciated, and has over 1700 Karma points.Wes Bucey is appreciated, and has over 1700 Karma points.Wes Bucey is appreciated, and has over 1700 Karma points.Wes Bucey is appreciated, and has over 1700 Karma points.Wes Bucey is appreciated, and has over 1700 Karma points.Wes Bucey is appreciated, and has over 1700 Karma points.Wes Bucey is appreciated, and has over 1700 Karma points.Wes Bucey is appreciated, and has over 1700 Karma points.Wes Bucey is appreciated, and has over 1700 Karma points.Wes Bucey is appreciated, and has over 1700 Karma points.Wes Bucey is appreciated, and has over 1700 Karma points.Wes Bucey is appreciated, and has over 1700 Karma points.
Default

Quote:
Originally Posted by Joe_winter

Yeah!!! Here I am freshman. one week ago, a new customer came touring, he asked for ppk studies for his future product, and I am the QC responsible for it, confused by ppk requirement. c/p pk value, ofcourse, they are facilitated. btw,the product is clocked-timer, to UL917.
Joe
Welcome to the Cove, Joe

In order for us to help you, we need a little more detail about your situation.
It's still the weekend in Europe and America, where most of our Covers work, so you may not get answers for almost 24 hours from the time I write this post.

Please tell us
  • more about the product you make (clocked-timer, to UL917)
  • if it is custom made to the customer's specifications
  • if it is a product designed by your organization and sold to more than one customer
  • the quantity per hour or shift or day
  • whether the customer has outlined "critical characteristics" for his product
  • whether there are critical characteristics your own organization has identified which will affect fit or function of the product
  • if there are "process critical" characteristics which can be noted during production which will indicate whether there may be a problem with the finished product (for in-process inspection purposes)
I note in another thread you talk about a "family of parts" - are you talking about that same "family of parts" in this thread? Tell us what differentiates one member of the family from another (size? color? etc.?)

Quote:
UL 917

STANDARD FOR SAFETY FOR CLOCK-OPERATED SWITCHES
Scope
These requirements cover clock-operated switches rated 600 V or less, to be used in ordinary locations designed to close and open circuits to a load at predetermined intervals, and intended to be employed in accordance with the National Electrical Code, ANSI/NFPA 70.

These requirements cover only clock-operated switches in which the switching contacts are actuated by a clock-work, by a gear-train, by hand, by electrically-wound spring motors, by electric clock-type motors, or by equivalent arrangements. In addition to closing and opening the switching contacts, the devices may also indicate the time of day or time interval.

These requirements do not cover devices incorporating electronic timing circuits or switching circuits without separable contacts.

A clock-operated switch, which is incomplete in construction features or restricted in performance capabilities, is acceptable for use as a factory-installed component provided that the restrictions established for the component are eliminated when the component is installed.

Specific provisions are included in these requirements for TV rated clock-operated switches. A product that contains features, characteristics, components, materials, or systems new or different from those in use when the Standard was developed, and that involves a risk of fire, electric shock, or injury to persons, shall be evaluated using the appropriate additional component and end-product requirements as determined necessary to maintain the level of safety for the user of the product as originally anticipated by the intent of this Standard.
__________________
"Few minds wear out; more rust out"
Inscribed over the entrance of Louis Pasteur School, Chicago
Christian Nestell Bovee (1820-1904) in Thoughts, Feelings and Fancies, 1857
Reply With Quote
  #5  
Old 21st November 2004, 09:43 AM
Joe_winter Joe_winter is offline
Inactive Registered Visitor

Registration Date: Nov 2004
Location: Singapore
Age: 34
 
Posts: 18
Thanks Given to Others: 0
Thanked 0 Times in 0 Posts
Karma Power: 21
Karma: 10
Joe_winter has less than 100 Karma points so far.
Send a message via MSN to Joe_winter
Default

Thanks, Wes!
about the product :
1-being a new one, never done before.
2-run is also via spring motor, components plastic, e.g. small gears, and hardwares, e.g. springs, axes, materials include AL,plastic,stainless steel,etc.
the processes include injection, punching, assembling.
3-I just feel confused about where ppk for short-term is, an example is hoped to ****.
4-As new product, how to know whether stable ro not??no historics data would be utilized? just by the other similar procucts, or just rule of thumb?

I am in a plight.Shed some light!!
Reply With Quote
  #6  
Old 23rd November 2004, 05:56 AM
Howard Atkins's Avatar
Howard Atkins Howard Atkins is offline
Forum Administrator

Registration Date: Jul 1997
Location: Revivim, Israel
 
Posts: 2,412
Thanks Given to Others: 100
Thanked 448 Times in 253 Posts
Blog Entries: 8
Karma Power: 195
Karma: 4817
Howard Atkins is appreciated, and has over 1700 Karma points.
Howard Atkins is appreciated, and has over 1700 Karma points.Howard Atkins is appreciated, and has over 1700 Karma points.Howard Atkins is appreciated, and has over 1700 Karma points.Howard Atkins is appreciated, and has over 1700 Karma points.Howard Atkins is appreciated, and has over 1700 Karma points.Howard Atkins is appreciated, and has over 1700 Karma points.Howard Atkins is appreciated, and has over 1700 Karma points.Howard Atkins is appreciated, and has over 1700 Karma points.Howard Atkins is appreciated, and has over 1700 Karma points.Howard Atkins is appreciated, and has over 1700 Karma points.Howard Atkins is appreciated, and has over 1700 Karma points.Howard Atkins is appreciated, and has over 1700 Karma points.
Send a message via Skype™ to Howard Atkins
Default

If I understand the customer wants a PPK study to see the capabability for a new process.
This is standard and the PPAP manual gives the alternatives depending on the stage of production.
In the initila stage if you have only run some 300 parts then the PPK is what you need.
In general there is a looseness of speech in this area and people say CPK instead of PPK and the opposite.
In fact the PPK gives you some important information as to where you are at the beginnig.
I hope this helps.
__________________
You can’t fake quality any more than you can fake a good meal.
* William S. Burroughs
Reply With Quote
  #7  
Old 23rd November 2004, 07:02 AM
remsqa remsqa is offline
Involved - Posts

Registration Date: Dec 2003
Location: CHENNAI
Age: 29
 
Posts: 40
Thanks Given to Others: 1
Thanked 0 Times in 0 Posts
Karma Power: 25
Karma: 10
remsqa has less than 100 Karma points so far.
Send a message via Yahoo to remsqa
Thumbs up PPAP ppk

Hai Joe

God to see in another thread,The ppk is done for the Charactertics in which the same required control and the same should be measurable.

The short and long time are the confusing part of Quality world don't got in to that.

Ex Short term: IF the customer requirement is 1.67 ppk & CPK. Is your process is getting only 1.33 then your short term willbe achive immediately 1.67 .

Ex Long term : IF your co is a sixsigma Co then you should get 2.00cpk to operate in 50% of tolerance Then your long term is to get the process to perform the cpk more than 2.00 .

Expecting all your mails.and feedback.


REGARDS

R.L.SATTHISH KUMAR
Reply With Quote
  #8  
Old 24th November 2004, 05:54 AM
Joe_winter Joe_winter is offline
Inactive Registered Visitor

Registration Date: Nov 2004
Location: Singapore
Age: 34
 
Posts: 18
Thanks Given to Others: 0
Thanked 0 Times in 0 Posts
Karma Power: 21
Karma: 10
Joe_winter has less than 100 Karma points so far.
Send a message via MSN to Joe_winter
Default Appreciate your opinions!

Thanks remsqa as well as Howard!

Howard, your 'looseness of speech' greatly illumines me. sometimes, there are actually difficults to separate where ppk or cpk, as routine processes cpk are adequate, otherwise ppk will get more risks to be attained although it would provide your more informations important.
Don't got in long/short term? that is good idea,but I would have to face requirements from my customers. and my co. is not 6sigma without R&D, that is a small one, the usual reqest is cpk, except the recent ppk from a new customer.
Reply With Quote
Reply

Lower Navigation Bar
Go Back   The Elsmar Cove Forum > Common Quality Assurance Processes and Tools > Capability, Accuracy and Stability - Process, Machine, etc.

Bookmarks


Visitors Currently Viewing this Thread: 1 (0 Registered Visitors and 1 Unregistered Guests)
 
Thread Tools Search this Thread
Search this Thread:

Advanced Forum Search
Display Modes Rate Thread Content
Rate Thread Content:

Posting Settings
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump

Similar Discussion Threads
Discussion Thread Title Thread Starter Forum Replies Last Post or Poll Vote
Does a Chronically Unstable Process need a Capability Analysis? cyberjyothi SPC Monitoring and Statistical Analysis Techniques 10 20th February 2007 08:53 AM
Cp/Cpk vs Pp/Ppk (Short term using population sigma) - Formulas to use? LoudRed Capability, Accuracy and Stability - Process, Machine, etc. 21 24th April 2006 09:13 AM
Cpk vs. Ppk - Long Term vs. Short Term - Capability vs. Stability DJN Capability, Accuracy and Stability - Process, Machine, etc. 25 15th March 2006 01:26 AM
Evaluating Process Stability - Unstable Processes - Cpk/Ppk? niotusen Capability, Accuracy and Stability - Process, Machine, etc. 6 31st January 2005 03:58 PM
Capability: Short Term or Long Term? Cpk= Long term and Ppk= Short term? Andrews Capability, Accuracy and Stability - Process, Machine, etc. 15 22nd January 2004 04:28 PM



The time now is 08:31 PM. All times are GMT -4.
The time zone can be changed in your UserCP --> Options.



   

All Y'All Come Back Now, Y' Hear?

Made With A Mac! FreeBSD OS Powered by Apache!
Using php4 Forums provided and maintained by Marc Smith Database by MySQL

FAIR USE and CORRECTNESS NOTICE: This site contains copyrighted material the use of which has not always been specifically authorized by the copyright owner. We are making such material available in our efforts to advance understanding of environmental, political, human rights, economic, democracy, scientific, and social justice issues, etc. We believe herein constitutes a 'fair use' of any such copyrighted material as provided for in section 107 of the US Copyright Law. In accordance with Title 17 U.S.C. Section 107, the material on this site is distributed without profit to those who have expressed a prior interest in receiving the included information for research and educational purposes. For more information go to: http://www.law.cornell.edu/uscode/17/ If you wish to use copyrighted material from this site for purposes of your own that go beyond 'fair use', you must obtain permission from the copyright owner. In addition, I do not guarantee the correctness of the content. The risk of using content from the Elsmar Cove web site and forums remains with the user/visitor.

Responsibility Statement: Each person is responsible for anything they post in the Elsmar Cove forum. Neither I, Marc Timothy Smith, nor any of the forum Moderators, are responsible for the content of posts people make. Liability for post content resides with the poster as does interpretation and/or acceptance and/or use of advice by the reader.

Complaints: If you have a complaint with a post in a forum discussion thread, including Content in general, fighting, flaming, copyright infringement, defamation and/or 'slander', please use the 'Report This Post Report This Post Button button which appears at the top of every post in every thread.

Site courtesy of:
Marc Timothy Smith - Cayman Business Systems, 8466 Lesourdsville-West Chester Road, West Chester, Ohio 45069-1929 - USA
(513) 341-6272

To contact me, click the Google Voice link below, enter Your Name and Your Phone Number and Google will ring your phone and connect you for free!

The Elsmar Cove Web Site is *CopyFree*
no new posts