The Elsmar Cove Forum and Site Map The Elsmar Cove Wiki More Free Files The Elsmar Cove Forums Discussion Thread Index Post Attachments Listing Failure Modes Services and Solutions to Problems Elsmar cove Forums Main Page Elsmar Cove Home Page

Go Back   The Elsmar Cove Forum > Aerospace and Aviation Requirements > AS9100 Aerospace Standard and Requirements


The Elsmar Cove Forum SideBar!
Monitor the Forum
Monitor New Forum Posts
New Threads Feeds
RSS FeedRSS Feed
Sponsor Link










$ Contributor Forum Access
Courtesy Quick Links

Links that Elsmar Cove visitors will find useful in your quest for knowledge:


Howard's International Quality Services

Atul's Symphony Technologies

Dave Scott's Scott Quality Solutions

Praxiom Research Group


NIST's Engineering Statistics Handbook

IRCA - International Register of Certified Auditors

SAE - Society of Automotive Engineers

Quality Digest Portal

IEST - Institute of Environmental Sciences and Technology

ASQ - American Society for Quality


All the Important Standards and Related Web Sites in the World
Reply
 
Thread Tools Search this Thread Rate Thread Content Display Modes
  #1  
Old 18th January 2005, 12:39 PM
LukeT's Avatar
LukeT LukeT is offline
Inactive Registered Visitor

Registration Date: Aug 2004
Location: Wisconsin
 
Posts: 11
Thanks Given to Others: 0
Thanked 0 Times in 0 Posts
Karma Power: 22
Karma: 10
LukeT has less than 100 Karma points so far.
Please Help! AS9102 FAI acceptance - Currently having issues getting prompt approvals

We are currently having issues with out customer on getting prompt FAI approvals. I am monitoring the FAI activity very closely on the production floor and ensuring that we are capturing the multitude of ECO activity, but we have such a gap between submission and acceptance at the customer it is causing OTD issues and PPM hits at the customer. I have implemented the procedure that no production shall be shipped until the FAI has approval if it is a FULL FAI only. On a Delta FAI the practice is currently that we ship those with the rest of production. Recently we shipped a lot size of ten assemblies and one being a Delta FAI. The FAI failed and therefore there was no accepted FAI at the current revision for the remaining ten. Those were promptly failed as well causing us a PPM hit. I am attempting to implement the new system that all FAI's will require acceptance prior to production shipping, but I am trying to see if anyone else has run upon this?

This is a customer requirement and yet they bend the rules every time they get the chance to get product in. We currently have about 100 assemblies that have been submitted with no customer approval and I have hounded everyone in the facility to get these to no avail. What recourse does a supplier have when the customer is not complying?

Sorry this is so long but I have many questions that management at this facility are not addressing and I am trying to get some direction. Management does not take this very seriously around here. I would also like to know what the consequences are to us if we are found to be bending rules even with customer approval? I struggle with that daily.

Thanks
Reply With Quote

Sponsored Links
  #2  
Old 18th January 2005, 01:33 PM
Jeff Frost Jeff Frost is offline
Involved - Posts

Registration Date: May 2004
Location: Orange County, California
 
Posts: 383
Thanks Given to Others: 69
Thanked 125 Times in 94 Posts
Karma Power: 46
Karma: 806
Jeff Frost is appreciated, and has over 700 Karma points.Jeff Frost is appreciated, and has over 700 Karma points.Jeff Frost is appreciated, and has over 700 Karma points.Jeff Frost is appreciated, and has over 700 Karma points.Jeff Frost is appreciated, and has over 700 Karma points.Jeff Frost is appreciated, and has over 700 Karma points.Jeff Frost is appreciated, and has over 700 Karma points.
Default

Luke

You did not indicate if customer is requiring AS9102 FAI approval before shipment. I do know some aerospace customer are not accepting AS9102A but in both cases the "Original" and Revision "A" issue of AS9102 indicates customer signature is an “if applicable” requirement.

I do know that my organization only holds shipments pending receipt of customer AS9102 FAI approval when we have a hard requirement within PO/Contract to do so. You may only need to place a hold for FAI approval on a select number of customers and not all customer requiring AS9102 FAIs.

Jeff

Last edited by Jeff Frost; 18th January 2005 at 01:36 PM.
Reply With Quote
Sponsored Links

  #3  
Old 18th January 2005, 01:43 PM
Jim Howe Jim Howe is offline
E-Mails Invalid or Rejected

Registration Date: Jun 2004
Location: Ohio
 
Posts: 415
Thanks Given to Others: 0
Thanked 2 Times in 2 Posts
Karma Power: 0
Karma: 225
Jim Howe is appreciated, and has over 200 Karma points.Jim Howe is appreciated, and has over 200 Karma points.Jim Howe is appreciated, and has over 200 Karma points.
Default FAI/FAT approvals

Quote:
Originally Posted by LukeT

We are currently having issues with out customer on getting prompt FAI approvals. I am monitoring the FAI activity very closely on the production floor and ensuring that we are capturing the multitude of ECO activity, but we have such a gap between submission and acceptance at the customer it is causing OTD issues and PPM hits at the customer. I have implemented the procedure that no production shall be shipped until the FAI has approval if it is a FULL FAI only. On a Delta FAI the practice is currently that we ship those with the rest of production. Recently we shipped a lot size of ten assemblies and one being a Delta FAI. The FAI failed and therefore there was no accepted FAI at the current revision for the remaining ten. Those were promptly failed as well causing us a PPM hit. I am attempting to implement the new system that all FAI's will require acceptance prior to production shipping, but I am trying to see if anyone else has run upon this?

This is a customer requirement and yet they bend the rules every time they get the chance to get product in. We currently have about 100 assemblies that have been submitted with no customer approval and I have hounded everyone in the facility to get these to no avail. What recourse does a supplier have when the customer is not complying?

Sorry this is so long but I have many questions that management at this facility are not addressing and I am trying to get some direction. Management does not take this very seriously around here. I would also like to know what the consequences are to us if we are found to be bending rules even with customer approval? I struggle with that daily.

Thanks
In all my years of experience I have never heard of shipping production without an FAI approval. Of course the contract between you and your customer may be different then what I am use to. But that is where it must begin, in the contract review stage. There must be a firm understanding of what is required and when it is due.
In my experience the FAI/FAT's were line items on the purchase order with delivery dates and deliverables (product, test results, log books, etc.) The purchase order would state specifically that NO product could be delivered until FAI/FAT was approved.
My single best source to resolve issues of customer failure to approve was the customers BUYER. After all it is the buyer who is responsible for delivery where as the folks (usually QA and design engineers) who are responsible for FAI/FAT approvals are not concerned about delivery.
I would contact the buyer, give him the specific information regarding the product deliveries and the required approvals and in short order I would receive a response of what the issues were or an approved FAI.
Good luck!
Reply With Quote
  #4  
Old 19th January 2005, 10:35 AM
LukeT's Avatar
LukeT LukeT is offline
Inactive Registered Visitor

Registration Date: Aug 2004
Location: Wisconsin
 
Posts: 11
Thanks Given to Others: 0
Thanked 0 Times in 0 Posts
Karma Power: 22
Karma: 10
LukeT has less than 100 Karma points so far.
Default

Thanks for the input guys. The PO does not state anything about APPROVED FAI. It does state that a FAI, if needed, should be submitted with or ahead of the production material. There is so many nuance'e to this requirement that the customer finds different ways around things all of the time. I guess from our standpoint I do not feel comfortable sending prodcut without an approved FAI because if it fails we take the ppm hit for the accompanying product, and it is possible that we have a process issue that we need to be aware of.

We are going to attempt to get them to buy into NOT dingning us for the entire lot in this situation. We will see how it goes I guess. As far as the buyer being the contact, HA!!! The buyer wants one thing and the inspectors see something different. We can never get the same sense of urgency from the inspectors that the buyers have.

All the while we fight OTD issues to the customer. This is so much fun sometimes.
Reply With Quote
  #5  
Old 19th January 2005, 07:29 PM
Jeff Frost Jeff Frost is offline
Involved - Posts

Registration Date: May 2004
Location: Orange County, California
 
Posts: 383
Thanks Given to Others: 69
Thanked 125 Times in 94 Posts
Karma Power: 46
Karma: 806
Jeff Frost is appreciated, and has over 700 Karma points.Jeff Frost is appreciated, and has over 700 Karma points.Jeff Frost is appreciated, and has over 700 Karma points.Jeff Frost is appreciated, and has over 700 Karma points.Jeff Frost is appreciated, and has over 700 Karma points.Jeff Frost is appreciated, and has over 700 Karma points.Jeff Frost is appreciated, and has over 700 Karma points.
Default

Luke,

It is a quandary trying to please your customer’s inspection personnel but if the buyer did not specify FAI approval before shipment in purchase order directly or through reference to QAR/QAS then any dings on PPM are not justified. The buyer is responsible for flow down of his or her company’s requirements through the purchasing process and not the receiving dock inspector.

If you receive a PPM ding because the customers purchase order (contract) was silent on this requirement then you should request a correction to the PPM rating based on the facts. At my company we are seeing a rise in FAI approval before ship requirement and we deal with this through our contract review process but we do not hold a shipment because the customer could, should or might require this.

If its not a contract requirement we ship because if we hold the order we run the risk of receiving a PPM ding because the order was late.



Jeff

Last edited by Jeff Frost; 19th January 2005 at 07:32 PM.
Reply With Quote
  #6  
Old 20th January 2005, 11:45 AM
Jim Howe Jim Howe is offline
E-Mails Invalid or Rejected

Registration Date: Jun 2004
Location: Ohio
 
Posts: 415
Thanks Given to Others: 0
Thanked 2 Times in 2 Posts
Karma Power: 0
Karma: 225
Jim Howe is appreciated, and has over 200 Karma points.Jim Howe is appreciated, and has over 200 Karma points.Jim Howe is appreciated, and has over 200 Karma points.
Default

Quote:
Originally Posted by LukeT

Thanks for the input guys. The PO does not state anything about APPROVED FAI. It does state that a FAI, if needed, should be submitted with or ahead of the production material. There is so many nuance'e to this requirement that the customer finds different ways around things all of the time. I guess from our standpoint I do not feel comfortable sending prodcut without an approved FAI because if it fails we take the ppm hit for the accompanying product, and it is possible that we have a process issue that we need to be aware of.

We are going to attempt to get them to buy into NOT dingning us for the entire lot in this situation. We will see how it goes I guess. As far as the buyer being the contact, HA!!! The buyer wants one thing and the inspectors see something different. We can never get the same sense of urgency from the inspectors that the buyers have.

All the while we fight OTD issues to the customer. This is so much fun sometimes.
This sounds like it is in total chaos! (Your PO lacks a line item for delivery of FAI and apparently there was NO contract review). I am curious asto your top management view regarding the dings and the lack of a firm understanding of what they were to deliver. Good Luck!
Reply With Quote
  #7  
Old 25th January 2005, 01:22 PM
LukeT's Avatar
LukeT LukeT is offline
Inactive Registered Visitor

Registration Date: Aug 2004
Location: Wisconsin
 
Posts: 11
Thanks Given to Others: 0
Thanked 0 Times in 0 Posts
Karma Power: 22
Karma: 10
LukeT has less than 100 Karma points so far.
Default

That is funny I am curious too as to top managements view on this also. LOL

Our quality manager has a very good way of "massaging" then numbers so I am not even sure if it ever gets past him. It is very difficult to work like this believe me. Thanks for your input to this post I will post more if it becomes available. Thanks
Reply With Quote
Reply

Lower Navigation Bar
Go Back   The Elsmar Cove Forum > Aerospace and Aviation Requirements > AS9100 Aerospace Standard and Requirements

Bookmarks


Visitors Currently Viewing this Thread: 1 (0 Registered Visitors and 1 Unregistered Guests)
 
Thread Tools Search this Thread
Search this Thread:

Advanced Forum Search
Display Modes Rate Thread Content
Rate Thread Content:

Posting Settings
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump

Similar Discussion Threads
Discussion Thread Title Thread Starter Forum Replies Last Post or Poll Vote
AS9102 FAI (First Article Inspection) Form example ttwerp65 Documentation Control Systems, Procedures, Forms and Templates 13 15th October 2009 07:37 PM
What are the FAI requirements for an assembly? New to AS9102 mlubbs AS9100 Aerospace Standard and Requirements 3 17th October 2008 07:07 PM
AS9102 FAI Reports. Need for Standard Parts? J Allen AS9100 Aerospace Standard and Requirements 13 3rd June 2008 02:30 PM
AS9102 - Do I have to do FAI for all Standard Catalog Hardware items???? johnjbart AS9100 Aerospace Standard and Requirements 7 10th February 2005 11:05 AM
Following AS9102 for FAI Requirements - Does EVERY Component Need Its Own FAI? dj AS9100 Aerospace Standard and Requirements 40 31st August 2004 11:32 AM



The time now is 12:32 PM. All times are GMT -4.
The time zone can be changed in your UserCP --> Options.



   

All Y'All Come Back Now, Y' Hear?

Made With A Mac! FreeBSD OS Powered by Apache!
Using php4 Forums provided and maintained by Marc Smith Database by MySQL

FAIR USE and CORRECTNESS NOTICE: This site contains copyrighted material the use of which has not always been specifically authorized by the copyright owner. We are making such material available in our efforts to advance understanding of environmental, political, human rights, economic, democracy, scientific, and social justice issues, etc. We believe herein constitutes a 'fair use' of any such copyrighted material as provided for in section 107 of the US Copyright Law. In accordance with Title 17 U.S.C. Section 107, the material on this site is distributed without profit to those who have expressed a prior interest in receiving the included information for research and educational purposes. For more information go to: http://www.law.cornell.edu/uscode/17/ If you wish to use copyrighted material from this site for purposes of your own that go beyond 'fair use', you must obtain permission from the copyright owner. In addition, I do not guarantee the correctness of the content. The risk of using content from the Elsmar Cove web site and forums remains with the user/visitor.

Responsibility Statement: Each person is responsible for anything they post in the Elsmar Cove forum. Neither I, Marc Timothy Smith, nor any of the forum Moderators, are responsible for the content of posts people make. Liability for post content resides with the poster as does interpretation and/or acceptance and/or use of advice by the reader.

Complaints: If you have a complaint with a post in a forum discussion thread, including Content in general, fighting, flaming, copyright infringement, defamation and/or 'slander', please use the 'Report This Post Report This Post Button button which appears at the top of every post in every thread.

Site courtesy of:
Marc Timothy Smith - Cayman Business Systems, 8466 Lesourdsville-West Chester Road, West Chester, Ohio 45069-1929 - USA
(513) 341-6272

To contact me, click the Google Voice link below, enter Your Name and Your Phone Number and Google will ring your phone and connect you for free!

The Elsmar Cove Web Site is *CopyFree*
no new posts