The Elsmar Cove Wiki More Free Files The Elsmar Cove Forums Discussion Thread Index Post Attachments Listing Failure Modes Services and Solutions to Problems Elsmar cove Forums Main Page Elsmar Cove Home Page

Go Back   The Elsmar Cove Forum > Common Quality Assurance Processes and Tools > Inspection, Prints (Drawings), Testing, Sampling and Related Topics
Forum Username


Elsmar Cove Forum Sidebar
Custom Search
Monitor the Elsmar Forum
Monitor New Forum Posts
Follow Marc & Elsmar
Elsmar Cove Forum RSS Feed  Marc Smith's Google+ Page  Marc Smith's Linked In Page   Marc Smith's Elsmar Cove YouTube Page  Marc Smith's Facebook Page
Elsmar Cove Groups
Elsmar Cove Google+ Group  Elsmar Cove LinkedIn Group  Elsmar Cove Facebook Group
Sponsor Links







Donate and $ Contributor Forum Access
Sponsored Links
Courtesy Quick Links

Links that Elsmar Cove visitors will find useful in your quest for knowledge:


Howard's
International Quality Services

Atul's
Symphony Technologies

Marcelo Antunes'
SQR Consulting

Bob Doering's
Correct SPC - Precision Machining


NIST's Engineering Statistics Handbook

IRCA - International Register of Certified Auditors

SAE - Society of Automotive Engineers

Quality Digest Portal

IEST - Institute of Environmental Sciences and Technology

ASQ - American Society for Quality

Reply
 
Thread Tools Search this Thread Rate Thread Content Display Modes
  #1  
Old 1st February 2005, 03:45 AM
tmeisi tmeisi is offline
Inactive Registered Visitor

 
Registration Date: Jan 2005
Location: SINGAPORE
 
Posts: 1
Thanks Given to Others: 0
Thanked 0 Times in 0 Posts
Karma Power: 35
Karma: 10
tmeisi has less than 100 Karma points so far.
Please Help! MIL-STD-105E & Continuous production sampling plan

Hi,
I am a new member in this forum, I am wondering can everyone in this forum see my msg since I am using this 'post reply' function.. if not.. what is the correct way to post a msg in this forum??
My company has jus set up this QA department, and I am the first QA engineer in this company, thus a lot of procedures and rules are to be set up by me, which I have no exerience in QA at all.. I am a fresh grad from Uni actually.. thus, I really need help from you guys.. thanks..

My company is a polyurethane manufacturer, my manager has requested me to plan a AQL sampling plan for the company, and I had choosen a double sampling plan according to MIL-STD-105E standard. May I know if this standard still acceptable? As i had read from some website that it is actually cancelled. If this standard is no longer available, which standard should I use instead?

I had started implemeting this sampling plan actually, but I am facing a problem. The standard is base on lot or batch basis, whereas the operation in my company is to submit product on a continuos basis, which mean for a lot of 3000 pcs, we may seperate the delivery in 3 times. In this case, I am not able to apply lot-by-lot acceptance sampling procedure, may I know what is the correct way to do sampling plan in this situation? And what standard should i use in this case?

Thanks for advise

tmeisi

Sponsored Links
  #2  
Old 1st February 2005, 05:51 AM
Howard Atkins's Avatar
Howard Atkins Howard Atkins is offline
Forum Administrator

 
Registration Date: Jul 1997
Location: Revivim, Israel
 
Posts: 2,870
Thanks Given to Others: 142
Thanked 918 Times in 477 Posts
Blog Entries: 8
Karma Power: 400
Karma: 7499
Howard Atkins is appreciated, and has over 1700 Karma points.Howard Atkins is appreciated, and has over 1700 Karma points.
Howard Atkins is appreciated, and has over 1700 Karma points.Howard Atkins is appreciated, and has over 1700 Karma points.Howard Atkins is appreciated, and has over 1700 Karma points.Howard Atkins is appreciated, and has over 1700 Karma points.Howard Atkins is appreciated, and has over 1700 Karma points.Howard Atkins is appreciated, and has over 1700 Karma points.Howard Atkins is appreciated, and has over 1700 Karma points.Howard Atkins is appreciated, and has over 1700 Karma points.Howard Atkins is appreciated, and has over 1700 Karma points.Howard Atkins is appreciated, and has over 1700 Karma points.
Send a message via Skype™ to Howard Atkins
Hi,being
welcome to the cove,

The MIL-STD-105E is no longer supported by the Army and is now maintained by ANSI. This makes no difference and you can use it if you want.

See these threads, there are copies of the standard posted in them
http://elsmar.com/Forums/showthread.php?t=6426
http://elsmar.com/Forums/showthread.php?t=10209
http://elsmar.com/Forums/showthread.php?t=10238
http://elsmar.com/Forums/showthread.php?t=10367
__________________
Lean starts with your documentation
Save trees
Sponsored Links

  #3  
Old 1st February 2005, 07:00 AM
Wes Bucey's Avatar
Wes Bucey Wes Bucey is offline
Quality Manager

 
Registration Date: Sep 2003
Location: Illinois
 
Posts: 10,451
Thanks Given to Others: 459
Thanked 2,635 Times in 1,721 Posts
Karma Power: 1124
Karma: 19635
Wes Bucey is appreciated, and has over 1700 Karma points.Wes Bucey is appreciated, and has over 1700 Karma points.
Wes Bucey is appreciated, and has over 1700 Karma points.Wes Bucey is appreciated, and has over 1700 Karma points.Wes Bucey is appreciated, and has over 1700 Karma points.Wes Bucey is appreciated, and has over 1700 Karma points.Wes Bucey is appreciated, and has over 1700 Karma points.Wes Bucey is appreciated, and has over 1700 Karma points.Wes Bucey is appreciated, and has over 1700 Karma points.Wes Bucey is appreciated, and has over 1700 Karma points.Wes Bucey is appreciated, and has over 1700 Karma points.Wes Bucey is appreciated, and has over 1700 Karma points.Wes Bucey is appreciated, and has over 1700 Karma points.
How to use the Forums

Welcome to the Cove

I see two of our administrators have already helped you behind the scenes by editing your post and splitting it off into its own thread.

One place you might look for guidance on using the forums is to look through the threads in this Forum:
How To in the Forums
Detailed Use Instructions - This forum contains basic information on 'How To' do things, such as Add a Poll to a Thread or an Attachment to a Post in a Thread.

In specific, read How To Start a New Thread in a Forum
Marc


If you have further questions about using the Forums not covered in those threads already there, add a new post to a thread most similar to your question topic or start a new thread with your question if it doesn't seem to have been covered before.

We want you to enjoy your experience here in the Cove.
__________________
"Few minds wear out; more rust out"
Inscribed over the entrance of Louis Pasteur School, Chicago
Christian Nestell Bovee (1820-1904) in Thoughts, Feelings and Fancies, 1857
  #4  
Old 1st February 2005, 07:34 AM
CarolX's Avatar
CarolX CarolX is offline
Super Moderator

 
Registration Date: Jun 2000
Location: North of Chicago,Illinois, USA
Age: 53
 
Posts: 2,171
Thanks Given to Others: 472
Thanked 386 Times in 277 Posts
Karma Power: 280
Karma: 5190
CarolX is appreciated, and has over 1700 Karma points.
CarolX is appreciated, and has over 1700 Karma points.CarolX is appreciated, and has over 1700 Karma points.CarolX is appreciated, and has over 1700 Karma points.CarolX is appreciated, and has over 1700 Karma points.CarolX is appreciated, and has over 1700 Karma points.CarolX is appreciated, and has over 1700 Karma points.CarolX is appreciated, and has over 1700 Karma points.CarolX is appreciated, and has over 1700 Karma points.CarolX is appreciated, and has over 1700 Karma points.CarolX is appreciated, and has over 1700 Karma points.CarolX is appreciated, and has over 1700 Karma points.CarolX is appreciated, and has over 1700 Karma points.CarolX is appreciated, and has over 1700 Karma points.
Quote:
In Reply to Parent Post by tmeisi

Hi,

I had started implemeting this sampling plan actually, but I am facing a problem. The standard is base on lot or batch basis, whereas the operation in my company is to submit product on a continuos basis, which mean for a lot of 3000 pcs, we may seperate the delivery in 3 times. In this case, I am not able to apply lot-by-lot acceptance sampling procedure, may I know what is the correct way to do sampling plan in this situation? And what standard should i use in this case?

Thanks for advise

tmeisi
Welcome to the Cove,

Like Howard said, you can still use MIL-STD-105E.

If you read the standard, it allows you to "batch" lots as you are doing. You have 3 seperate deliveries, or "batches" out of each "lot". So set-up your sampling from the "batches".
__________________
CarolX

Theater is life, film is art, and television is furniture.
  #5  
Old 1st February 2005, 04:09 PM
Caster's Avatar
Caster Caster is offline
An Early Cover

 
Registration Date: Jul 2003
 
Posts: 924
Thanks Given to Others: 204
Thanked 214 Times in 155 Posts
Karma Power: 139
Karma: 3279
Caster is appreciated, and has over 1700 Karma points.
Caster is appreciated, and has over 1700 Karma points.Caster is appreciated, and has over 1700 Karma points.Caster is appreciated, and has over 1700 Karma points.
CSL Plans

Quote:
In Reply to Parent Post by tmeisi

I had started implemeting this sampling plan actually, but I am facing a problem. The standard is base on lot or batch basis, whereas the operation in my company is to submit product on a continuos basis, which mean for a lot of 3000 pcs, we may seperate the delivery in 3 times. In this case, I am not able to apply lot-by-lot acceptance sampling procedure, may I know what is the correct way to do sampling plan in this situation? And what standard should i use in this case?Thanks for advisetmeisi
Welcome to the Cove.

May I suggest you search here for CSP-1 or Continuous Sampling Plans. This type of plan may be just the thing you need. You can sample from a flow of product. There are no batches involved.

If you have some money to spend buy The Handbook of Applied Acceptance Sampling bu Kenneth S. Stephens.

Both 105 and CSP plans are covered completely. There are also Excel spreadsheets on a CD to let you anlayze the risks associated with the plans.

S0meone at the Cove suggested this book to me and it really helped me.

Good luck with your sampling plan.
Reply

Lower Navigation Bar
Go Back   The Elsmar Cove Forum > Common Quality Assurance Processes and Tools > Inspection, Prints (Drawings), Testing, Sampling and Related Topics

Do you find this discussion thread helpful and informational?


Bookmarks


Visitors Currently Viewing this Thread: 1 (0 Registered Visitors (Members) and 1 Unregistered Guest Visitors)
 
Thread Tools Search this Thread
Search this Thread:

Advanced Forum Search
Display Modes Rate Thread Content
Rate Thread Content:

Forum Posting Settings
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off


Similar Discussion Threads
Discussion Thread Title Thread Starter Forum Replies Last Post or Poll Vote
MIL-STD-105D & MIL-STD-105E Differences Link Xue Inspection, Prints (Drawings), Testing, Sampling and Related Topics 24 9th March 2012 08:45 AM
How to select the requirements for Continuous Sampling Plan (CSP-1&F), Mil-Std 1235C? CK lau Inspection, Prints (Drawings), Testing, Sampling and Related Topics 3 17th July 2008 05:26 AM
Acceptable AS9100 Receiving Inspection Sampling Plan - ANSI/ASQCZ1.4 vs. Mil-STD-105E tomstwincam Inspection, Prints (Drawings), Testing, Sampling and Related Topics 10 6th November 2007 05:10 PM
Continuous Sampling Plan CSP-1 aka MIL STD 1235C Caster Inspection, Prints (Drawings), Testing, Sampling and Related Topics 7 16th December 2004 02:22 PM
Continuous Sampling Plan for small lot sizes: Does MIL-STD 1235B provide one? The Fixer Inspection, Prints (Drawings), Testing, Sampling and Related Topics 2 1st August 1999 09:40 AM



The time now is 02:19 AM. All times are GMT -4.
Your time zone can be changed in your UserCP --> Options.


   


Marc Timothy Smith - Elsmar.com
8466 LeSourdsville-West Chester Road, Olde West Chester, Ohio 45069-1929
513 341-6272