The Elsmar Cove Forum and Site Map The Elsmar Cove Wiki More Free Files The Elsmar Cove Forums Discussion Thread Index Post Attachments Listing Failure Modes Services and Solutions to Problems Elsmar cove Forums Main Page Elsmar Cove Home Page

Go Back   The Elsmar Cove Forum > Manufacturing, Service, and Business Systems Processes > Service Industry Specific Topics


The Elsmar Cove Forum SideBar!
Monitor the Forum
Monitor New Forum Posts
New Threads Feeds
RSS FeedRSS Feed
Sponsor Link










$ Contributor Forum Access
Courtesy Quick Links

Links that Elsmar Cove visitors will find useful in your quest for knowledge:


Howard's International Quality Services

Atul's Symphony Technologies

Dave Scott's Scott Quality Solutions

Praxiom Research Group


NIST's Engineering Statistics Handbook

IRCA - International Register of Certified Auditors

SAE - Society of Automotive Engineers

Quality Digest Portal

IEST - Institute of Environmental Sciences and Technology

ASQ - American Society for Quality


All the Important Standards and Related Web Sites in the World
Reply
 
Thread Tools Search this Thread Rate Thread Content Display Modes
  #1  
Old 9th February 2005, 07:19 PM
Carlos Echeverry's Avatar
Carlos Echeverry Carlos Echeverry is offline
noob!

Registration Date: Mar 2004
Location: Colombia
Age: 38
 
Posts: 55
Thanks Given to Others: 0
Thanked 0 Times in 0 Posts
Karma Power: 27
Karma: 115
Carlos Echeverry is appreciated, and has over 100 Karma points.Carlos Echeverry is appreciated, and has over 100 Karma points.
Send a message via MSN to Carlos Echeverry
I Say... Quality Plan in a Service Company - Civil engineering service - Building construction

Hi all:

I'm in charge of a QMS 9001:2000 in a productive company. We have a Mill, etc. This have been basically my experience with this standard. We have quality plans, documents, etc.

But, the other day I was talking with a friend who has a service company (civil engineering service for building constructions). We started to talk about these things, and he's very interested in establish QMS 9001 in his company.

So I put my nose inside his business trying to understand how to do it...just trying to advise things, but fastly I understood it was too hard for me manage service companies terms.

Analyzing chapter by chapter there is one especially who is still hard for me. QUALITY PLANS.

Any idea how it works in service companies? Any examples availables?

Thanks in advance for your help
Reply With Quote

Sponsored Links
  #2  
Old 9th February 2005, 09:25 PM
Wes Bucey's Avatar
Wes Bucey Wes Bucey is offline
Quality Manager

Registration Date: Sep 2003
Location: Illinois
 
Posts: 7,534
Thanks Given to Others: 182
Thanked 1,127 Times in 762 Posts
Karma Power: 397
Karma: 11090
Wes Bucey is appreciated, and has over 1700 Karma points.Wes Bucey is appreciated, and has over 1700 Karma points.Wes Bucey is appreciated, and has over 1700 Karma points.
Wes Bucey is appreciated, and has over 1700 Karma points.Wes Bucey is appreciated, and has over 1700 Karma points.Wes Bucey is appreciated, and has over 1700 Karma points.Wes Bucey is appreciated, and has over 1700 Karma points.Wes Bucey is appreciated, and has over 1700 Karma points.Wes Bucey is appreciated, and has over 1700 Karma points.Wes Bucey is appreciated, and has over 1700 Karma points.Wes Bucey is appreciated, and has over 1700 Karma points.Wes Bucey is appreciated, and has over 1700 Karma points.Wes Bucey is appreciated, and has over 1700 Karma points.Wes Bucey is appreciated, and has over 1700 Karma points.Wes Bucey is appreciated, and has over 1700 Karma points.
Default

Also look at this thread:
ISO and Services?

In my opinion, it is as easy, sometimes easier, to make Quality Plans for a service company as for a manufacturing company.

For just one small example (we consider the "deliverable" to be the finished engineering drawing (design) plus the follow-up service to ensure the building is built to the drawing (finished product)):

There are a number of SOP (Standard Operating Procedures) such as adhering to building codes, performing mathematical analyses to ensure structure will support itself and contents without collapsing, review and approval by experts and by clients of various stages of the engineering drawings which are made to customer requirements and conform to regulatory codes.

Special attention is paid to competence of personnel involved in design and overseeing construction.

Management of the engineering firm is constantly aware of being customer-centric. During the drawing stage, FMEA (Failure Mode and Effects Analysis) can be performed and the changes dictated are merely erasing and redrawing versus modifying existing machinery or purchasing new.

Contract Review can extend to purchasing activities for materials which may be substituted if original design materials are unavailable (concrete shingle versus ceramic tile roof?)

It seems to me the only thing NOT necessary or analogous to manufacturing is SPC because each building is unique for location (one-off in manufacturing world.)

If outside drafters are hired as contract help, it is no different from hiring contract help for any manufacturing task - same with outsourcing (Heating, Ventilating & Air Conditioning?) to specialists just as a machinist might outsource to a plating company.

Where did you see the difficulties?
__________________
"Few minds wear out; more rust out"
Inscribed over the entrance of Louis Pasteur School, Chicago
Christian Nestell Bovee (1820-1904) in Thoughts, Feelings and Fancies, 1857

Last edited by Wes Bucey; 9th February 2005 at 09:30 PM. Reason: note similar thread
Reply With Quote
Sponsored Links

  #3  
Old 10th February 2005, 02:16 AM
MikeL MikeL is offline
Involved - Posts

Registration Date: Aug 2004
Location: Adelaide, Australia
 
Posts: 124
Thanks Given to Others: 0
Thanked 1 Time in 1 Post
Karma Power: 25
Karma: 81
MikeL has less than 100 Karma points so far.
Thumbs up Quality Plan

Wes has pretty much covered it.

Think of the qualiity plan as the information and recording system you would need if the project group were isolated from their company and were just looking after this contract.
Reply With Quote
  #4  
Old 10th February 2005, 08:58 AM
Carlos Echeverry's Avatar
Carlos Echeverry Carlos Echeverry is offline
noob!

Registration Date: Mar 2004
Location: Colombia
Age: 38
 
Posts: 55
Thanks Given to Others: 0
Thanked 0 Times in 0 Posts
Karma Power: 27
Karma: 115
Carlos Echeverry is appreciated, and has over 100 Karma points.Carlos Echeverry is appreciated, and has over 100 Karma points.
Send a message via MSN to Carlos Echeverry
Default

Any example in a service company to figure it out better?

Still hard to understand...as manufacturing company, we use to "see" products.

I hope you undersand my frustation
Reply With Quote
  #5  
Old 11th February 2005, 05:17 AM
MikeL MikeL is offline
Involved - Posts

Registration Date: Aug 2004
Location: Adelaide, Australia
 
Posts: 124
Thanks Given to Others: 0
Thanked 1 Time in 1 Post
Karma Power: 25
Karma: 81
MikeL has less than 100 Karma points so far.
Cool Hospitals

If you have ever stayed in hospital you'll know that at the foot of the bed is your quality plan.

Admission forms
medical record
charts
nurses' notes
discharge plan
Reply With Quote
Reply

Lower Navigation Bar
Go Back   The Elsmar Cove Forum > Manufacturing, Service, and Business Systems Processes > Service Industry Specific Topics

Bookmarks


Visitors Currently Viewing this Thread: 1 (0 Registered Visitors and 1 Unregistered Guests)
 
Thread Tools Search this Thread
Search this Thread:

Advanced Forum Search
Display Modes Rate Thread Content
Rate Thread Content:

Posting Settings
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump

Similar Discussion Threads
Discussion Thread Title Thread Starter Forum Replies Last Post or Poll Vote
Quality control system in building sites - Construction pakis ISO 9001 - Quality Management Systems Standard 1 25th November 2008 03:37 AM
Exclusions for Service/Construction Adjordan ISO 9001 - Quality Management Systems Standard 5 30th April 2008 07:31 PM
Quality Plan template for Engineering, Procurement and Construction Business Nadeem A. ISO 9001 - Quality Management Systems Standard 5 31st March 2007 01:41 PM
Quality Plan for construction company - Certification to ISO9001, ISO14001 and OHSAS Colpart Documentation Control Systems, Procedures, Forms and Templates 3 18th December 2006 08:29 AM
Defining Quality Objectives for a Scaffolding Service company Thomas Kurian ISO 9001 - Quality Management Systems Standard 12 26th November 2005 01:14 AM



The time now is 09:36 AM. All times are GMT -4.
The time zone can be changed in your UserCP --> Options.



   

All Y'All Come Back Now, Y' Hear?

Made With A Mac! FreeBSD OS Powered by Apache!
Using php4 Forums provided and maintained by Marc Smith Database by MySQL

FAIR USE and CORRECTNESS NOTICE: This site contains copyrighted material the use of which has not always been specifically authorized by the copyright owner. We are making such material available in our efforts to advance understanding of environmental, political, human rights, economic, democracy, scientific, and social justice issues, etc. We believe herein constitutes a 'fair use' of any such copyrighted material as provided for in section 107 of the US Copyright Law. In accordance with Title 17 U.S.C. Section 107, the material on this site is distributed without profit to those who have expressed a prior interest in receiving the included information for research and educational purposes. For more information go to: http://www.law.cornell.edu/uscode/17/ If you wish to use copyrighted material from this site for purposes of your own that go beyond 'fair use', you must obtain permission from the copyright owner. In addition, I do not guarantee the correctness of the content. The risk of using content from the Elsmar Cove web site and forums remains with the user/visitor.

Responsibility Statement: Each person is responsible for anything they post in the Elsmar Cove forum. Neither I, Marc Timothy Smith, nor any of the forum Moderators, are responsible for the content of posts people make. Liability for post content resides with the poster as does interpretation and/or acceptance and/or use of advice by the reader.

Complaints: If you have a complaint with a post in a forum discussion thread, including Content in general, fighting, flaming, copyright infringement, defamation and/or 'slander', please use the 'Report This Post Report This Post Button button which appears at the top of every post in every thread.

Site courtesy of:
Marc Timothy Smith - Cayman Business Systems, 8466 Lesourdsville-West Chester Road, West Chester, Ohio 45069-1929 - USA
(513) 341-6272

To contact me, click the Google Voice link below, enter Your Name and Your Phone Number and Google will ring your phone and connect you for free!

The Elsmar Cove Web Site is *CopyFree*
no new posts