The Elsmar Cove Forum and Site Map The Elsmar Cove Wiki More Free Files The Elsmar Cove Forums Discussion Thread Index Post Attachments Listing Failure Modes Services and Solutions to Problems Elsmar cove Forums Main Page Elsmar Cove Home Page

Go Back   The Elsmar Cove Forum > Common Quality Assurance Processes and Tools > Six Sigma


The Elsmar Cove Forum SideBar!
Monitor the Forum
Monitor New Forum Posts
New Threads Feeds
RSS FeedRSS Feed
Sponsor Link










$ Contributor Forum Access
Courtesy Quick Links

Links that Elsmar Cove visitors will find useful in your quest for knowledge:


Howard's International Quality Services

Atul's Symphony Technologies

Dave Scott's Scott Quality Solutions

Praxiom Research Group


NIST's Engineering Statistics Handbook

IRCA - International Register of Certified Auditors

SAE - Society of Automotive Engineers

Quality Digest Portal

IEST - Institute of Environmental Sciences and Technology

ASQ - American Society for Quality


All the Important Standards and Related Web Sites in the World
Reply
 
Thread Tools Search this Thread Rate Thread Content Display Modes
  #1  
Old 24th February 2005, 08:35 AM
Sushil Sushil is offline
Universal

Registration Date: Aug 2004
Location: India
Age: 39
 
Posts: 12
Thanks Given to Others: 0
Thanked 0 Times in 0 Posts
Karma Power: 22
Karma: 10
Sushil has less than 100 Karma points so far.
Let Me Help You DPMO (Defects Per Million Opportunities) vs. RTY (Rolled-Throughput-Yield)

I need some help in understanding DPMO Vs RTY. See attached Presentation slide which I downloaded from Web. Can I relate DPMO to RTY ?. What's the rationale behind this. Is this correct ?. I did some manual calculations myself in one of the areas we are working on, this does'nt seem to be true. For my case I did the RTY calculation based on Poisson's equation & probability of zero defects as e ^(-DPU). Can someone guide me on this and how can I explain relation between RTY and DPMO..? How can I calculate RTY based on DPMO data ?.
Attached Files: 1. Scan for viruses before using, 2. Please report any 'bad' files by Reporting the post it is in, 3. Use at your Own Risk.
File Type: pdf DPMO Vs RTY.pdf (34.5 KB, 459 views)
Reply With Quote

Sponsored Links
  #2  
Old 24th February 2005, 11:39 AM
wmarhel wmarhel is offline
Courtesy Access

Registration Date: Oct 2004
Location: DuBois, PA
Age: 39
 
Posts: 612
Thanks Given to Others: 109
Thanked 234 Times in 149 Posts
Karma Power: 94
Karma: 3086
wmarhel is appreciated, and has over 1700 Karma points.
wmarhel is appreciated, and has over 1700 Karma points.
Default Why would you want to?

Quote:
Originally Posted by Sushil

Can I relate DPMO to RTY ?. What's the rationale behind this. Is this correct ?
For RTY (Rolled-Throughput-Yield) it doesn't matter whether there are 10 defects or just a single defect. It failed to meet to the necessary quality requirements to move onto the next operation/work center/etc.

I'm not a huge fan of DPMO as it relates to the manufacturing process, it's more of a tool to used during the design and re-design of new products/processes. A defective product is a defective product, irregardless of whether three things don't work on it, or just one. Sometimes it feels that there are engineers out there who believe that if it isn't broken.....there just aren't enough features on it.

Here's a thread on DPMO which may or not help: DPMO calculation for Testing stations- ideal way? High volume PCB manufacture

Wayne
Reply With Quote
Sponsored Links

  #3  
Old 25th February 2005, 12:41 PM
James Oldham James Oldham is offline
E-Mails Invalid or Rejected

Registration Date: Feb 2005
Location: Arkansas
 
Posts: 5
Thanks Given to Others: 0
Thanked 0 Times in 0 Posts
Karma Power: 0
Karma: 48
James Oldham has less than 100 Karma points so far.
Default

Sushil,

You can convert RTY into DPMO and back again - they are just different ways of showing the same number. RTY as a % is # good/total, therefore 1-RTY is the % defective. Since % defective is technically "defects per hundred", just multiply this number times 1,000,000 to get DPMO.

Is the glass half full or half empty? This is another one of those cases why lots in the forum shun Six Sigma. Just focus on the # of defects and fix the problems - the form in which you report the number doesn't matter.
Reply With Quote
  #4  
Old 25th February 2005, 11:02 PM
Sushil Sushil is offline
Universal

Registration Date: Aug 2004
Location: India
Age: 39
 
Posts: 12
Thanks Given to Others: 0
Thanked 0 Times in 0 Posts
Karma Power: 22
Karma: 10
Sushil has less than 100 Karma points so far.
Please Help!

Quote:
Originally Posted by James Oldham

Sushil,

You can convert RTY into DPMO and back again - they are just different ways of showing the same number.
James.. pardon me

I am still confused. I do not understand why DPMO % is being related and termed as RTY. I did some study from a station in floor and following were my findings, which confuses me more..
total Defects =500
Total Opps =7787260
DPU = 0.41
RTY =e^-DPU=66.4%
DPMO = 64.21

as per table attached in my first post
DPMO %(RTY) for 64.21DPMO will be 99.99353%

why is this difference..? and is there any issue terming DPMO% as RTY ? can it be done..

Reply With Quote
  #5  
Old 6th January 2006, 02:50 PM
gvalenti9's Avatar
gvalenti9 gvalenti9 is offline
Inactive Registered Visitor

Registration Date: Dec 2005
Location: USA, OR
 
Posts: 9
Thanks Given to Others: 0
Thanked 0 Times in 0 Posts
Karma Power: 17
Karma: 10
gvalenti9 has less than 100 Karma points so far.
Default DPMO and RTY

Hopefully I can explain this clearly.

total Defects =500
Total Opps =7787260
DPU = 0.41

m = number of opportunities/unit = 6383. I calculated this using the total # of defects (500) divided by the DPU to derive that the data was based on 1220 units then divided the total opps by the # of units.

RTY =e^-DPU=66.4%
DPMO = 64.21

Yna = Normalized yield = RTY ^ (1/m) = 0.664^(1/6383) =.99993585 which matches up to 99.99353% that you calculated

DPMO can be calculated from the Yna or from actual yield data
DPMO = (1-Yna)*10^6 = (1-0.9999353)*10^6 = 64.15
DPMO = # defects/# opportunities *10^6 = 500/7787260*10^6 =64.21

So then, why does RTY not equal DPMO and DPMO not equal DPMO?

DPMO = # defects/# opportunities *10^6 is an actual calculation based are units processed, number of defects found, and number of real opportunities per unit.

DPMO = (1-Yna)*10^6 is based on the Poisson distribution used to calculate RTY. RTY = e^-DPU assumes defects are distributed randomly and are assumed to follow a Poisson distrubtion. Yna, therefore, reflects the assumed Poisson distribution used to calculate RTY . As the defect rate falls below 10%, Yna and DPMO converge. The data that you have shows them converging quite nicely. It appears that you were only missing the one step DPMO = (1-Yna)*10^6

The benefit of the DPMO is that it normalizes the data so that assemblies of different complexities/defect opportunities can be compared objectively. The benefit of RTY is that if there is an issue with yields, it becomes immediately obvious.

Last edited by gvalenti9; 6th January 2006 at 02:51 PM. Reason: formatting
Reply With Quote
  #6  
Old 25th July 2008, 02:48 PM
QualityKangaroo QualityKangaroo is offline
Inactive Registered Visitor

Registration Date: Sep 2007
Location: USA
 
Posts: 3
Thanks Given to Others: 0
Thanked 0 Times in 0 Posts
Karma Power: 9
Karma: 10
QualityKangaroo has less than 100 Karma points so far.
Default Re: DPMO (Defects Per Million Opportunities) vs. RTY (Rolled-Throughput-Yield)

Sushil or anyone else out there,

I am responding to why DPMO can/can not be related to RTY.

I have found that one major difficult (as pointed out above) is the normal distribution assumption... as you may know, even if an overall process exhibits normality certain process steps do not. It is actually helpful to compare CpK (capability) to FTY (in RTY sense) to check this assumption... though not foolproof it may show you some interesting things happening in the process. However, the main reason I have added to this thread: No one seems to have brought up the point that DPMO looks at defects which, let us assume, are properly recorded and assigned a cause and process step. We can usually pull this data with ease. However RTY also pulls in "rework". It is sometimes dangerous to assume that all "out-of-spec"/"out-of tolerance" are either recorded as waste or reworked. Sometimes in-spec product is re-worked for an number of reasons (good or bad) and is therefore not captured in the DPMO umbrella. This is actually why I prefer RTY when looking at a process - it can direct you to little hidden rework zones that DPMO often misses. So, in conclusion DPMO misses out on some of the rework and therefore gives an incomplete picture of the reality on the shop floor.

Hope this helps.

Q. Kangaroo
Reply With Quote
  #7  
Old 25th July 2008, 02:56 PM
Jim Wynne's Avatar
Jim Wynne Jim Wynne is offline
Courtesy Access

Registration Date: Jan 2005
Location: Southeast Wisconsin
Age: 57
 
Posts: 9,215
Thanks Given to Others: 755
Thanked 2,295 Times in 1,549 Posts
Karma Power: 611
Karma: 20390
Jim Wynne is appreciated, and has over 1700 Karma points.Jim Wynne is appreciated, and has over 1700 Karma points.
Jim Wynne is appreciated, and has over 1700 Karma points.Jim Wynne is appreciated, and has over 1700 Karma points.Jim Wynne is appreciated, and has over 1700 Karma points.Jim Wynne is appreciated, and has over 1700 Karma points.Jim Wynne is appreciated, and has over 1700 Karma points.Jim Wynne is appreciated, and has over 1700 Karma points.Jim Wynne is appreciated, and has over 1700 Karma points.Jim Wynne is appreciated, and has over 1700 Karma points.Jim Wynne is appreciated, and has over 1700 Karma points.Jim Wynne is appreciated, and has over 1700 Karma points.Jim Wynne is appreciated, and has over 1700 Karma points.Jim Wynne is appreciated, and has over 1700 Karma points.Jim Wynne is appreciated, and has over 1700 Karma points.
Default Re: DPMO (Defects Per Million Opportunities) vs. RTY (Rolled-Throughput-Yield)

Quote:
Originally Posted by QualityKangaroo View Post

Sushil or anyone else out there,

I am responding to why DPMO can/can not be related to RTY.

I have found that one major difficult (as pointed out above) is the normal distribution assumption... as you may know, even if an overall process exhibits normality certain process steps do not. It is actually helpful to compare CpK (capability) to FTY (in RTY sense) to check this assumption... though not foolproof it may show you some interesting things happening in the process. However, the main reason I have added to this thread: No one seems to have brought up the point that DPMO looks at defects which, let us assume, are properly recorded and assigned a cause and process step. We can usually pull this data with ease. However RTY also pulls in "rework". It is sometimes dangerous to assume that all "out-of-spec"/"out-of tolerance" are either recorded as waste or reworked. Sometimes in-spec product is re-worked for an number of reasons (good or bad) and is therefore not captured in the DPMO umbrella. This is actually why I prefer RTY when looking at a process - it can direct you to little hidden rework zones that DPMO often misses. So, in conclusion DPMO misses out on some of the rework and therefore gives an incomplete picture of the reality on the shop floor.

Hope this helps.

Q. Kangaroo
Why would conforming product need to be reworked?
__________________
Some men are born mediocre, some men achieve mediocrity, and some men have mediocrity thrust upon them.-- Joseph Heller
Reply With Quote
  #8  
Old 25th July 2008, 03:09 PM
QualityKangaroo QualityKangaroo is offline
Inactive Registered Visitor

Registration Date: Sep 2007
Location: USA
 
Posts: 3
Thanks Given to Others: 0
Thanked 0 Times in 0 Posts
Karma Power: 9
Karma: 10
QualityKangaroo has less than 100 Karma points so far.
Default Re: DPMO (Defects Per Million Opportunities) vs. RTY (Rolled-Throughput-Yield)

One reason (though not a good one) that I often run into is that an operator attempts to react to an existing condition communicated by another team member (downstream)... it may not even be something we currently measure but which makes the job easier down the process. Secondly, and perhaps more troubling, is that an operator establishes their own reaction limits. Most of the time this can be addressed by proper coaching and follow-up training, but I have visited many plants with the operator is prideful to a detriment - they chase a target and cause greater variation AND often rework acceptable product. One simple example: I'm making cookies and I don't like diameter (even though its in spec)... I take the dough and replace it in to a mixer. The mentality expressed is often, "I want to better, what's wrong with that?"... suddenly you have a less efficient process (and likely one with more variation considering the operator attempt to make the diameter "better"). I hope this clarifies
Reply With Quote
Reply

Lower Navigation Bar
Go Back   The Elsmar Cove Forum > Common Quality Assurance Processes and Tools > Six Sigma

Bookmarks

Tags
defects per million opportunities, dpmo, rty


Visitors Currently Viewing this Thread: 1 (0 Registered Visitors and 1 Unregistered Guests)
 
Thread Tools Search this Thread
Search this Thread:

Advanced Forum Search
Display Modes Rate Thread Content
Rate Thread Content:

Posting Settings
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump

Similar Discussion Threads
Discussion Thread Title Thread Starter Forum Replies Last Post or Poll Vote
How to define and Calculate the DPU, DPMU, DPMO, Yield, Rolled Throughput Yield (RTY) billlin Manufacturing and Related Processes 3 1st July 2009 08:34 AM
TDU (Total Defects per Unit) and RTY (Rolled Throughput Yield) Definitions ngkjrs Definitions, Acronyms, Abbreviations and Interpretations 5 18th January 2008 04:45 AM
RTY (Rolled Throughput Yield) - Use Poisson Distribution Calculation stanley.su Quality Tools, Improvement and Analysis 4 11th February 2007 08:18 PM
Rolled Throughput Yield (RTY) Calculations for a Sequential Process HDR Six Sigma 2 12th January 2007 09:21 PM
RTY (Rolled Throughput Yield) Calculation Link Xue Other ISO and International Standards and European Regulations 4 18th December 2003 04:57 PM



The time now is 05:21 PM. All times are GMT -4.
The time zone can be changed in your UserCP --> Options.



   

All Y'All Come Back Now, Y' Hear?

Made With A Mac! FreeBSD OS Powered by Apache!
Using php4 Forums provided and maintained by Marc Smith Database by MySQL

FAIR USE and CORRECTNESS NOTICE: This site contains copyrighted material the use of which has not always been specifically authorized by the copyright owner. We are making such material available in our efforts to advance understanding of environmental, political, human rights, economic, democracy, scientific, and social justice issues, etc. We believe herein constitutes a 'fair use' of any such copyrighted material as provided for in section 107 of the US Copyright Law. In accordance with Title 17 U.S.C. Section 107, the material on this site is distributed without profit to those who have expressed a prior interest in receiving the included information for research and educational purposes. For more information go to: http://www.law.cornell.edu/uscode/17/ If you wish to use copyrighted material from this site for purposes of your own that go beyond 'fair use', you must obtain permission from the copyright owner. In addition, I do not guarantee the correctness of the content. The risk of using content from the Elsmar Cove web site and forums remains with the user/visitor.

Responsibility Statement: Each person is responsible for anything they post in the Elsmar Cove forum. Neither I, Marc Timothy Smith, nor any of the forum Moderators, are responsible for the content of posts people make. Liability for post content resides with the poster as does interpretation and/or acceptance and/or use of advice by the reader.

Complaints: If you have a complaint with a post in a forum discussion thread, including Content in general, fighting, flaming, copyright infringement, defamation and/or 'slander', please use the 'Report This Post Report This Post Button button which appears at the top of every post in every thread.

Site courtesy of:
Marc Timothy Smith - Cayman Business Systems, 8466 Lesourdsville-West Chester Road, West Chester, Ohio 45069-1929 - USA
(513) 341-6272

To contact me, click the Google Voice link below, enter Your Name and Your Phone Number and Google will ring your phone and connect you for free!

The Elsmar Cove Web Site is *CopyFree*
no new posts