|
|
 |
|

15th March 2005, 11:40 PM
|
 |
Super Moderator
Registration Date: Apr 2004
Location: Fremont, California
|
|
Posts: 546
Thanks Given to Others: 13
Thanked 36 Times in 35 Posts
Karma Power: 50
|
|
Lean-Six Sigma: What do critics say?
Lean Manufacturing is also a combination of 1960s to 1980s Industrial Engineering tools, packaged to meet the modern industrial necessity of JIT, No WIP, Cycle time reduction,Value stream resulting in bottom line improvement.
Lean also has X belt certification, Consultant implementation, Massive training cost, big corporations endorsement. I see no difference from “Six sigma” point by point. Both methodologies complement each other. Don’t get me wrong; I believe in the synergy of both Lean and Six sigma.
Iam not sure why Six sigma was singled out by various professionals and was put on trial. How did Lean Manufacturing escape from the critics?
Regards,
Govind.
|

16th March 2005, 02:22 AM
|
 |
Quality Manager
Registration Date: Sep 2003
Location: Illinois
|
|
Posts: 7,534
Thanks Given to Others: 182
Thanked 1,127 Times in 762 Posts
Karma Power: 397
|
|
My guess is that Lean created the image it was all about efficiency and had none of the bad image of "Quality Qops" (QQ) policing (and narcing on miscreants [contrary to Deming]) production to "detect" nonconformance. Six Sigma took on some of the trappings of QQ and stepped on a few toes so they got lambasted by QQ who didn't like the invasion of their (our?) turf. Sadly, both the QQ and 6S folk spend too much time patting themselves on the back about how good they are while the Lean folks just go ahead and do their thing and let the results speak for themselves with no phony balony "projections of savings." They actually trot out the books and show the savings.
The sharp guys over in ASQ dropped the Lean buzzword and called themselves "Advanced Manufacturing" when they (we - I belong to that Division, among others) created a new Division.
It is all in marketing and perception. Marketing can be a fun activity all by itself.
There are "some" things to criticize in the Lean tool bag, especially the part where we gloss over the fact somebody in the supply chain ultimately has to hold inventory because the production lead time would foul up the rest of a Lean chain.
__________________
"Few minds wear out; more rust out"
Inscribed over the entrance of Louis Pasteur School, Chicago
Christian Nestell Bovee (1820-1904) in Thoughts, Feelings and Fancies, 1857
|

16th March 2005, 11:12 AM
|
 |
Deming Disciple
Registration Date: Feb 2004
Location: Aiken, SC
|
|
Posts: 1,471
Thanks Given to Others: 60
Thanked 402 Times in 240 Posts
Karma Power: 190
|
|
Here are the reasons I think Lean has not been attacked as Six Sigma was:
1. It is a set of tools. Tools for optimizing inventory levels have been around for a long time.
2. It is described in open literature. You don't have to pay megabucks to learn "lean". (Learning about lean is lean)
3. It uses existing Operations Research and Industrial Engineering principles, and doesn't sell itself as a replacement for OR and IE.
4. It has not tried to create a bunch of "belts" a new class of people to replace managers and engineers.
5. It has not been sold as "instant pudding" - most literature is good at documenting the pluses and minuses of lean.
6. It doesn't have a Mikel Harry.
__________________
Steve Prevette
"A Passionate Statistician", ASQ CQE, Fluor Government Group
The opinion stated above does not necessarily reflect that of my employer.
|

16th March 2005, 12:32 PM
|
 |
Super Moderator
Registration Date: Apr 2004
Location: Fremont, California
|
|
Posts: 546
Thanks Given to Others: 13
Thanked 36 Times in 35 Posts
Karma Power: 50
|
|
Having read 3 real busy Six sigma threads in this forum and elsewhere..I understand the frustration of critics on Six sigma is
not as a Quality Methodology,
not the Tool box,
not the Body of Knowledge ,
not as a breakthrough Improvement technique.
Critics are frustrated of the poor implementation, big bucks training, highly paid consultants and may be..just may be.. high expectations created from implementing organizations that they saved millions of $$$$.
These are weakness in implementation strategy by the respective organizations. These are not the fault of the Methodology or flaw in Six sigma.
I admit, the missing link in Six sigma is "lack of a standard approach" including BOK - one might call this advantage on flexibility to be optimistic or lack of consistency if critical.
Perception has made Six sigma look like an "Instant pudding". Many organization use the same methodology and tool box and approach and call by different name to defeat such perceptions.
As a note, Lean also has belt certifications (not as popular as Six sigma). Lean learning through reputed organizations are equally as expensive as Six sigma.
People pay bucks to learn Six sigma BB BOK to increase their marketability, enhance their skills. If one is competent enough to take the exam without going the expensive training, they can.
Regards,
Govind.
|

16th March 2005, 12:45 PM
|
 |
Deming Disciple
Registration Date: Feb 2004
Location: Aiken, SC
|
|
Posts: 1,471
Thanks Given to Others: 60
Thanked 402 Times in 240 Posts
Karma Power: 190
|
|
Quote:
|
Originally Posted by Govind
Critics are frustrated of the poor implementation, big bucks training, highly paid consultants and may be..just may be.. high expectations created from implementing organizations that they saved millions of $$$$.
|
Well, actually I do have some technical issues with Six Sigma:
1. The 1.5 sigma shift. Proper use of SPC will detect change well before a 1.5 sigma shift.
2. The reliance on numerical targets to determine if you are six sigma capable (anti Deming 14 points)
3. The reliance on short term gains and visible data
4. Elimination of defects does not imply that what you have left is an optimal, good system
5. The lack of system thinking - the stove piping of results without attention to interactions.
6. The reliance on "control" (DMAIC) rather than improvement cycles (PDSA)
These "faults" I believe are inherent to the Six Sigma BOK.
__________________
Steve Prevette
"A Passionate Statistician", ASQ CQE, Fluor Government Group
The opinion stated above does not necessarily reflect that of my employer.
|

16th March 2005, 03:25 PM
|
 |
Courtesy Access
Registration Date: Jan 2005
Location: Southeast Wisconsin
Age: 57
|
|
Posts: 9,204
Thanks Given to Others: 755
Thanked 2,290 Times in 1,544 Posts
Karma Power: 611
|
|
Quote:
|
Originally Posted by Steve Prevette
The 1.5 sigma shift. Proper use of SPC will detect change well before a 1.5 sigma shift..
|
 Yes!! The fundamental fallacy of SS lies in the fact that by emphasizing the 1.5 sigma shift, SS gurus demonstrate that they have no clue about what is actually happening hour-to-hour on a busy production floor. In fact, I'll take it a step further--most times, the fact that something fishy is going on will be discovered before SPC (i.e., control charting) is done. That is to say, operators don't need to plot a point outside the control limits in order to know something's wrong, or headed that way.
__________________
Some men are born mediocre, some men achieve mediocrity, and some men have mediocrity thrust upon them.-- Joseph Heller
|

16th March 2005, 03:36 PM
|
 |
Heretical Statistician
Registration Date: Jan 2003
Location: New England
|
|
Posts: 1,134
Thanks Given to Others: 265
Thanked 516 Times in 340 Posts
Karma Power: 137
|
|
Actually Steve - the technical issues that you have described are the 'invention' of Mikel Harry and are not what six sigma is about at all. (unfortunately, there are numerous hacks who are way richer than you or me who have perpetuated these myths. You are correct that peopel who chooes this path will have great powerpoint presentations but they won't be on the path to six sigma which is really about neve ending evolutinary, revolutionary and breakthrough improvements. The 1.5 sigma shift is never discussed by anyone but PR hacks who really dont' know anything about six sigma. The same can be said about each of your points. well made but only true for those who dont' know what six sigma is - and Mikel Harry never had a clue, just a good marketing idea. For example the DMAIC cycle is a cycle. once you have achieved improvement and put PROCESS CONTROLS in place you start again at the beginnig to make more improvements...just because PDSA isn't specifically articulated doen't mean it isn't done.
|

16th March 2005, 03:40 PM
|
 |
Deming Disciple
Registration Date: Feb 2004
Location: Aiken, SC
|
|
Posts: 1,471
Thanks Given to Others: 60
Thanked 402 Times in 240 Posts
Karma Power: 190
|
|
Quote:
|
Originally Posted by Bev D
Actually Steve . . .
|
I agree. If you do go back to what six sigma originally was - the answer to the question of what is the "best" level and variability to operate at when faced with a bunch of specifications, six sigma (a CpK of 2) is certainly a viable and likely answer.
Just as lean is a good answer for some folks as to what is the "best" level of inventory and work in progress to carry. (Tieing this back to the original point of the thread).
__________________
Steve Prevette
"A Passionate Statistician", ASQ CQE, Fluor Government Group
The opinion stated above does not necessarily reflect that of my employer.
|
Lower Navigation Bar
|
|
|
|
Visitors Currently Viewing this Thread: 1 (0 Registered Visitors and 1 Unregistered Guests)
|
|
|
| Thread Tools |
Search this Thread |
|
|
|
| Display Modes |
Rate Thread Content |
Linear Mode
|
|
Posting Settings
|
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts
HTML code is Off
|
|
|
|
|