Incoming (Receiving) Inspection - Is it really necessary that we follow the AQL?
> Sir,
>
> i would like to know if we can use 5 pieces per lot during inspection instead
> of using AQL? what would be the possible advantages and the disadvantages of
> using the "5 piece-inspection"?
>
> is it really necessary that we follow the AQL in the inspection process? or
> can we define the sampling size depending on our company's decision?
>
> thank you.
> libie
|

21st March 2005, 01:54 PM
|
 |
True Artisan
Registration Date: Aug 2003
Location: Salt Lake City, Utah, USA
Age: 43
|
|
Posts: 499
Thanks Given to Others: 34
Thanked 102 Times in 82 Posts
Karma Power: 52
|
|
The first question I have is: Whose AQL are we talking about?
The supplier's? You don't have to use a supplier's AQL, but it helps to know how they inspect their products.
A customer's? Is the customer requiring a certain level of inspection? If so, this is a question for them.
Your own? Why have an inspection process if you don't want to follow it? Change it to what you want to do, but I'd have ample justification in case a customer or regulator asks why it was changed.
__________________
I don't have a solution, but I admire your problem. -- Steven Wright
I'm a moderator here, so if you need help with something, feel free to ask.
|

21st March 2005, 08:48 PM
|
|
Inactive Registered Visitor
Registration Date: Mar 2005
Location: Philippines
|
|
Posts: 2
Thanks Given to Others: 0
Thanked 0 Times in 0 Posts
Karma Power: 19 Karma: 10 
|
|
Incoming (Receiving) Inspection
thank you for the reply...
it is the AQL stated in the JIS (Japanese International Standard).
sir, if we would be having our own sample size for inspection, what would be the possible justifications? i have here some ideas wherein i can get some justifications: 1. history of nonconformanaces, 2. documented procedures (we can change it to 5 pcs/lot), 3. process capability, 4. costs, 5. we have existing supplier audits. sir, what would be the other items to be be considered so that we would have objective evidence during the surveillance audit.
Last edited by Libie; 21st March 2005 at 09:05 PM.
Reason: Added item #5
|

21st March 2005, 09:08 PM
|
 |
Involved - Posts
Registration Date: Apr 2001
Location: Cincinnati, Ohio
Age: 54
|
|
Posts: 618
Thanks Given to Others: 56
Thanked 59 Times in 31 Posts
Karma Power: 95
|
|
Quote:
|
Originally Posted by Libie
thank you for the reply...
it is the AQL stated in the JIS (Japanese International Standard).
sir, if we would be having our own sample size for inspection, what would be the possible justifications? i have here some ideas wherein i can get some justifications: 1. history of nonconformanaces, 2. documented procedures (we can change it to 5 pcs/lot), 3. process capability, 4. costs. sir, what would be the other items to be be considered so that we would have objective evidence during the surveillance audit.
|
The points you stated should be ample justification for the change. If the history of the incoming product is good enough, your wasting your time inspecting more.
Just make sure you address what happens if there is a drop in the quality of the incoming product. i.e. sampling goes up, and suspect product rechecked etc.
James
__________________
Low tech is better than no tech.
The only constant is those who declare, "Things around here will never change!!"
|

22nd March 2005, 12:39 PM
|
 |
Inactive Registered Visitor
Registration Date: Feb 2004
Location: New England
|
|
Posts: 245
Thanks Given to Others: 1
Thanked 0 Times in 0 Posts
Karma Power: 31 Karma: 152  
|
|
sounds like you have enough controls in place to not take out rec. inspection completely.
|

22nd March 2005, 01:10 PM
|
 |
Thaumaturge
Registration Date: May 2003
Location: Utah
|
|
Posts: 2,416
Thanks Given to Others: 377
Thanked 838 Times in 460 Posts
Karma Power: 206
|
|
If you are going to do sampling inspection, you need to understand what sampling plans are all about. A blanket 5 piece per lot inspection is probably not going to achieve anything of real value. Here's a link to a fairly good article about sampling that may answer a few questions:
http://www.variation.com/techlib/as-7.html
|
|
Thanks to howste for your informative Post and/or Attachment!
|
|

22nd March 2005, 02:13 PM
|
 |
Heretical Statistician
Registration Date: Jan 2003
Location: New England
|
|
Posts: 1,134
Thanks Given to Others: 265
Thanked 516 Times in 340 Posts
Karma Power: 137
|
|
If you are only concerned with a sampling plan that is 'acceptable' to an ISO9000 auditor - you can use anything you want. as long as you can rationalize it and (in the case of incoming inspection) that you satisfy the requirements for supplier controls. (I've worked at companies where there was virtually no incoming inspection and it can work if you are controlling your suppliers.)
On the other hand - if your customer has specific requirements - you need to satisfy them.
from a technical perspective, a blanket sampel size of n=5 is not effective. When dealign with categorical data (pass fail) 5 is no where near enough - you might as well do none. If dealign with continous data and you have performed the appropriate capability studies, 5 may well be enough to detect a shift or trend in the data - as long as you continue to use continous data.
|

23rd August 2007, 09:23 AM
|
|
Involved in Discussions
Registration Date: Jul 2006
Location: india
Age: 30
|
|
Posts: 58
Thanks Given to Others: 1
Thanked 1 Time in 1 Post
Karma Power: 15 Karma: 15 
|
|
Re: Incoming (Receiving) Inspection - Is it really necessary that we follow the AQL?
First of all, 5 pic. per lot ........
1) Its totally depand upon lot size. U canot only inspect 5 pic from 20,0000 pic its 00025% of inward
2) As from u will find 5 pic inspection just as an case find out allpha & beta error. Its too risky for buyer as well as supplier.
When u use AQL or AOQ their is Logic behind that that u must understand.
|
Lower Navigation Bar
|
|
|
|
Visitors Currently Viewing this Thread: 1 (0 Registered Visitors and 1 Unregistered Guests)
|
|
|
| Thread Tools |
Search this Thread |
|
|
|
| Display Modes |
Rate Thread Content |
Linear Mode
|
|
Posting Settings
|
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts
HTML code is Off
|
|
|
|
|