The Elsmar Cove Forum and Site Map The Elsmar Cove Wiki More Free Files The Elsmar Cove Forums Discussion Thread Index Post Attachments Listing Failure Modes Services and Solutions to Problems Elsmar cove Forums Main Page Elsmar Cove Home Page

Go Back   The Elsmar Cove Forum > Common Quality Assurance Processes and Tools > Inspection and Test, Sampling and Related Topics > AQL - Acceptable Quality Level


The Elsmar Cove Forum SideBar!
Monitor the Forum
Monitor New Forum Posts
New Threads Feeds
RSS FeedRSS Feed
Sponsor Link










$ Contributor Forum Access
Courtesy Quick Links

Links that Elsmar Cove visitors will find useful in your quest for knowledge:


Howard's International Quality Services

Atul's Symphony Technologies

Dave Scott's Scott Quality Solutions

Praxiom Research Group


NIST's Engineering Statistics Handbook

IRCA - International Register of Certified Auditors

SAE - Society of Automotive Engineers

Quality Digest Portal

IEST - Institute of Environmental Sciences and Technology

ASQ - American Society for Quality


All the Important Standards and Related Web Sites in the World
Reply
 
Thread Tools Search this Thread Rate Thread Content Display Modes
  #1  
Old 21st March 2005, 04:51 AM
Libie Libie is offline
Inactive Registered Visitor

Registration Date: Mar 2005
Location: Philippines
 
Posts: 2
Thanks Given to Others: 0
Thanked 0 Times in 0 Posts
Karma Power: 19
Karma: 10
Libie has less than 100 Karma points so far.
Please Help! Incoming (Receiving) Inspection - Is it really necessary that we follow the AQL?

> Sir,
>
> i would like to know if we can use 5 pieces per lot during inspection instead
> of using AQL? what would be the possible advantages and the disadvantages of
> using the "5 piece-inspection"?
>
> is it really necessary that we follow the AQL in the inspection process? or
> can we define the sampling size depending on our company's decision?
>
> thank you.
> libie
Reply With Quote

Sponsored Links
  #2  
Old 21st March 2005, 01:54 PM
Scott Catron's Avatar
Scott Catron Scott Catron is offline
True Artisan

Registration Date: Aug 2003
Location: Salt Lake City, Utah, USA
Age: 43
 
Posts: 499
Thanks Given to Others: 34
Thanked 102 Times in 82 Posts
Blog Entries: 1
Karma Power: 52
Karma: 850
Scott Catron is appreciated, and has over 700 Karma points.Scott Catron is appreciated, and has over 700 Karma points.Scott Catron is appreciated, and has over 700 Karma points.Scott Catron is appreciated, and has over 700 Karma points.Scott Catron is appreciated, and has over 700 Karma points.Scott Catron is appreciated, and has over 700 Karma points.Scott Catron is appreciated, and has over 700 Karma points.
Question

The first question I have is: Whose AQL are we talking about?

The supplier's? You don't have to use a supplier's AQL, but it helps to know how they inspect their products.

A customer's? Is the customer requiring a certain level of inspection? If so, this is a question for them.

Your own? Why have an inspection process if you don't want to follow it? Change it to what you want to do, but I'd have ample justification in case a customer or regulator asks why it was changed.
__________________
I don't have a solution, but I admire your problem. -- Steven Wright
I'm a moderator here, so if you need help with something, feel free to ask.
Reply With Quote
Sponsored Links

  #3  
Old 21st March 2005, 08:48 PM
Libie Libie is offline
Inactive Registered Visitor

Registration Date: Mar 2005
Location: Philippines
 
Posts: 2
Thanks Given to Others: 0
Thanked 0 Times in 0 Posts
Karma Power: 19
Karma: 10
Libie has less than 100 Karma points so far.
Default Incoming (Receiving) Inspection

thank you for the reply...

it is the AQL stated in the JIS (Japanese International Standard).

sir, if we would be having our own sample size for inspection, what would be the possible justifications? i have here some ideas wherein i can get some justifications: 1. history of nonconformanaces, 2. documented procedures (we can change it to 5 pcs/lot), 3. process capability, 4. costs, 5. we have existing supplier audits. sir, what would be the other items to be be considered so that we would have objective evidence during the surveillance audit.

Last edited by Libie; 21st March 2005 at 09:05 PM. Reason: Added item #5
Reply With Quote
  #4  
Old 21st March 2005, 09:08 PM
JRKH's Avatar
JRKH JRKH is offline
Involved - Posts

Registration Date: Apr 2001
Location: Cincinnati, Ohio
Age: 54
 
Posts: 618
Thanks Given to Others: 56
Thanked 59 Times in 31 Posts
Karma Power: 95
Karma: 2397
JRKH is appreciated, and has over 1700 Karma points.JRKH is appreciated, and has over 1700 Karma points.JRKH is appreciated, and has over 1700 Karma points.JRKH is appreciated, and has over 1700 Karma points.JRKH is appreciated, and has over 1700 Karma points.JRKH is appreciated, and has over 1700 Karma points.JRKH is appreciated, and has over 1700 Karma points.JRKH is appreciated, and has over 1700 Karma points.JRKH is appreciated, and has over 1700 Karma points.JRKH is appreciated, and has over 1700 Karma points.JRKH is appreciated, and has over 1700 Karma points.JRKH is appreciated, and has over 1700 Karma points.JRKH is appreciated, and has over 1700 Karma points.
Default

Quote:
Originally Posted by Libie

thank you for the reply...

it is the AQL stated in the JIS (Japanese International Standard).

sir, if we would be having our own sample size for inspection, what would be the possible justifications? i have here some ideas wherein i can get some justifications: 1. history of nonconformanaces, 2. documented procedures (we can change it to 5 pcs/lot), 3. process capability, 4. costs. sir, what would be the other items to be be considered so that we would have objective evidence during the surveillance audit.
The points you stated should be ample justification for the change. If the history of the incoming product is good enough, your wasting your time inspecting more.
Just make sure you address what happens if there is a drop in the quality of the incoming product. i.e. sampling goes up, and suspect product rechecked etc.

James
__________________
Low tech is better than no tech.

The only constant is those who declare, "Things around here will never change!!"
Reply With Quote
  #5  
Old 22nd March 2005, 12:39 PM
cncmarine's Avatar
cncmarine cncmarine is offline
Inactive Registered Visitor

Registration Date: Feb 2004
Location: New England
 
Posts: 245
Thanks Given to Others: 1
Thanked 0 Times in 0 Posts
Karma Power: 31
Karma: 152
cncmarine is appreciated, and has over 100 Karma points.cncmarine is appreciated, and has over 100 Karma points.
Default

sounds like you have enough controls in place to not take out rec. inspection completely.
Reply With Quote
  #6  
Old 22nd March 2005, 01:10 PM
howste's Avatar
howste howste is offline
Thaumaturge

Registration Date: May 2003
Location: Utah
 
Posts: 2,416
Thanks Given to Others: 377
Thanked 838 Times in 460 Posts
Karma Power: 206
Karma: 6556
howste is appreciated, and has over 1700 Karma points.howste is appreciated, and has over 1700 Karma points.
howste is appreciated, and has over 1700 Karma points.howste is appreciated, and has over 1700 Karma points.howste is appreciated, and has over 1700 Karma points.howste is appreciated, and has over 1700 Karma points.howste is appreciated, and has over 1700 Karma points.howste is appreciated, and has over 1700 Karma points.
Default

If you are going to do sampling inspection, you need to understand what sampling plans are all about. A blanket 5 piece per lot inspection is probably not going to achieve anything of real value. Here's a link to a fairly good article about sampling that may answer a few questions:
http://www.variation.com/techlib/as-7.html
Reply With Quote
Thanks to howste for your informative Post and/or Attachment!
  #7  
Old 22nd March 2005, 02:13 PM
Bev D's Avatar
Bev D Bev D is offline
Heretical Statistician

Registration Date: Jan 2003
Location: New England
 
Posts: 1,134
Thanks Given to Others: 265
Thanked 516 Times in 340 Posts
Karma Power: 137
Karma: 4352
Bev D is appreciated, and has over 1700 Karma points.
Bev D is appreciated, and has over 1700 Karma points.Bev D is appreciated, and has over 1700 Karma points.Bev D is appreciated, and has over 1700 Karma points.Bev D is appreciated, and has over 1700 Karma points.Bev D is appreciated, and has over 1700 Karma points.Bev D is appreciated, and has over 1700 Karma points.Bev D is appreciated, and has over 1700 Karma points.Bev D is appreciated, and has over 1700 Karma points.Bev D is appreciated, and has over 1700 Karma points.Bev D is appreciated, and has over 1700 Karma points.
Default

If you are only concerned with a sampling plan that is 'acceptable' to an ISO9000 auditor - you can use anything you want. as long as you can rationalize it and (in the case of incoming inspection) that you satisfy the requirements for supplier controls. (I've worked at companies where there was virtually no incoming inspection and it can work if you are controlling your suppliers.)

On the other hand - if your customer has specific requirements - you need to satisfy them.

from a technical perspective, a blanket sampel size of n=5 is not effective. When dealign with categorical data (pass fail) 5 is no where near enough - you might as well do none. If dealign with continous data and you have performed the appropriate capability studies, 5 may well be enough to detect a shift or trend in the data - as long as you continue to use continous data.
Reply With Quote
  #8  
Old 23rd August 2007, 09:23 AM
sushant_kulkarni sushant_kulkarni is offline
Involved in Discussions

Registration Date: Jul 2006
Location: india
Age: 30
 
Posts: 58
Thanks Given to Others: 1
Thanked 1 Time in 1 Post
Karma Power: 15
Karma: 15
sushant_kulkarni has less than 100 Karma points so far.
Default Re: Incoming (Receiving) Inspection - Is it really necessary that we follow the AQL?

First of all, 5 pic. per lot ........

1) Its totally depand upon lot size. U canot only inspect 5 pic from 20,0000 pic its 00025% of inward

2) As from u will find 5 pic inspection just as an case find out allpha & beta error. Its too risky for buyer as well as supplier.

When u use AQL or AOQ their is Logic behind that that u must understand.
Reply With Quote
Reply

Lower Navigation Bar
Go Back   The Elsmar Cove Forum > Common Quality Assurance Processes and Tools > Inspection and Test, Sampling and Related Topics > AQL - Acceptable Quality Level

Bookmarks


Visitors Currently Viewing this Thread: 1 (0 Registered Visitors and 1 Unregistered Guests)
 
Thread Tools Search this Thread
Search this Thread:

Advanced Forum Search
Display Modes Rate Thread Content
Rate Thread Content:

Posting Settings
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump

Similar Discussion Threads
Discussion Thread Title Thread Starter Forum Replies Last Post or Poll Vote
Critical Characteristics in Incoming (Receiving) Inspection - Inspection Levels luciano Inspection and Test, Sampling and Related Topics 14 20th October 2009 01:54 AM
Incoming Receiving Inspection from Sister Plant spalomino ISO/TS 16949 - International Automotive Quality Systems Standard 7 22nd July 2009 03:49 AM
Incoming (Receiving) Inspection of SMT components MANATEC Inspection and Test, Sampling and Related Topics 4 30th April 2009 12:18 AM
Is AQL necessary for ISO 9001 receiving inspection? luciano AQL - Acceptable Quality Level 24 23rd August 2007 09:14 AM
Incoming Receiving Inspection Form KidPaddy Documentation Control Systems, Procedures, Forms and Templates 6 8th February 2007 01:14 AM



The time now is 02:58 AM. All times are GMT -4.
The time zone can be changed in your UserCP --> Options.



   

All Y'All Come Back Now, Y' Hear?

Made With A Mac! FreeBSD OS Powered by Apache!
Using php4 Forums provided and maintained by Marc Smith Database by MySQL

FAIR USE and CORRECTNESS NOTICE: This site contains copyrighted material the use of which has not always been specifically authorized by the copyright owner. We are making such material available in our efforts to advance understanding of environmental, political, human rights, economic, democracy, scientific, and social justice issues, etc. We believe herein constitutes a 'fair use' of any such copyrighted material as provided for in section 107 of the US Copyright Law. In accordance with Title 17 U.S.C. Section 107, the material on this site is distributed without profit to those who have expressed a prior interest in receiving the included information for research and educational purposes. For more information go to: http://www.law.cornell.edu/uscode/17/ If you wish to use copyrighted material from this site for purposes of your own that go beyond 'fair use', you must obtain permission from the copyright owner. In addition, I do not guarantee the correctness of the content. The risk of using content from the Elsmar Cove web site and forums remains with the user/visitor.

Responsibility Statement: Each person is responsible for anything they post in the Elsmar Cove forum. Neither I, Marc Timothy Smith, nor any of the forum Moderators, are responsible for the content of posts people make. Liability for post content resides with the poster as does interpretation and/or acceptance and/or use of advice by the reader.

Complaints: If you have a complaint with a post in a forum discussion thread, including Content in general, fighting, flaming, copyright infringement, defamation and/or 'slander', please use the 'Report This Post Report This Post Button button which appears at the top of every post in every thread.

Site courtesy of:
Marc Timothy Smith - Cayman Business Systems, 8466 Lesourdsville-West Chester Road, West Chester, Ohio 45069-1929 - USA
(513) 341-6272

To contact me, click the Google Voice link below, enter Your Name and Your Phone Number and Google will ring your phone and connect you for free!

The Elsmar Cove Web Site is *CopyFree*
no new posts