The Elsmar Cove Forum and Site Map The Elsmar Cove Wiki More Free Files The Elsmar Cove Forums Discussion Thread Index Post Attachments Listing Failure Modes Services and Solutions to Problems Elsmar cove Forums Main Page Elsmar Cove Home Page

Go Back   The Elsmar Cove Forum > Common Quality Assurance Processes and Tools > Capability, Accuracy and Stability - Process, Machine, etc.


The Elsmar Cove Forum SideBar!
Monitor the Forum
Monitor New Forum Posts
New Threads Feeds
RSS FeedRSS Feed
Sponsor Link










$ Contributor Forum Access
Courtesy Quick Links

Links that Elsmar Cove visitors will find useful in your quest for knowledge:


Howard's International Quality Services

Atul's Symphony Technologies

Dave Scott's Scott Quality Solutions

Praxiom Research Group


NIST's Engineering Statistics Handbook

IRCA - International Register of Certified Auditors

SAE - Society of Automotive Engineers

Quality Digest Portal

IEST - Institute of Environmental Sciences and Technology

ASQ - American Society for Quality


All the Important Standards and Related Web Sites in the World
Reply
 
Thread Tools Search this Thread Rate Thread Content Display Modes
  #1  
Old 28th April 2005, 11:35 AM
DJN DJN is offline
E-Mails Invalid or Rejected

Registration Date: Jul 2002
Location: Northampton, England
Age: 66
 
Posts: 48
Thanks Given to Others: 0
Thanked 0 Times in 0 Posts
Karma Power: 0
Karma: 10
DJN has less than 100 Karma points so far.
Question Is it possible to have a process that is too good? Cpk is 14.63

Is it possible to have a process that is too good. The reason I ask, is that I have conducted a stability study on a gauge. The Xbar chart shows points out of control. The mean is 36.007. The UCL is 36.014 and the LCL is 36.001 The rbar is .011 and the specification limits are 36.000±.2 I also get a CPk figure of 14.63!! Which I know is invalid if the process is not in control. The range chart is in control. I am mystified as to why the chart would indicate that the process is not stable. Perhaps someone can enlighten me.
Reply With Quote

Sponsored Links
  #2  
Old 28th April 2005, 12:06 PM
Jim Wynne's Avatar
Jim Wynne Jim Wynne is offline
Courtesy Access

Registration Date: Jan 2005
Location: Southeast Wisconsin
Age: 57
 
Posts: 9,210
Thanks Given to Others: 755
Thanked 2,292 Times in 1,546 Posts
Karma Power: 611
Karma: 20375
Jim Wynne is appreciated, and has over 1700 Karma points.Jim Wynne is appreciated, and has over 1700 Karma points.
Jim Wynne is appreciated, and has over 1700 Karma points.Jim Wynne is appreciated, and has over 1700 Karma points.Jim Wynne is appreciated, and has over 1700 Karma points.Jim Wynne is appreciated, and has over 1700 Karma points.Jim Wynne is appreciated, and has over 1700 Karma points.Jim Wynne is appreciated, and has over 1700 Karma points.Jim Wynne is appreciated, and has over 1700 Karma points.Jim Wynne is appreciated, and has over 1700 Karma points.Jim Wynne is appreciated, and has over 1700 Karma points.Jim Wynne is appreciated, and has over 1700 Karma points.Jim Wynne is appreciated, and has over 1700 Karma points.Jim Wynne is appreciated, and has over 1700 Karma points.Jim Wynne is appreciated, and has over 1700 Karma points.
Default

Quote:
Originally Posted by DJN

I am mystified as to why the chart would indicate that the process is not stable.
We have no way of knowing why you have points beyond the control limits. What are you measuring? Do you see similar problems in the process data?
__________________
Some men are born mediocre, some men achieve mediocrity, and some men have mediocrity thrust upon them.-- Joseph Heller
Reply With Quote
Sponsored Links

  #3  
Old 28th April 2005, 12:34 PM
QChas QChas is offline
Involved - Posts

Registration Date: Mar 2005
Location: Pennsylvania
 
Posts: 65
Thanks Given to Others: 0
Thanked 3 Times in 2 Posts
Karma Power: 27
QChas has disabled his/her Karma.
Default

Yes - We cut wire to length using an automatic machine. The machine was very repeatable and having a product spec of +/- 1/2" didn't hurt either. We had CPK's in the 70 - 80 range. After a few years we backed off on our frequncy of measurements. Never had a problem with this number from the customer or the auditor (once they understood the process)
__________________
:cool:
Reply With Quote
  #4  
Old 28th April 2005, 12:38 PM
martin elliott martin elliott is offline
Involved - Posts

Registration Date: Jul 2003
Location: England
 
Posts: 67
Thanks Given to Others: 8
Thanked 3 Times in 3 Posts
Karma Power: 30
Karma: 180
martin elliott is appreciated, and has over 100 Karma points.martin elliott is appreciated, and has over 100 Karma points.
Default It does effect GR&Rpv

Quote:
Originally Posted by DJN

Is it possible to have a process that is too good. The reason I ask, is that I have conducted a stability study on a gauge. The Xbar chart shows points out of control. The mean is 36.007. The UCL is 36.014 and the LCL is 36.001 The rbar is .011 and the specification limits are 36.000±.2 I also get a CPk figure of 14.63!! Which I know is invalid if the process is not in control. The range chart is in control. I am mystified as to why the chart would indicate that the process is not stable. Perhaps someone can enlighten me.
I don't know about effecting stability but it does effect GR&Rpv.

For example I recently improved a process very significantly 1.8 to 6+. GR&Rpv on new process failed because I cant improve the gauge enough for the drop in the process range value, needless to say I applied common sense MSA Page 23, and told my customer regarding cost effectiveness of improvements MSA Page 46

Martin
Older not wiser
Reply With Quote
  #5  
Old 28th April 2005, 12:45 PM
qualeety's Avatar
qualeety qualeety is offline
Involved - Posts

Registration Date: Feb 2005
Location: toronto, ontario, canada
 
Posts: 188
Thanks Given to Others: 8
Thanked 0 Times in 0 Posts
Karma Power: 27
Karma: 204
qualeety is appreciated, and has over 200 Karma points.qualeety is appreciated, and has over 200 Karma points.qualeety is appreciated, and has over 200 Karma points.
Send a message via MSN to qualeety
Default

The problem i see is in your measurement system. Instead of measuring to 1/1000th of an inch, try to round off to 1/100th of an inch. Your chart will be more stable and in-control.

Remember, out of control condition includes other unusual patterns (runs, cycles, etc), not just points beyond the control limits.
Reply With Quote
  #6  
Old 28th April 2005, 01:27 PM
Bev D's Avatar
Bev D Bev D is offline
Heretical Statistician

Registration Date: Jan 2003
Location: New England
 
Posts: 1,134
Thanks Given to Others: 265
Thanked 516 Times in 340 Posts
Karma Power: 137
Karma: 4352
Bev D is appreciated, and has over 1700 Karma points.
Bev D is appreciated, and has over 1700 Karma points.Bev D is appreciated, and has over 1700 Karma points.Bev D is appreciated, and has over 1700 Karma points.Bev D is appreciated, and has over 1700 Karma points.Bev D is appreciated, and has over 1700 Karma points.Bev D is appreciated, and has over 1700 Karma points.Bev D is appreciated, and has over 1700 Karma points.Bev D is appreciated, and has over 1700 Karma points.Bev D is appreciated, and has over 1700 Karma points.Bev D is appreciated, and has over 1700 Karma points.
Default

Did you do a gauge R&R study and plot the numbers on the control chart? Such that the range data is the range of the repeated measures of the same unit and the average values are the averages of the repeated measurements of each part?

If so - this would give you in control range values and a lot of 'out of control' averages...because you are calcualting the control limits from the average range which would be very tight if your gauge is reasonable. Then the averages are from PARTS wich vary greatly from each other - in comparison to the difference between repeated measures of the same parts...

Also, depending on your software or formula choice - if you calculated the traditional Cpk value (as opposed to the Ppk value) you would have used the within subgroup standard deviation which comes from the range of the repeated measures...again this woulg give you a very small standard deviation compared to your spec limits...
Reply With Quote
  #7  
Old 28th April 2005, 03:46 PM
Randy Stewart's Avatar
Randy Stewart Randy Stewart is offline
VINI, VIDI, DORMIVI

Registration Date: Feb 2002
Location: Walled Lake, Michigan
 
Posts: 1,153
Thanks Given to Others: 20
Thanked 79 Times in 51 Posts
Karma Power: 84
Karma: 1481
Randy Stewart is appreciated, and has over 1300 Karma points.Randy Stewart is appreciated, and has over 1300 Karma points.Randy Stewart is appreciated, and has over 1300 Karma points.Randy Stewart is appreciated, and has over 1300 Karma points.Randy Stewart is appreciated, and has over 1300 Karma points.Randy Stewart is appreciated, and has over 1300 Karma points.Randy Stewart is appreciated, and has over 1300 Karma points.Randy Stewart is appreciated, and has over 1300 Karma points.Randy Stewart is appreciated, and has over 1300 Karma points.Randy Stewart is appreciated, and has over 1300 Karma points.
Default

Quote:
The problem i see is in your measurement system.
I have to agree, it's like you are trying to measure a klick using a meter stick while gauging errors in centimeters. Reduce the accuracy of the gage or tighten up the UCL & LCL.
__________________
"What this country needs is more unemployed politicians." Edward Langley
Reply With Quote
  #8  
Old 29th April 2005, 03:15 AM
Claes Gefvenberg's Avatar
Claes Gefvenberg Claes Gefvenberg is offline
Forum Administrator

Registration Date: May 2000
Location: Eskilstuna, Sweden
Age: 49
 
Posts: 3,771
Thanks Given to Others: 246
Thanked 244 Times in 172 Posts
Blog Entries: 13
Karma Power: 213
Karma: 4951
Claes Gefvenberg is appreciated, and has over 1700 Karma points.
Claes Gefvenberg is appreciated, and has over 1700 Karma points.Claes Gefvenberg is appreciated, and has over 1700 Karma points.Claes Gefvenberg is appreciated, and has over 1700 Karma points.Claes Gefvenberg is appreciated, and has over 1700 Karma points.Claes Gefvenberg is appreciated, and has over 1700 Karma points.Claes Gefvenberg is appreciated, and has over 1700 Karma points.Claes Gefvenberg is appreciated, and has over 1700 Karma points.Claes Gefvenberg is appreciated, and has over 1700 Karma points.Claes Gefvenberg is appreciated, and has over 1700 Karma points.Claes Gefvenberg is appreciated, and has over 1700 Karma points.Claes Gefvenberg is appreciated, and has over 1700 Karma points.Claes Gefvenberg is appreciated, and has over 1700 Karma points.
Lightbulb Considering the original question...

Is it possible to have a process that is too good? Cpk is over 14

I suppose it is possible: Let's assume you buy top end CNC equipment, and then use it for producing a low spec product you could easily make with an old lathe from 1870 (An extreme case, I know, but just to make an example)?

/Claes
__________________
Hanlon's Razor.
Never attribute to malice that which can be adequately explained by stupidity.
User Groups: Elsmar Cove Cycling Enthusiasts Formula 1 fanatics Photo freaks Readers Corner
Reply With Quote
Reply

Lower Navigation Bar
Go Back   The Elsmar Cove Forum > Common Quality Assurance Processes and Tools > Capability, Accuracy and Stability - Process, Machine, etc.

Bookmarks


Visitors Currently Viewing this Thread: 1 (0 Registered Visitors and 1 Unregistered Guests)
 
Thread Tools Search this Thread
Search this Thread:

Advanced Forum Search
Display Modes Rate Thread Content
Rate Thread Content:

Posting Settings
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump

Similar Discussion Threads
Discussion Thread Title Thread Starter Forum Replies Last Post or Poll Vote
Is Cpk a good measure of capability? There are several shortcomings of Cpk Tim Folkerts Capability, Accuracy and Stability - Process, Machine, etc. 31 12th February 2009 07:39 PM
Quality Control Index - We thought that Cpk or Ppk would be good choices vskiller Capability, Accuracy and Stability - Process, Machine, etc. 6 28th June 2007 12:57 PM
Can CPK be a good manufacturing processor’s quality objective? darkafar Capability, Accuracy and Stability - Process, Machine, etc. 14 22nd March 2007 12:58 PM
How much does Cpk > 1.33 represent in precentage of good pieces? tattva Capability, Accuracy and Stability - Process, Machine, etc. 17 14th November 2003 11:09 AM
Cp and Cpk - Cpk is an index that should be applied to a stable process Don Winton Capability, Accuracy and Stability - Process, Machine, etc. 16 13th August 2001 06:50 PM



The time now is 10:59 PM. All times are GMT -4.
The time zone can be changed in your UserCP --> Options.



   

All Y'All Come Back Now, Y' Hear?

Made With A Mac! FreeBSD OS Powered by Apache!
Using php4 Forums provided and maintained by Marc Smith Database by MySQL

FAIR USE and CORRECTNESS NOTICE: This site contains copyrighted material the use of which has not always been specifically authorized by the copyright owner. We are making such material available in our efforts to advance understanding of environmental, political, human rights, economic, democracy, scientific, and social justice issues, etc. We believe herein constitutes a 'fair use' of any such copyrighted material as provided for in section 107 of the US Copyright Law. In accordance with Title 17 U.S.C. Section 107, the material on this site is distributed without profit to those who have expressed a prior interest in receiving the included information for research and educational purposes. For more information go to: http://www.law.cornell.edu/uscode/17/ If you wish to use copyrighted material from this site for purposes of your own that go beyond 'fair use', you must obtain permission from the copyright owner. In addition, I do not guarantee the correctness of the content. The risk of using content from the Elsmar Cove web site and forums remains with the user/visitor.

Responsibility Statement: Each person is responsible for anything they post in the Elsmar Cove forum. Neither I, Marc Timothy Smith, nor any of the forum Moderators, are responsible for the content of posts people make. Liability for post content resides with the poster as does interpretation and/or acceptance and/or use of advice by the reader.

Complaints: If you have a complaint with a post in a forum discussion thread, including Content in general, fighting, flaming, copyright infringement, defamation and/or 'slander', please use the 'Report This Post Report This Post Button button which appears at the top of every post in every thread.

Site courtesy of:
Marc Timothy Smith - Cayman Business Systems, 8466 Lesourdsville-West Chester Road, West Chester, Ohio 45069-1929 - USA
(513) 341-6272

To contact me, click the Google Voice link below, enter Your Name and Your Phone Number and Google will ring your phone and connect you for free!

The Elsmar Cove Web Site is *CopyFree*
no new posts