The Elsmar Cove Forum and Site Map The Elsmar Cove Wiki More Free Files The Elsmar Cove Forums Discussion Thread Index Post Attachments Listing Failure Modes Services and Solutions to Problems Elsmar cove Forums Main Page Elsmar Cove Home Page

Go Back   The Elsmar Cove Forum > Manufacturing, Service, and Business Systems Processes > Lean - Lean in Manufacturing and Services


The Elsmar Cove Forum SideBar!
Monitor the Forum
Monitor New Forum Posts
New Threads Feeds
RSS FeedRSS Feed
Sponsor Link










$ Contributor Forum Access
Courtesy Quick Links

Links that Elsmar Cove visitors will find useful in your quest for knowledge:


Howard's International Quality Services

Atul's Symphony Technologies

Dave Scott's Scott Quality Solutions

Praxiom Research Group


NIST's Engineering Statistics Handbook

IRCA - International Register of Certified Auditors

SAE - Society of Automotive Engineers

Quality Digest Portal

IEST - Institute of Environmental Sciences and Technology

ASQ - American Society for Quality


All the Important Standards and Related Web Sites in the World
Reply
 
Thread Tools Search this Thread Rate Thread Content Display Modes
  #1  
Old 17th May 2005, 11:25 AM
Jim Howe Jim Howe is offline
E-Mails Invalid or Rejected

Registration Date: Jun 2004
Location: Ohio
 
Posts: 415
Thanks Given to Others: 0
Thanked 2 Times in 2 Posts
Karma Power: 0
Karma: 225
Jim Howe is appreciated, and has over 200 Karma points.Jim Howe is appreciated, and has over 200 Karma points.Jim Howe is appreciated, and has over 200 Karma points.
Question VSM (Value Stream Mapping) - Use constraints or leave 'wide open'?

I previously posted this inquiry at the ASQ lean forum but, thanks to ASQ's restrictive rules, only Wes Bucey responded. I would like to open it up to a much broader audience here at the cove.

Quote:
I have just completed a VSM (Value Stream Mapping) event where the futuristic state was constrained rather then wide open. This was my first VSM that was constrained. I am sorry that I cannot be more specific do to proprietary reasons so suffice it to say that the team was constrained by two caveats that restricted our efforts in two areas.

So my question to the forum contributors is "Is it a good idea to place constraints on the VSM effort or should it be completely wide open?"

For discussion purposes lets say that you were invited onto the VSM team and were told up front that you cannot consider manpower in your future state.

I have heard good argue ments on both sides. Some suggesting that by placing constraints on the VSM process brings it into the real world which as we all know is full of contraints.

Any one care to enter the discussion?
Reply With Quote

Sponsored Links
  #2  
Old 17th May 2005, 11:59 AM
Jim Wynne's Avatar
Jim Wynne Jim Wynne is online now
Courtesy Access

Registration Date: Jan 2005
Location: Southeast Wisconsin
Age: 57
 
Posts: 9,210
Thanks Given to Others: 755
Thanked 2,290 Times in 1,544 Posts
Karma Power: 611
Karma: 20365
Jim Wynne is appreciated, and has over 1700 Karma points.Jim Wynne is appreciated, and has over 1700 Karma points.
Jim Wynne is appreciated, and has over 1700 Karma points.Jim Wynne is appreciated, and has over 1700 Karma points.Jim Wynne is appreciated, and has over 1700 Karma points.Jim Wynne is appreciated, and has over 1700 Karma points.Jim Wynne is appreciated, and has over 1700 Karma points.Jim Wynne is appreciated, and has over 1700 Karma points.Jim Wynne is appreciated, and has over 1700 Karma points.Jim Wynne is appreciated, and has over 1700 Karma points.Jim Wynne is appreciated, and has over 1700 Karma points.Jim Wynne is appreciated, and has over 1700 Karma points.Jim Wynne is appreciated, and has over 1700 Karma points.Jim Wynne is appreciated, and has over 1700 Karma points.Jim Wynne is appreciated, and has over 1700 Karma points.
Default

Quote:
Originally Posted by Jim Howe

For discussion purposes lets say that you were invited onto the VSM team and were told up front that you cannot consider manpower in your future state.

I have heard good argue ments on both sides. Some suggesting that by placing constraints on the VSM process brings it into the real world which as we all know is full of contraints.
As you suggest, there are two points of view, and neither should be considered exclusive, imo. I've always considered that there are two types of VSM: pragmatic and fantasy. The former considers known constraints and makes the best of what's known to be available (called optimization prior to the introduction of obfuscatory Lean language). The latter attempts a projection of a possible future state and allows for potential ROI calculations. There's no reason why the two can't (or shouldn't be) done concurrently.
__________________
Some men are born mediocre, some men achieve mediocrity, and some men have mediocrity thrust upon them.-- Joseph Heller
Reply With Quote
Sponsored Links

  #3  
Old 17th May 2005, 01:29 PM
Jim Howe Jim Howe is offline
E-Mails Invalid or Rejected

Registration Date: Jun 2004
Location: Ohio
 
Posts: 415
Thanks Given to Others: 0
Thanked 2 Times in 2 Posts
Karma Power: 0
Karma: 225
Jim Howe is appreciated, and has over 200 Karma points.Jim Howe is appreciated, and has over 200 Karma points.Jim Howe is appreciated, and has over 200 Karma points.
Default VSM constraints

Quote:
There's no reason why the two can't (or shouldn't be) done concurrently.
I agree! But we were also under a time constraint. In fact during the presentation the executive team asked what would the future state look like if the constraints were lifted. Our response was that another VSM should be held so that we could focus on a new state without the constraints.
They have taken it under advisement. I will say that without the constraints (IMO) a major break through could have been achieved, but the reality is that major dollars to make the changes would also have been required and is still not out of the question.
Reply With Quote
  #4  
Old 17th May 2005, 03:24 PM
wmarhel wmarhel is offline
Courtesy Access

Registration Date: Oct 2004
Location: DuBois, PA
Age: 39
 
Posts: 612
Thanks Given to Others: 109
Thanked 234 Times in 149 Posts
Karma Power: 94
Karma: 3086
wmarhel is appreciated, and has over 1700 Karma points.
wmarhel is appreciated, and has over 1700 Karma points.
Default

Quote:
Originally Posted by Jim Howe

I have just completed a VSM (Value Stream Mapping) event where the futuristic state was constrained rather then wide open. This was my first VSM that was constrained. I am sorry that I cannot be more specific do to proprietary reasons so suffice it to say that the team was constrained by two caveats that restricted our efforts in two areas.
The purpose of the Future State is to develop the "best case" that can be conceived based on the information collected during your "Current State" exercise.

It is important to remember that the future state is also a roadmap of sorts. I typically include an attachment outlining some of the tasks and/or steps needed to work towards the future state. Placing constraints on a VSM and how the future state is developed is silly in my opinion.

Wayne
Reply With Quote
  #5  
Old 18th May 2005, 01:08 PM
Jim Howe Jim Howe is offline
E-Mails Invalid or Rejected

Registration Date: Jun 2004
Location: Ohio
 
Posts: 415
Thanks Given to Others: 0
Thanked 2 Times in 2 Posts
Karma Power: 0
Karma: 225
Jim Howe is appreciated, and has over 200 Karma points.Jim Howe is appreciated, and has over 200 Karma points.Jim Howe is appreciated, and has over 200 Karma points.
Default vsm constraints

Quote:
Originally Posted by wmarhel

The purpose of the Future State is to develop the "best case" that can be conceived based on the information collected during your "Current State" exercise.

It is important to remember that the future state is also a roadmap of sorts. I typically include an attachment outlining some of the tasks and/or steps needed to work towards the future state. Placing constraints on a VSM and how the future state is developed is silly in my opinion.

Wayne
Thanks Wayne. We also put together a task list with champions and followup dates. There is also another list that we call the parking lot. The parking lot contains issues that came up during the event but were not resolved. these are also passed on to management for future reference and review.
Reply With Quote
  #6  
Old 24th October 2006, 12:56 PM
heasx2004 heasx2004 is offline
Getting Involved (6 to 9 Posts)

Registration Date: Nov 2005
Location: USA,Texas
 
Posts: 8
Thanks Given to Others: 0
Thanked 0 Times in 0 Posts
Karma Power: 17
Karma: 10
heasx2004 has less than 100 Karma points so far.
Default Re: VSM (Value Stream Mapping) - Use constraints or leave 'wide open'?

Does any one has a VSM presentation?
I am working in a company where we are going to start implementing lean concepts and I would like to undestand how to use this tool.
Thanks
Reply With Quote
  #7  
Old 24th October 2006, 02:07 PM
wmarhel wmarhel is offline
Courtesy Access

Registration Date: Oct 2004
Location: DuBois, PA
Age: 39
 
Posts: 612
Thanks Given to Others: 109
Thanked 234 Times in 149 Posts
Karma Power: 94
Karma: 3086
wmarhel is appreciated, and has over 1700 Karma points.
wmarhel is appreciated, and has over 1700 Karma points.
Default Re: VSM (Value Stream Mapping) - Use constraints or leave 'wide open'?

Quote:
Originally Posted by heasx2004 View Post

Does any one has a VSM presentation?
The best reference is "Learning to See".

Here's a presentation I pulled up using the advanced search feature in Google (a really useful feature) and specifying powerpoint files only.

Wayne
Attached Files: 1. Scan for viruses before using, 2. Please report any 'bad' files by Reporting the post it is in, 3. Use at your Own Risk.
File Type: ppt vsm description.ppt (313.5 KB, 448 views)
Reply With Quote
Thanks to wmarhel for your informative Post and/or Attachment!
Reply

Lower Navigation Bar
Go Back   The Elsmar Cove Forum > Manufacturing, Service, and Business Systems Processes > Lean - Lean in Manufacturing and Services

Bookmarks

Tags
constraints, value stream mapping (vsm)


Visitors Currently Viewing this Thread: 1 (0 Registered Visitors and 1 Unregistered Guests)
 
Thread Tools Search this Thread
Search this Thread:

Advanced Forum Search
Display Modes Rate Thread Content
Rate Thread Content:

Posting Settings
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump

Similar Discussion Threads
Discussion Thread Title Thread Starter Forum Replies Last Post or Poll Vote
Need guidance in VSM (Value Stream Mapping) pritishh Lean - Lean in Manufacturing and Services 8 2nd July 2009 12:43 AM
Value Stream Mapping - Can anyone help me in developing a VSM? jericho Lean - Lean in Manufacturing and Services 16 15th April 2009 08:40 AM
Re: Value Stream Mapping (VSM) - Logistics / Transport mitch37 Lean - Lean in Manufacturing and Services 5 1st December 2008 04:46 AM
Time and Motion Study + VSM (Value Stream Mapping) Mayank Trivedi Quality Tools, Improvement and Analysis 5 11th April 2008 09:00 AM
Available (Availability), Uptime and EPE in VSM (Value Stream Mapping) Peters Lean - Lean in Manufacturing and Services 3 25th January 2008 07:18 PM



The time now is 08:23 PM. All times are GMT -4.
The time zone can be changed in your UserCP --> Options.



   

All Y'All Come Back Now, Y' Hear?

Made With A Mac! FreeBSD OS Powered by Apache!
Using php4 Forums provided and maintained by Marc Smith Database by MySQL

FAIR USE and CORRECTNESS NOTICE: This site contains copyrighted material the use of which has not always been specifically authorized by the copyright owner. We are making such material available in our efforts to advance understanding of environmental, political, human rights, economic, democracy, scientific, and social justice issues, etc. We believe herein constitutes a 'fair use' of any such copyrighted material as provided for in section 107 of the US Copyright Law. In accordance with Title 17 U.S.C. Section 107, the material on this site is distributed without profit to those who have expressed a prior interest in receiving the included information for research and educational purposes. For more information go to: http://www.law.cornell.edu/uscode/17/ If you wish to use copyrighted material from this site for purposes of your own that go beyond 'fair use', you must obtain permission from the copyright owner. In addition, I do not guarantee the correctness of the content. The risk of using content from the Elsmar Cove web site and forums remains with the user/visitor.

Responsibility Statement: Each person is responsible for anything they post in the Elsmar Cove forum. Neither I, Marc Timothy Smith, nor any of the forum Moderators, are responsible for the content of posts people make. Liability for post content resides with the poster as does interpretation and/or acceptance and/or use of advice by the reader.

Complaints: If you have a complaint with a post in a forum discussion thread, including Content in general, fighting, flaming, copyright infringement, defamation and/or 'slander', please use the 'Report This Post Report This Post Button button which appears at the top of every post in every thread.

Site courtesy of:
Marc Timothy Smith - Cayman Business Systems, 8466 Lesourdsville-West Chester Road, West Chester, Ohio 45069-1929 - USA
(513) 341-6272

To contact me, click the Google Voice link below, enter Your Name and Your Phone Number and Google will ring your phone and connect you for free!

The Elsmar Cove Web Site is *CopyFree*
no new posts