Does anybody can give me a help about the calcuation about no defect on 6 sigma level
Quote the part of an article:
1. "Approximately 2700 parts per million parts/steps will fall outside the normal variation of +/- 3 Sigma. This, by itself, does not appear disconcerting. However, when we build a product containing 1200 parts/steps, we can expect 3.24 defects per unit (1200 x .0027), on average. This would result in a rolled yield of less than 4%, which means fewer than 4 units out of every 100 would go through the entire manufacturing process without a defect."
Question 1,
how to calculate the 4%, and how to calcuate only 4 units of every 100 would go through the entire process without a defect.
2. "In the same case of a product containing 1200 parts/steps, we would now expect only 0.0041 defects per unit (1200 x 0.0000034). This would mean that 996 units out of 1000 would go through the entire manufacturing process without a defect. To quantify this, Capability Index (Cp) is used."
Queation 2,
how to calculate the 996 unit from 1000 would go through entire process without defect?
Is it (1-0.0041)*1000=996? if like this , how to calcuate above the 3 sigma no defect level, is it (1-0.04)*100? that should be 96 product without defect through whole process, not 4 ?
thanks
Michael
|

8th June 2005, 01:31 PM
|
 |
Courtesy Access
Registration Date: Jan 2005
Location: Southeast Wisconsin
Age: 57
|
|
Posts: 9,211
Thanks Given to Others: 755
Thanked 2,293 Times in 1,547 Posts
Karma Power: 611
|
|
Quote:
|
Originally Posted by jackylpt
1. "Approximately 2700 parts per million parts/steps will fall outside the normal variation of +/- 3 Sigma. This, by itself, does not appear disconcerting. However, when we build a product containing 1200 parts/steps, we can expect 3.24 defects per unit (1200 x .0027), on average. This would result in a rolled yield of less than 4%, which means fewer than 4 units out of every 100 would go through the entire manufacturing process without a defect."
|
Just wanted to point out that the question is based on erroneous reasoning; just because .27% of the population may be expected to fall outside the +/- 3-sigma limits doesn't mean that any of those will be defective. Also, the .27% is included in "normal variation"--that's the whole idea. Where the limits are overlaid on the curve is a matter of choice. There's a very good chance that a point outside the limits is due to assignable cause, but it ain't necessarily so.
__________________
Some men are born mediocre, some men achieve mediocrity, and some men have mediocrity thrust upon them.-- Joseph Heller
Last edited by Jim Wynne; 8th June 2005 at 01:34 PM.
|

8th June 2005, 02:35 PM
|
 |
Forum Moderator
Registration Date: Sep 2003
Location: Kansas, USA
Age: 46
|
|
Posts: 900
Thanks Given to Others: 27
Thanked 249 Times in 150 Posts
Karma Power: 123
|
|
First of all, I agree with JSW05 that the article is poorly worded, in that outside 3 sigma is not necesarily defective.
If we assume that 0.27% (2700 ppm) are indeed defective, then with 1200 opportunities, the odds of no defects would be (1-0.0027)^1200 = 0.039 = 3.9%. You could also use the binomial distribution function - =BINOMDIST(0,1200,0.0027,TRUE) in Excel
With only 3.4 ppm, the probability of no defects becomes (1-0.0000034)^1200 = 0.996 = 99.6%
Does that get you on the right track?
Tim F
__________________
To wonder is to begin to understand.
|

12th June 2005, 02:46 PM
|
 |
Involved - Posts
Registration Date: Aug 2004
Location: Canada / Toronto
|
|
Posts: 38
Thanks Given to Others: 0
Thanked 0 Times in 0 Posts
Karma Power: 22 Karma: 10 
|
|
Quote:
|
Originally Posted by Tim Folkerts
First of all, I agree with JSW05 that the article is poorly worded, in that outside 3 sigma is not necesarily defective.
If we assume that 0.27% (2700 ppm) are indeed defective, then with 1200 opportunities, the odds of no defects would be (1-0.0027)^1200 = 0.039 = 3.9%. You could also use the binomial distribution function - =BINOMDIST(0,1200,0.0027,TRUE) in Excel
With only 3.4 ppm, the probability of no defects becomes (1-0.0000034)^1200 = 0.996 = 99.6%
Does that get you on the right track?
Tim F
|
thanks Tim
|
Lower Navigation Bar
|
|
|
|
Visitors Currently Viewing this Thread: 1 (0 Registered Visitors and 1 Unregistered Guests)
|
|
|
| Thread Tools |
Search this Thread |
|
|
|
| Display Modes |
Rate Thread Content |
Linear Mode
|
|
Posting Settings
|
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts
HTML code is Off
|
|
|
|
|