The Elsmar Cove Forum and Site Map The Elsmar Cove Wiki More Free Files The Elsmar Cove Forums Discussion Thread Index Post Attachments Listing Failure Modes Services and Solutions to Problems Elsmar cove Forums Main Page Elsmar Cove Home Page

Go Back   The Elsmar Cove Forum > Common Quality Assurance Processes and Tools > Six Sigma


The Elsmar Cove Forum SideBar!
Monitor the Forum
Monitor New Forum Posts
New Threads Feeds
RSS FeedRSS Feed
Sponsor Link










$ Contributor Forum Access
Courtesy Quick Links

Links that Elsmar Cove visitors will find useful in your quest for knowledge:


Howard's International Quality Services

Atul's Symphony Technologies

Dave Scott's Scott Quality Solutions

Praxiom Research Group


NIST's Engineering Statistics Handbook

IRCA - International Register of Certified Auditors

SAE - Society of Automotive Engineers

Quality Digest Portal

IEST - Institute of Environmental Sciences and Technology

ASQ - American Society for Quality


All the Important Standards and Related Web Sites in the World
Reply
 
Thread Tools Search this Thread Rate Thread Content Display Modes
  #1  
Old 7th July 2005, 12:33 PM
jackylpt's Avatar
jackylpt jackylpt is offline
Involved - Posts

Registration Date: Aug 2004
Location: Canada / Toronto
 
Posts: 38
Thanks Given to Others: 0
Thanked 0 Times in 0 Posts
Karma Power: 22
Karma: 10
jackylpt has less than 100 Karma points so far.
Let Me Help You How to calculate the sigma level of a process - Which one is right

I am confuse the how to calculate the sgima level of process, please tell me below which one is right and which is wrong clearly.

We have 1,000,000 productions, find defect is 8,000. defect opportunity is 1.

Then case 1
DPMO is 8,000 according to the ASQ six sigmal primer appendix, the sigmal level is 2.9 sigma(with 1.5 shift)

case2
DPU is 0.008 DPMO=0.008
Y= RTY= e-DPU=0.992
Probablity of defect is P(d)=1-Y = 1-0.992=0.008
then use Z value table is 2.41
and add 1.5 shift, then the sigma level is 2.41+1.5=3.9 sigmal

Case3.
using formula sigmal level= 0.8406+ SQRT(29.37-(2.221*ln(PPM)))
then 0.846+SQRT(29.37-(2.221*ln8000))=3.9 sigmal

question 1:
the resuult of case 2 and 3 are different with case1 which one is right?
question2:
if we want to know the cpk of this process, is 8,000/1,000,000=0.8% just P value(because it is attribute data), that is right?

thanks

Michael
Reply With Quote

Sponsored Links
  #2  
Old 7th July 2005, 01:29 PM
cyberspider's Avatar
cyberspider cyberspider is offline
Involved - Posts

Registration Date: Jun 2005
Location: india
 
Posts: 33
Thanks Given to Others: 10
Thanked 1 Time in 1 Post
Karma Power: 18
Karma: 15
cyberspider has less than 100 Karma points so far.
Default Good to have doubt.....It's a way to gain knowledge

I have been using the Case-2 i.e. taking help of Z table - a De Facto standard.

Thanks,,
Reply With Quote
Sponsored Links

  #3  
Old 7th July 2005, 06:26 PM
Tim Folkerts's Avatar
Tim Folkerts Tim Folkerts is offline
Forum Moderator

Registration Date: Sep 2003
Location: Kansas, USA
Age: 46
 
Posts: 900
Thanks Given to Others: 27
Thanked 249 Times in 150 Posts
Karma Power: 123
Karma: 3974
Tim Folkerts is appreciated, and has over 1700 Karma points.
Tim Folkerts is appreciated, and has over 1700 Karma points.Tim Folkerts is appreciated, and has over 1700 Karma points.Tim Folkerts is appreciated, and has over 1700 Karma points.Tim Folkerts is appreciated, and has over 1700 Karma points.Tim Folkerts is appreciated, and has over 1700 Karma points.Tim Folkerts is appreciated, and has over 1700 Karma points.Tim Folkerts is appreciated, and has over 1700 Karma points.Tim Folkerts is appreciated, and has over 1700 Karma points.
Default

There is an online calculator at

http://www.isixsigma.com/sixsigma/si...asp?m=advanced

It agrees with the second two calculations (i.e. 3.9 sigma). I have to assume the table you used in Case 1 is wrong. Perhaps it was for a shift of 0.5 instead of 1.5. Perhaps it was simply mis-typed.

Tim F
__________________
To wonder is to begin to understand.
Reply With Quote
  #4  
Old 24th July 2005, 06:26 PM
Arvind Arvind is offline
E-Mails Invalid or Rejected

Registration Date: Oct 2004
Location: Canada
 
Posts: 58
Thanks Given to Others: 0
Thanked 3 Times in 3 Posts
Karma Power: 0
Karma: 24
Arvind has less than 100 Karma points so far.
Default Six sigma always refers to short term capability

Due to higher sources of variation, long term capability is alway lower than short term capability.
Six sigma always refers to short term capability. A factor of 1.5 sigma is applied to account for common cause meanshift which can happen both in favorable or unfavorable directions.

Six sigma capability in Short term is expected to reduce upto 6-1.5= 4.5 sigma in Long term. When you divide sigma by 3, you get capability. This means that short term six sigma or capability of 2.0 is expected to reduce to 4.5 sigma or capability of 1.50.

In your case, if you are interested in short term, sigma value is 3.9 which can reduce to 2.4 in long term.

Hope this clarifies.
Reply With Quote
Reply

Lower Navigation Bar
Go Back   The Elsmar Cove Forum > Common Quality Assurance Processes and Tools > Six Sigma

Bookmarks


Visitors Currently Viewing this Thread: 1 (0 Registered Visitors and 1 Unregistered Guests)
 
Thread Tools Search this Thread
Search this Thread:

Advanced Forum Search
Display Modes Rate Thread Content
Rate Thread Content:

Posting Settings
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump

Similar Discussion Threads
Discussion Thread Title Thread Starter Forum Replies Last Post or Poll Vote
Confusion DPU, PPM & DPMO vs. Sigma Level - ASQ Six Sigma Black Belt hand book Stephane Dubreuil Six Sigma 8 19th June 2009 01:57 PM
Sigma Level and Capability - What are Ppu, Ppl, Sigma Level, Sigma Capability fed-up Capability, Accuracy and Stability - Process, Machine, etc. 6 6th May 2009 08:24 AM
How to correctly calculate sigma level for production processes Przemek Six Sigma 2 24th April 2009 07:23 PM
How to calculate the sigma level of a process and Relationship of DPMO jackylpt Six Sigma 7 1st August 2008 06:27 PM
How do I calculate sigma for attribute data of process - Coating spoliation jackylpt Six Sigma 5 25th October 2005 06:26 AM



The time now is 03:49 AM. All times are GMT -4.
The time zone can be changed in your UserCP --> Options.



   

All Y'All Come Back Now, Y' Hear?

Made With A Mac! FreeBSD OS Powered by Apache!
Using php4 Forums provided and maintained by Marc Smith Database by MySQL

FAIR USE and CORRECTNESS NOTICE: This site contains copyrighted material the use of which has not always been specifically authorized by the copyright owner. We are making such material available in our efforts to advance understanding of environmental, political, human rights, economic, democracy, scientific, and social justice issues, etc. We believe herein constitutes a 'fair use' of any such copyrighted material as provided for in section 107 of the US Copyright Law. In accordance with Title 17 U.S.C. Section 107, the material on this site is distributed without profit to those who have expressed a prior interest in receiving the included information for research and educational purposes. For more information go to: http://www.law.cornell.edu/uscode/17/ If you wish to use copyrighted material from this site for purposes of your own that go beyond 'fair use', you must obtain permission from the copyright owner. In addition, I do not guarantee the correctness of the content. The risk of using content from the Elsmar Cove web site and forums remains with the user/visitor.

Responsibility Statement: Each person is responsible for anything they post in the Elsmar Cove forum. Neither I, Marc Timothy Smith, nor any of the forum Moderators, are responsible for the content of posts people make. Liability for post content resides with the poster as does interpretation and/or acceptance and/or use of advice by the reader.

Complaints: If you have a complaint with a post in a forum discussion thread, including Content in general, fighting, flaming, copyright infringement, defamation and/or 'slander', please use the 'Report This Post Report This Post Button button which appears at the top of every post in every thread.

Site courtesy of:
Marc Timothy Smith - Cayman Business Systems, 8466 Lesourdsville-West Chester Road, West Chester, Ohio 45069-1929 - USA
(513) 341-6272

To contact me, click the Google Voice link below, enter Your Name and Your Phone Number and Google will ring your phone and connect you for free!

The Elsmar Cove Web Site is *CopyFree*
no new posts