The Elsmar Cove Forum and Site Map The Elsmar Cove Wiki More Free Files The Elsmar Cove Forums Discussion Thread Index Post Attachments Listing Failure Modes Services and Solutions to Problems Elsmar cove Forums Main Page Elsmar Cove Home Page

Go Back   The Elsmar Cove Forum > ISO (International Organization for Standardization) Standards > ISO 17025 - Calibration, Measurement Gages and Test Laboratories > Measurement Uncertainty (MU)


The Elsmar Cove Forum SideBar!
Monitor the Forum
Monitor New Forum Posts
New Threads Feeds
RSS FeedRSS Feed
Sponsor Link










$ Contributor Forum Access
Courtesy Quick Links

Links that Elsmar Cove visitors will find useful in your quest for knowledge:


Howard's International Quality Services

Atul's Symphony Technologies

Dave Scott's Scott Quality Solutions

Praxiom Research Group


NIST's Engineering Statistics Handbook

IRCA - International Register of Certified Auditors

SAE - Society of Automotive Engineers

Quality Digest Portal

IEST - Institute of Environmental Sciences and Technology

ASQ - American Society for Quality


All the Important Standards and Related Web Sites in the World
Reply
 
Thread Tools Search this Thread Rate Thread Content Display Modes
  #1  
Old 19th July 2005, 07:01 PM
luluthecat luluthecat is offline
Shy Poster (1 to 5 Posts)

Registration Date: Jun 2005
Location: southern california
 
Posts: 3
Thanks Given to Others: 0
Thanked 0 Times in 0 Posts
Karma Power: 18
Karma: 10
luluthecat has less than 100 Karma points so far.
Please Help! % Uncertainty Budgets - Auditor wants to see my uncertainty budget represented as a %

Hi everyone,

I have an assesor (for 17025 accreditation) coming out and he wants to see my uncertainty budget represented as percentages.

Does anyone have an idea how I would convert this into a percentage?
All my contacts at other cal labs have never heard of this.
The assesor said that my calculations are correct, but he wants to see them as percentages. Does ISO even require the budget to be represented as percentages?

Any suggestions would be very much appreciated!
Reply With Quote

Sponsored Links
  #2  
Old 19th July 2005, 10:18 PM
Hershal's Avatar
Hershal Hershal is offline
Metrologist-Auditor

Registration Date: Mar 2004
Location: So Cal, California, U.S.
Age: 53
 
Posts: 1,621
Thanks Given to Others: 1
Thanked 310 Times in 224 Posts
Karma Power: 186
Karma: 6526
Hershal is appreciated, and has over 1700 Karma points.Hershal is appreciated, and has over 1700 Karma points.
Hershal is appreciated, and has over 1700 Karma points.Hershal is appreciated, and has over 1700 Karma points.Hershal is appreciated, and has over 1700 Karma points.Hershal is appreciated, and has over 1700 Karma points.Hershal is appreciated, and has over 1700 Karma points.Hershal is appreciated, and has over 1700 Karma points.
Default

Without knowing the parameter(s), it is difficult to say whether your scope is typically expressed in percentages.

Some scopes have parameters that are in fact typically expressed in percentages. As an example, force-compression can and often is expressed as a percentage, but can also have specific numbers for the uncertainty.

Hope this helps a bit.

Hershal
Reply With Quote
Sponsored Links

  #3  
Old 20th July 2005, 04:51 AM
W. de Jong's Avatar
W. de Jong W. de Jong is offline
Getting Involved (6 to 9 Posts)

Registration Date: Jun 2005
Location: Netherlands
Age: 37
 
Posts: 26
Thanks Given to Others: 0
Thanked 0 Times in 0 Posts
Karma Power: 19
Karma: 10
W. de Jong has less than 100 Karma points so far.
Default % uncertainty budget

Your assesor may be asking this for his own convenience. We use the document EA-4/02 "expression of uncertainty..~" and it says in 4.9 that table 4.1 is an example. This table contains a contribution to the standard uncertainty but is absolute. For your own convenience you might want to convert that into relative percentages to instantly get an insight on the biggest contributor. But not just to please your assesor.
Btw this might be different for non-european countries, maybe find a equivalent to such a document. But i'm quite sure the ISO17025 says nothing about percentages.

Hope this may be of any help.

BR.

EA-4/02 [270 Kb]: http://www.european-accreditation.or...-4-02rev01.pdf
Reply With Quote
  #4  
Old 20th July 2005, 09:55 AM
JerryStem's Avatar
JerryStem JerryStem is offline
Involved - Posts

Registration Date: Apr 2001
Location: W Chester OH USA
 
Posts: 269
Thanks Given to Others: 0
Thanked 2 Times in 2 Posts
Karma Power: 41
Karma: 36
JerryStem has less than 100 Karma points so far.
Default

ISO doesn't require it to be expressed in any certain form, to my knowledge. It depends on what you're measuring and how typically it can be expressed.

I hapen to have mine expressed as a percentage for convenience. I don't need a very detailed, minute uncertainty budget. Most of our customers have never heard of MU and the ones that have only need it because QS9K says they do.

I express my MU as a % of the marked value of the thickness standard for coating/plating thickness measurement instruments. I factor in the master standard's tolerance (+/-5%), working std (same), and a few small variables.

I get a fairly large % (8.8%) but it makes sense, A2LA is FINALLY happy (even had a special 1.5 day free visit from an assessor to check us out). and our customers still don't care.

Jerry
Reply With Quote
  #5  
Old 20th July 2005, 02:43 PM
Hershal's Avatar
Hershal Hershal is offline
Metrologist-Auditor

Registration Date: Mar 2004
Location: So Cal, California, U.S.
Age: 53
 
Posts: 1,621
Thanks Given to Others: 1
Thanked 310 Times in 224 Posts
Karma Power: 186
Karma: 6526
Hershal is appreciated, and has over 1700 Karma points.Hershal is appreciated, and has over 1700 Karma points.
Hershal is appreciated, and has over 1700 Karma points.Hershal is appreciated, and has over 1700 Karma points.Hershal is appreciated, and has over 1700 Karma points.Hershal is appreciated, and has over 1700 Karma points.Hershal is appreciated, and has over 1700 Karma points.Hershal is appreciated, and has over 1700 Karma points.
Default

The best advice for scopes is to obtain the ILAC document , available at no cost on the ILAC website. It does not specify percent or number, but does give good guidance on scopes.

http://www.ilac.org

Hershal
Reply With Quote
  #6  
Old 20th July 2005, 07:19 PM
luluthecat luluthecat is offline
Shy Poster (1 to 5 Posts)

Registration Date: Jun 2005
Location: southern california
 
Posts: 3
Thanks Given to Others: 0
Thanked 0 Times in 0 Posts
Karma Power: 18
Karma: 10
luluthecat has less than 100 Karma points so far.
Default



Thank you everyone for all your help!

I just think I might make it through this A2LA audit!!!
Reply With Quote
Reply

Lower Navigation Bar
Go Back   The Elsmar Cove Forum > ISO (International Organization for Standardization) Standards > ISO 17025 - Calibration, Measurement Gages and Test Laboratories > Measurement Uncertainty (MU)

Bookmarks


Visitors Currently Viewing this Thread: 1 (0 Registered Visitors and 1 Unregistered Guests)
 
Thread Tools Search this Thread
Search this Thread:

Advanced Forum Search
Display Modes Rate Thread Content
Rate Thread Content:

Posting Settings
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump

Similar Discussion Threads
Discussion Thread Title Thread Starter Forum Replies Last Post or Poll Vote
Uncertainty Budget - Gage Blocks Daniel Walker Measurement Uncertainty (MU) 7 12th June 2008 11:33 AM
ISO 17025 MU Requirements - Construction Material Testing Lab Uncertainty Budgets Backscatter Measurement Uncertainty (MU) 9 27th October 2007 02:47 PM
Measurement Uncertainty (MU) Budget for a 0-1 inch Micrometer rich.dittmanjr Measurement Uncertainty (MU) 3 10th May 2005 08:23 AM
Mercury in Glass Thermometer Uncertainty Budget Silverhill Measurement Uncertainty (MU) 1 11th November 2004 05:11 PM



The time now is 11:52 AM. All times are GMT -4.
The time zone can be changed in your UserCP --> Options.



   

All Y'All Come Back Now, Y' Hear?

Made With A Mac! FreeBSD OS Powered by Apache!
Using php4 Forums provided and maintained by Marc Smith Database by MySQL

FAIR USE and CORRECTNESS NOTICE: This site contains copyrighted material the use of which has not always been specifically authorized by the copyright owner. We are making such material available in our efforts to advance understanding of environmental, political, human rights, economic, democracy, scientific, and social justice issues, etc. We believe herein constitutes a 'fair use' of any such copyrighted material as provided for in section 107 of the US Copyright Law. In accordance with Title 17 U.S.C. Section 107, the material on this site is distributed without profit to those who have expressed a prior interest in receiving the included information for research and educational purposes. For more information go to: http://www.law.cornell.edu/uscode/17/ If you wish to use copyrighted material from this site for purposes of your own that go beyond 'fair use', you must obtain permission from the copyright owner. In addition, I do not guarantee the correctness of the content. The risk of using content from the Elsmar Cove web site and forums remains with the user/visitor.

Responsibility Statement: Each person is responsible for anything they post in the Elsmar Cove forum. Neither I, Marc Timothy Smith, nor any of the forum Moderators, are responsible for the content of posts people make. Liability for post content resides with the poster as does interpretation and/or acceptance and/or use of advice by the reader.

Complaints: If you have a complaint with a post in a forum discussion thread, including Content in general, fighting, flaming, copyright infringement, defamation and/or 'slander', please use the 'Report This Post Report This Post Button button which appears at the top of every post in every thread.

Site courtesy of:
Marc Timothy Smith - Cayman Business Systems, 8466 Lesourdsville-West Chester Road, West Chester, Ohio 45069-1929 - USA
(513) 341-6272

To contact me, click the Google Voice link below, enter Your Name and Your Phone Number and Google will ring your phone and connect you for free!

The Elsmar Cove Web Site is *CopyFree*
no new posts